How To Calculate Sunday As Weekend In A Code
Nov 6, 2013How to calculate weekend (ONLY SUNDAY) in VBA.
View 3 RepliesHow to calculate weekend (ONLY SUNDAY) in VBA.
View 3 RepliesI have a start date in cell A1(5/15/2009) and a end date in cell B1(5/25/2009).
I would like to calculate the leadtime between the 2 dates in cell C1 excluding the Sundays in between.
I have out a formula(in cell c1) as B1-A1 but it is yielding 14 days whereas it should be12 days excluding Sundays.
I am looking for Macro code preferably to get list of dates with Saturday / Sunday in a separate columns which falls Saturday and Sunday on imputing the year.
View 5 Replies View RelatedI have a date and need to formula to tell me the date of the Sunday that occurs before it.
For example I want to it tell me that the Sunday before 13/05/2014 is 11/05/2014.
I am trying to update a spreadsheet for 2012 to 2013 and want to use a formula to change SUNDAY 8 January to Sunday 9 January and so on for rest of year.
View 1 Replies View RelatedI have a sheet with alle days an date in one month
in column "A" the date (format: TTTT TT.MM.JJ)
in column "B" I have the worked hours
Below in the sheet I would to have to sums
each one for weekdays and weekends,
because my guys get more money if they work on a saturday or sunday.
I have been playing with the formulars
=sumif(weekdays(....., but cant geht the right thing
F4 has a macro calendar. I want, if a weekend is selected on the calendar, to display a message that only weekdays are allowed.
Here is the hard part. I have the Analysis ToolPak installed within Excel, but cannot import it into VBA as a reference. It will be in conflict with some of the code I have. It does not allow code in Workbook_Open to execute correctly. So I have to work around this.
Private Sub Calendar1_Click()
ActiveCell.Value = Calendar1.Value
Range("E4").Value = Evaluate("WEEKDAY(F4,2)")
If Range("E4").Value = (Monday-Friday) Then
Range("F5").Select
Unload Me
Else
Range("E4").Value = (Saturday or Sunday)
Range("F5").Select
MsgBox ("Please select a valid business day. Weekends and Holidays are invalid.")
Unload Me
End If
2 Things:
1. How do I list
Range("E4").Value = (1,2,3,4,5)
2. Is there a better way of doing this? As far as determining a weekend and displaying error message if it is.
If I have 1 Jan thru 31 Dec in A1 - A365, is there a way I can identify every weekend by placing 'X' in Col B alongside every occurrence of Saturday and Sunday?
View 2 Replies View RelatedI'm trying to divide the hours between 2 given times in blocks:
i.e.: monday 0600 - 1400 = 8 hrs
2400-0700 [mon - fri] = 1
0700-1800 [mon - fri] = 7
1800-2400 [mon - fri] = 0
0000-2400 [weekend]
I got the first 3 blocks working but got stuck with the 4th one.
It should count only those hours between saturday morning 0000 and sunday night 2400 if it concerns a weekend day. and actually these hours should not be calculated in the first 3 time blocks.
I'm currently using the macro below to modify the two cells next to a date field in a template. The number of rows this will run through could vary from 2 to over 1 million, but the columns will always be the same. Because of the size of the datasets, this macro can run for quite a while, which is fine, but I'm thinking there's probably a better way to do it. To clarify, the object of this part of the macro is to determine if the date falls on a Saturday, and if so, change the value of the two cells to the right of the date to "0"
View 5 Replies View RelatedIs there a quick way to find weekend dates in excel? I tried pasting all 2006 dates into J2:J366 using the fill handle. It has weekdays as an option but not weekend dates. Any easy way (formula or simpler) to find the weekend dates in this range?
View 2 Replies View RelatedI've got the following issue. I want to use the function =TODAY() + 2.
Because it's thursday 6-2 today, the outcome will be saturday 8-2.
The problem is that I want to exclude weekend in this formula, so the function must give monday 10-2 as the answer.
1 have figured out how to create an auto fill that is a mix of days in between. (When dates are not in a row.) For example, a schedule that starts a date, and then adds 2 days, then 1 day, then 3 days etc....it is for a tracking schedule. Once created those amounts are the same for for every row. The problem is, when it counts the next day, or 2 days or 3 days etc, it cannot include a weekend date, rather just 2 working days, or 3 working days etc.
Is this possible?
Right now, I start my first cell with a date, and go to the cell to the right, and in my formula, I type the previous cell address and I add (+) some value (2) to represent the day amount, but right now it includes the weekend days as well, and I need them skipped.
Please see attached Excel File.
I would like to calculate Column D depending on below criteria.
1. if both date is same than normal Column C-Column B.
2. if both date is not same than time diifrence should not be count after 17:30 to next day 08:30.
3. I do not want to include weekend (SAT & SUN) time diffrence if both date have.
In column D I have filled two cells that I want by formula.
I am attempting to create a rotating weekend work schedule in Excel to make life easier. There are 30 people who rotate Saturday's and Sunday's every month. Technically, they are only supposed to work 2 weekends a month, and am attempting a way to create this in Excel to make it more fair to the group instead of just picking and choosing which weekend these employees work, I would like an Excel program to do this for me.
View 1 Replies View RelatedI am given the year (say 2009) in Cell A1.
The requirement is to put the date of last sunday of the year (2009) in cell A2. how to do this?
I have a list of reports for many countries, I need to make sure each report is there for every country, except for weekend days.
report check.xlsx
I have to create VBA according to these criterias. I have a list of 22 rates that i need to distribute by order for a month period (30 days) noting that I need to skip weekends (Friday and Saturday)
Day 123.06.2014Monday20%
Day 224.06.2014Tuesday10%
Day 325.06.2014Wednesday7%
[Code]....
create this formula so that each time I change the date the rates are distributes accordingly
I need a formula that will give a warning if the date entered in cell is a weekend day.
View 2 Replies View RelatedI need to make a schedule for testing where I check the samples every 3 days but if that date hits on a weekend I want it to role over to the monday if it hits on a Sunday and Friday if it hits on a Saturday. In other words wait an extra day if it hits on a Sunday and check the sample a day early if it would normally be on a Saturday.
I have been playing around with the WORKDAY command and some of the other date functions but I can't figure this one out.
If I am using today's date, example: 5/30. I am looking to populate the next 10 business days.
Example: 5/31, 6/3. 6/4 etc.
I want to exclude weekends and holidays. I believe the following formual works to exclude weekends, but not sure how to incorporate holidays in the mix. =workday(today(),1) for one day after today, and then just keep increasing the number for days out.
In my helpdesk spreadsheet, Column C has the date a request is received and Column D has the day it is signed off as complete.
This is used to compare how many days it takes before each request is completed.
Column B is usually blank, but, if the day a request is due to be completed is in the future, such as waterblasting set for 5 working days ahead, then the expected completion date is in Column B. As we don't want a report to show it took five days to complete, when 5 days was waiting for the booked job, we only want five days when we are working on it for five days.
So a typical request is received on Monday 1st January (C), completed on 3rd January (D), taking 3 working days to complete.
A less typical is a request received on Monday 1st January (C), booked to be done on the 4th January, (B). If the job is completed on the 4th, then that will be entered into (D). And we want it show as taking 1 day or less to complete.
I'm quite new to excel formulas , but would like to know the format for
IF B = Empty, then display the days (minus holidays and minus weekends) between C & D.
IF B = non-blank, then display the days (minus holidays and minus weekends) between B & D.
I've tried to play with the Workday function but it and the format of the IF function seem just beyond my grasp, depsite it simplicity, so hopefully a bit more insight as i get to grips with formulas would help me out...
how to count days excluding only sundays in a calender period.
"weekdays" excludes both saturdays and sundays.
Auto Hilighting Day & Date For Sunday. i tried but no use.
View 2 Replies View RelatedIs there a way to make the date in a cell check the current date then fall back to the previous sunday unless today actually happens to be sunday? So for example it would look at today and make the date 12/9/2007 rather than 12/14/2007
View 11 Replies View RelatedI would like to use Validation to verify that the date entered in cell "B3" is a Sunday. Or do I have to go at this some other way?
View 4 Replies View RelatedI have an excel sheet that uses date formulas in order to provide data regarding the date that it brings up. My problem is that the formulas do not bring up dates unless the dates are on a weekday. Ex. I would like to look back 3 months in the past, and I do so using the formula =today()-90 (90 for 90 days, about 3 months). I would then like to input this date formula into another function (potentially an if function) so that if today-90 is a saturday or a sunday, the function will automatically bring up the date for the friday preceding it.
View 2 Replies View RelatedThe required results from the below data are:
Required Result
Week 25 = Batches 25
Week 26 = Batches 40
Data
Data - Day
No. of Batches
16/06/14 Mon
5
17/06/14 Tue
6
18/06/14 Wed
9
[Code] ..........
I am trying to format a row (B) if B8 = Saturday or Sunday.
The value in B8 is derived from a formula.
I have tried the following but it only works if cell is typed manually.
Private Sub Worksheet_Change(ByVal Target As Range)
On Error GoTo stoppit
Application.EnableEvents = False
With Me.Range("B8")
If .Value = "Saturday" Or .Value = "Sunday" Then
Me.Range("B8:J8").Font.ColorIndex = 2
End If
End With
stoppit:
Application.EnableEvents = True
End
End Sub
I also want to change format back if cell changes to M-F.
Excel 97
In B13 I have the start date: 12/1/2008
In C13 I have the end date: 1/5/2009
In cell D13 I want a formula that counts the number of days between the two dates that are not Sunday. The start and end dates are included in the count.
I have created this formula using Ctrl + Shift + Enter:
{=SUM(IF(WEEKDAY(ROW(INDIRECT(B13&":"&C13)),2)7,1,0))}
I have also created this formula using Ctrl + Shift + Enter:
{=SUM(IF(TEXT(ROW(INDIRECT(B13&":"&C13)),"ddd")"Sun",1,0))}
They both seem to work. I get a result of 31.
Is there a formula that is better than this, more efficient than this, or "less expensive"?