Time Calculation - Ignore Weekend
Please see attached Excel File.
I would like to calculate Column D depending on below criteria.
1. if both date is same than normal Column C-Column B.
2. if both date is not same than time diifrence should not be count after 17:30 to next day 08:30.
3. I do not want to include weekend (SAT & SUN) time diffrence if both date have.
In column D I have filled two cells that I want by formula.
View Complete Thread with Replies
Sponsored Links:
Related Forum Messages:
Ignore Certain Cells - Trying To Calculate The Time Taken Between Queries
[url] In the above, i am trying to calculate the time taken between queries. I do not want any times/queries that are from someone else on the network to be counted. I need something to ignore the blank cells, and take data from the next cell above which has data. I3, I8 and I14 are currently the trouble spots, and should be displaying 00:00:00, 00:04:00 and 00:06:00 respectively. Note that someone from the network could have literally thousands in a row before I perform another query, not just alternating like the screenshot. B is the real life time the query was performed. F is how long the query took. F does not take in to account the seconds between queries, which build up, so i am using B.
View Replies!
View Related
Calculation Of Time With Two Different Time Formats
Need a point in the right direction with this one! I want to calculate the difference between two time values, the problem is there two different formats as below:- 1) 520.00 - this is a number format 2) 500:00:00 - this is a time format HHH MM SS What could I use to show I have a 20.00 hour difference???
View Replies!
View Related
Calculation On Time
I have been burning brain cells trying to figure this out. I get these numbers from an online source and they come in like this: A B C D E 1/1/0912:01AM02:40AM11:18AM07:55PM The times do not come in as times...when I format the cell to time it doesnt change...that is my first problem. What I would need to do to these times is: take B and C and find what time is in the middle of them and put that in a different column. This mess will also need to be plotted on a chart with time by the minute for one day as the X axis. In my example I drew lines on the chart to show what I mean....the blue lines I dont want charted...I use those to find the time in the middle.
View Replies!
View Related
Time Calculation ...
Having been looking round this site for quite some time now and always finding what I needed I am now a registered member who needs your expertise. I have a spreadsheet for which I need to calculate hours worked depending on a few criteria. [data] ... The criteria is that Sat/Eve is 8pm to 6am weekdays and midnight to midnight on a saturday. Sun is midnight to midnight on a sunday, BH is a bank holiday and basic is everthing else. What I want to know is it these columns can be populated automatically using formulas. I would really appreciate it if someone out there is up to completing this challange, as I have to manually populate this at the moment and it can be 5000+ lines long (it takes hours). If i need to change the layout it's not a problem, whatever it takes to automate it has got to be worth the effort.
View Replies!
View Related
Same Time Calculation
I am trying to get a total column that will give the total only when two particular devices are down at the same time. This total will be taken from a long list of downtime entries for different devices but I only want the total when two particular devices are down, for example Devicedatedowntimedateuptimetotal time 102/01/0911:00:0002/01/0911:09:0000:09:00 202/01/0911:00:0002/01/0911:04:0000:04:00 202/01/0902/01/09 103/01/0903/01/09 303/01/0903/01/09 604/01/0904/01/09 204/01/0913:09:0004/01/0913:12:0000:03:00 104/01/0913:02:0004/01/0913:15:0000:13:00 505/02/0905/02/09 total 1/200:07:00 In the example I am just wanting to work out the total time when both device 1 and 2 were down at the same time, above the total would be 7 minutes because for 4 minutes on the 2/1/9 and 3 minutes on the 4/1/9 they were down at the same time.
View Replies!
View Related
Time Calculation
I have a time card sheet that I want to make automatically calculate the time I have worked. It is set up with four columns that can't be changed. The first column is "Time In(TI)", second column "Time Out(TO)", Third column "Time Taken For Lunch(TTFL)", and Finally "Hours Worked". I have no problem getting the formula to calculate the difference in "Time In" and "Time Out" but taking the 30 minutes out of that is causing a rift. If I put the 30 minutes in 00:30:00 format it will take it but it thinks it's 12:30:00 and it displays in 00:30:00 which I want it to display 30. Just to clarify, I am using =(TI-TO)-TTFL in the Hours Worked cell.
View Replies!
View Related
Calculation Of Time Formula
I am trying to calculate the response time between when a phone call comes into my workplace and when the responder calls back...I have created a formula that does this using the times and dates of when the calls were recieved and went back out. This works except when the call comes in on one day and goes back later in the day the next day, making the response time larger than 24 hours. I also have it set up to eliminate 15 and a half hours from the calculation because our place of business is not open during this time. Further details.... The formula currently being used is... =IF(G50=E50, H50-F50+(H50
View Replies!
View Related
Variable Time Calculation
[code] ...... =SUMIF($A:$A,">="&TODAY()-1,D:D)-SUMIF($A:$A,">"&TODAY(),D:D) calculates the total in Col D looking back from today. The results gives you 12:00. What I need is a formula that will look back from the current time to 24 hours in the past, NOT 1 day, to calculate the total in Col D. Looking back 24 hours, from 10:00am, the results would be 6:00. Since the first time on 12/12 has not arrive, it will not calculate it, but will look back from 10:00am on 12/12 to 10:00am on 12/11 and calculate a result of 6:00 hours.
View Replies!
View Related
Time Spent Calculation
I need to find out the total time an issue was 'open' (not resolved) during business hours. Issues come in and resolution time is based off of a priority. Priority 1 should be resolved in one hour, Priority 2 should be resolved in 4 hours, Priority 3 should be resolved in 1 business day (8 hrs), Priority 4 should be resolved in 2 business days (16 hrs), Priority 5 should be resolved in 5 business days (40 hrs), Priority 6 should be resolved in 10 business days (80 hours). I have start dates/times field in a column (mm/dd/yyyy hh:mm) , a resolution dates/times field in another column (mm/dd/yyyy hh:mm) and a priority in another column (1-6). I need to calculate the time an issue is in open status (not resolved) based on it's priority but I need for it to take into consideration business hours (Monday thru Friday...7 am to 7 pm)...and not calculate time outside of 'business hours'.
View Replies!
View Related
How Do I Reduce Calculation Time
I am a big fan of huge files (30MB+) all interlinked with array formulas ...and lots of them. The problem is...one calculation take literally 5 hours. (I have one file I try to calculate since cca 4 hours now...it's at 63%) I keep getting extra memory with no visible improvement on the processing time. Is there a trick out there that I can use? Something is clearly wrong. I feel I will soon have to give up Excel, or my formulas, or my job ...
View Replies!
View Related
Formatting With Time Calculation
I have a calculation whereby I use two variables which are 1. Man hours left in the week formatted as [hh] and 2. Amount of work left to do in the week formatted as 0" Man Hrs" I need to carry out a calc which says:- Man hours left in the week - Amount of work left to do in the week. The answer should tell me if I have a deficit or surplus of hours which can then use for planning purposes. Unfortunately the problem I have is that I can't make the formatting the same for both unless someone knows of a workaround. Man hours left in the week = 128. Man hours required to complete all work this week = 224. Therefore I need to say 128-224 = -96. However when I do this this an answer of 16 is returned.
View Replies!
View Related
Textbox Time Calculation
I'm attempting to calculate the total number of hours between a start time and end time using textboxes on a Userform. Here is my latest attempt: Private Sub D24_Exit(ByVal Cancel As MSForms.ReturnBoolean) Dim myvalue As String Dim myhour As String Dim myminutes As String myvalue = D24.Value Select Case Len(D24) Case 1 myhour = "0" & Mid(myvalue, 1, 1) myminutes = "00" Case 2 myhour = Mid(myvalue, 1, 2) myminutes = "00" Case 3 The above codes are an attempt to force an entry as time (7, 07, 700, 0700=7:00 / 13, 1300=13:00 etc.). However, the result is not correct. For example: Start Time in Textbox(D24)=07:00 End Time in Textbox(D25)=17:30 Result in Textbox(D27)=0.4375 Desired Result in Textbox(D27)=10.5 I've never calculated times in textboxes,
View Replies!
View Related
Subtotals And Time Calculation
I am trying to calculate the time spent on each task. I have column A with Task IDs and column B with Time. Column A could have the same task ID repeated but the column B has the time for each entry. There is only start time for each task. Where the Task is repeated, want to know how many times the task has taken place and overall time spend on one task ID, calculating from the first entry to the last entry.
View Replies!
View Related
Ignore Duplicate, Ignore Then Paste
I have in column D starting D9, I have numbers starting at 1, and may finish at 100. But there could be duplicates, 1,2,3,3,4,5,6,6,7,7,8,9,10,10,11,12,13,......... I would like to only copy the range D9 to H (End of column D), ignoring all the duplicate numbers, to another sheet. So on the second sheet, it would be 1,2,3,4,5,6...... with the data copied from E,F,G and H.
View Replies!
View Related
Time Calculation With Colored Cells
I was looking for a solution through the excel questions but could not find anything which would help me. As you can see in column B are two different colored Sun, red and magenta as well as Mon and Tue. I would like to find a formula or macro without creating an extra column which looks for the color magenta i.e. if the particular cells are magenta (Sun, Mon and Tue) then perform an action. I cannot use the formula in K7. ******** ******************** ************************************************************************>Microsoft Excel - Time Calculation with color cells.xls___Running: 11.0 : OS = Windows XP (F)ile (E)dit (V)iew (I)nsert (O)ptions (T)ools (D)ata (W)indow (H)elp (A)boutE4F4H4K4E5F5H5K5E6F6H6K6E7K7E8K8K9E10F10H10K10K11K12E13F13H13K13E14K14E15K15E16K16E17F17H17K17E18H18K18= ABCDEFGHIJK1Month: 2Working - Hours 15% 35% 3DayWeekdayStartEndHoursStartEndHoursStartEndHours414Fri20:000:0004:0020:000:0004:00 515Sat0:006:0006:000:006:0006:00 615Sat20:000:0004:0020:000:0004:00 716Sun0:006:0006:00 0:006:0006:00816Sun19:000:0005:00 19:000:0005:009?? 1022Sat20:000:0004:0020:000:0004:00 1123Sun0:006:00 0:006:0006:001223Sun19:000:00 19:000:0005:001324Mon0:005:0005:000:005:0005:00 1424Mon20:000:0004:00 20:000:001525Tue0:006:0006:00 0:006:001625Tue19:000:0005:00 19:000:001726Wed0:005:0005:000:005:0005:00 18 54:00 28:00 22:00Timesheet [HtmlMaker 2.42] To see the formula in the cells just click on the cells hyperlink or click the Name box PLEASE DO NOT QUOTE THIS TABLE IMAGE ON SAME PAGE! OTHEWISE, ERROR OF JavaScript OCCUR.
View Replies!
View Related
Calculation Time And Charge Rates
I am trying to figure out a formula to figure out how much to charge for hrs of a rental. There is an automatic $1000 charge regardless of time used. the rate chart is as follows: $1000 + hourly charge = total =<50 hrs= $15/hr >50hrs but <100hrs= $6.50/hr >100hrs=$4.10/hr ex: so is A1= 200hrs then i want B1 to equal $1820.($1000 + (200 x 4.1))=1820. I have an idea on how to write the formula, but i am having a little bit of trouble with it.
View Replies!
View Related
Calculating Time, Timesheet Calculation
I am working on a project involving calculating time. It is a timesheet calculation. I was able to design the following layout: .....A............B..........C..........D.......E.....F 1....Date.........Time IN....Time OUT...Hours... Total 2....01/01/07.....1830.......1930.......01:00...01:00 3....01/02/07.....1930.......2330.......04:00...05:00 4....01/03/07......830.......1900.......10:30...15:30 5 Column A is formatted for DATE. Columns B and C are GENERAL. Columns D and E are DATE format customized as '[hh]:mm' The formula to calculate the time difference between the numbers in column B and C is located in column D. It is as follows: =IF(C4<1000,TIMEVALUE(LEFT(C4,1)&":"&RIGHT(C4,2)),TIMEVALUE(LEFT(C4,2)&":"&RIGHT(C4,2)))-IF(B4<1000,TIMEVALUE(LEFT(B4,1)&":"&RIGHT(B4,2)),TIMEVALUE(LEFT(B4,2)&":"&RIGHT(B4,2)))..................
View Replies!
View Related
Converting Long Time Calculation To UDF
I work with a lot of time based worksheets for a 24/7 operation and constantly use the formula: =IF($E17>$D17,(HOUR($E17)+(MINUTE($E17)/60))-(HOUR($D17)+(MINUTE($D17)/60)),((HOUR($E17)+24)+(MINUTE($E17)/60))-(HOUR($D17)+(MINUTE($D17)/60))) to calculate times worked where $D17 is start time and $E17 is finish time. Shifts can start and finish the same day ($E17>$D17) or go past midnight ($D17>$E17). To make matters even more interesting, there are a number of variables that require adding either "and" and/or "or" conditions to this formula so I can end up with several of these nested and it gets pretty complicated. I'd like to have a UDF so I can just enter the formula: =CalcTime(Start Time,Finish Time)
View Replies!
View Related
Date/Time Calculation For WeekEnds/After Business Hours
What calculation would I enter in a results cell if I wanted to find the delta between 2 times in date format that repersent just the business hours of 8am-5pm, therefore excluding after hours and weekends. eg. Date 1 Date 2 Result Time 23/07/07 8:00 24/07/07 14:55 15:55 So far I can't get the caluclation that will compensate for the after hours and week ends.
View Replies!
View Related
Time Calculation: Calculate How Many Hours Have Elapsed Between To Entries
I am trying to build a spreadsheet to calculate how many hours have elapsed between to entries; start time (H10) e.g. 9:15 AM and end time (I10) e.g. 12:15 PM. The formula that I am using in the calculation cell field (J10) is (I10-H10+(I10<H10))*24. This formula works great till I wish to include in an IF statement. What I would like is if the total hours calculated with the formula (I10-H10+(I10<H10))*24 is less than 4, return 4 (hours) otherwise the value. As well if there is no start time nor end time entered then return zero.
View Replies!
View Related
Weekend Shift Patterns
I'm trying to divide the hours between 2 given times in blocks: i.e.: monday 0600 - 1400 = 8 hrs 2400-0700 [mon - fri] = 1 0700-1800 [mon - fri] = 7 1800-2400 [mon - fri] = 0 0000-2400 [weekend] I got the first 3 blocks working but got stuck with the 4th one. It should count only those hours between saturday morning 0000 and sunday night 2400 if it concerns a weekend day. and actually these hours should not be calculated in the first 3 time blocks.
View Replies!
View Related
If Weekend Then Message Box
F4 has a macro calendar. I want, if a weekend is selected on the calendar, to display a message that only weekdays are allowed. Here is the hard part. I have the Analysis ToolPak installed within Excel, but cannot import it into VBA as a reference. It will be in conflict with some of the code I have. It does not allow code in Workbook_Open to execute correctly. So I have to work around this. Private Sub Calendar1_Click() ActiveCell.Value = Calendar1.Value Range("E4").Value = Evaluate("WEEKDAY(F4,2)") If Range("E4").Value = (Monday-Friday) Then Range("F5").Select Unload Me Else Range("E4").Value = (Saturday or Sunday) Range("F5").Select MsgBox ("Please select a valid business day. Weekends and Holidays are invalid.") Unload Me End If 2 Things: 1. How do I list Range("E4").Value = (1,2,3,4,5) 2. Is there a better way of doing this? As far as determining a weekend and displaying error message if it is.
View Replies!
View Related
Remove Weekend Values?
I'm currently using the macro below to modify the two cells next to a date field in a template. The number of rows this will run through could vary from 2 to over 1 million, but the columns will always be the same. Because of the size of the datasets, this macro can run for quite a while, which is fine, but I'm thinking there's probably a better way to do it. To clarify, the object of this part of the macro is to determine if the date falls on a Saturday, and if so, change the value of the two cells to the right of the date to "0"
View Replies!
View Related
Find Weekend Dates
Is there a quick way to find weekend dates in excel? I tried pasting all 2006 dates into J2:J366 using the fill handle. It has weekdays as an option but not weekend dates. Any easy way (formula or simpler) to find the weekend dates in this range?
View Replies!
View Related
Getting Autofill To Not Include Weekend Dates
1 have figured out how to create an auto fill that is a mix of days in between. (When dates are not in a row.) For example, a schedule that starts a date, and then adds 2 days, then 1 day, then 3 days etc....it is for a tracking schedule. Once created those amounts are the same for for every row. The problem is, when it counts the next day, or 2 days or 3 days etc, it cannot include a weekend date, rather just 2 working days, or 3 working days etc. Is this possible? Right now, I start my first cell with a date, and go to the cell to the right, and in my formula, I type the previous cell address and I add (+) some value (2) to represent the day amount, but right now it includes the weekend days as well, and I need them skipped.
View Replies!
View Related
Completion Dates - Weekend - Holidays In Office 2003
In my helpdesk spreadsheet, Column C has the date a request is received and Column D has the day it is signed off as complete. This is used to compare how many days it takes before each request is completed. Column B is usually blank, but, if the day a request is due to be completed is in the future, such as waterblasting set for 5 working days ahead, then the expected completion date is in Column B. As we don't want a report to show it took five days to complete, when 5 days was waiting for the booked job, we only want five days when we are working on it for five days. So a typical request is received on Monday 1st January (C), completed on 3rd January (D), taking 3 working days to complete. A less typical is a request received on Monday 1st January (C), booked to be done on the 4th January, (B). If the job is completed on the 4th, then that will be entered into (D). And we want it show as taking 1 day or less to complete. I'm quite new to excel formulas , but would like to know the format for IF B = Empty, then display the days (minus holidays and minus weekends) between C & D. IF B = non-blank, then display the days (minus holidays and minus weekends) between B & D. I've tried to play with the Workday function but it and the format of the IF function seem just beyond my grasp, depsite it simplicity, so hopefully a bit more insight as i get to grips with formulas would help me out...
View Replies!
View Related
Retrieving Variable Rows From Another Worksheet: Reducing "Calculation Time"
I'm using this formula to pick all rows from a huge range of cells "DATA" in another sheet, by matching the first column value (SAPDATA is the range that contains all the first column cells of DATA). {=IF(ROW($B49)-ROW($B$48)>COUNTIF(SAPDATA,$D$4),"",INDEX(DATA,SMALL(IF(SAPDATA=$D$4,ROW(SAPDATA)),ROW($B49)-ROW($B$48)),2))} All possible first column values have been stored as a dropdown in cell D4, and whenever I change the choice in the dropdown cell, the retrieval of those hundreds of rows takes ages in excel.
View Replies!
View Related
Counting Dates In A Range :: Count Weekend Dates
In Cells B2:B100, i have dates that which have been entered using a combo box (the dates type is for e.g. 14th March 2010 format) I want a formula that will count the cells that have dates between 1st April 2010 to 30th June 2010 in cells B2:B100 Also, I would like a formula that counts weekend dates between 1st April 2010 to 30th June 2010?
View Replies!
View Related
Sum Weekdays And Sum Weekend
I have a sheet with alle days an date in one month in column "A" the date (format: TTTT TT.MM.JJ) in column "B" I have the worked hours Below in the sheet I would to have to sums each one for weekdays and weekends, because my guys get more money if they work on a saturday or sunday. I have been playing with the formulars =sumif(weekdays(....., but cant geht the right thing
View Replies!
View Related
Macro To Remove Rows That Contains The Phrase "Off Peak" And "Weekend"
I have a spreadsheet with about 20,000 lines. (The number of rows fluctuate) I need a macro to remove (delete) rows that contains the phrase "Off Peak" and "Weekend" I was setting it up in a loop but I don't know how to make the loop end after ALL the "Off Peak" and "Weekend" info is removed. My macro just does a find then delete the row and then loop to the find again. Is there an easier way and can the "Off Peak" and "Weekend" statements be combined into one search Do While Cells.Find(What:=" Off Peak", After:=ActiveCell, LookIn:=xlFormulas, _ LookAt:=xlPart, SearchOrder:=xlByRows, SearchDirection:=xlNext, _ MatchCase:=False, SearchFormat:=False).Activate ActiveCell.Select Selection.EntireRow.Delete Loop
View Replies!
View Related
SUM To Ignore #N/A
I am trying to figure the sum of cells B12:B28. However some of the cells in the range have a #N/A error due to a VLOOKUP function that is pulling data from a different sheet. Currently the data it is pulling is a blank cell, but will at some point have a value in it. How can I make the SUM function ignore the #N/A?
View Replies!
View Related
Ignore #value With SUM
I have Dynamic named ranges (SUMPV) SUMPV is range I31:I300 I use the following formula to sum up. =SUM(SUMPV) The problem is that sume cells night produce #value thus giving an error in the Sum formula. I tried the =SUMIF(SUMPV,"#N/A") but not working..
View Replies!
View Related
Ignore #NUM!
I have a column of numbers that are calculated by a formula that doesn't always come up with an answer and returns the value #NUM!. See the attached XLS. The answer to the sum function is always #NUM! if a #NUM! is included in column of values put into the SUM function. I currently work around this issue by redoing the column with the SUM statement to avoid the #NUM!'s. Is there a logical test that can be applied to solve this issue? an I add another column that reset the #NUM! to ZERO and then SUM that column?
View Replies!
View Related
Display End Time Automatically Upon Entering Start Time And Time Usage
I have a worksheet which contains START TIME in column A, then TIME USAGE in column B and END TIME in column C. User enters start time, followed by the number of time usage in minutes, how could i possibly display the end time automatically in this scenario? how do you add the entered time usage to the start time to display the end time? Say if I enter 1:00 AM at start time and 00:15 minutes on time usage, how can 1:15 AM be displayed on the end time automatically?
View Replies!
View Related
How Do I Have A Graph Ignore Zero Value Cells
I have a graph that references a column which contains a formula. In the instances where this formula produces a zero value or a DIV/0 error, I would like the graph to contain a blank space. As it is now, the zero or DIV/0 cell graphs as a zero value. I have tried using an IF statement which takes any zero or error and replaces the cell value with "": IF(A5/A6=0,"",A5/A6) Even though the cell comes up as blank... a zero value still appears on the graph. The only way for me to have the graph ignore that cell is to go into the cell and delete the formula. This is unnacceptable b/c the data is updated daily... I do not want to have to go through my data every day and delete cells.
View Replies!
View Related
Sort And Ignore #N/A Error
Is it possible to sort a worksheet and either ignore #N/A error or have it drop to bottom of sort. I'm sorting a table by the highest value in a column bit all of the rows with the #N/A error are shown before the rows I want to see.
View Replies!
View Related
LOOKUP But Ignore Zeros
Have values in column B. Need to INDEX column B and pull across the first value of column A that is not a zero e.g. COLA.....COLB 000.......150 000.......150 056.......150 000.......150 000.......150 SO for all of these...150 would lookup the value 056 from column A
View Replies!
View Related
Ignore A Super Script
I am using the vlookup function to pull in values from another sheet that I will call sheet2. I am using a cell reference for the lookup value on sheet1. On sheet1, the value in the reference cell has a superscript "1" that corresponds to a footnote at the bottom of the page. The corresponding lookup value on sheet2 does not have any superscript. Is it possible to make the vlookup function ignore the superscript for the purpose of the lookup?
View Replies!
View Related
Ignore Input Prompt
I run a macro to open multiple workbooks and run a macro within those workbooks. All worked fine until a message/input box was included in the individual workbook macros [that I cannot change] to notify the single workbook user when the macro had successfully completed and prompts for an “ok” input. Can I get my macro to ignore this prompt and not wait for an input – I am currently clicking “ok” everytime it comes up on screen. Have searched help and forum but nothing jumps out.
View Replies!
View Related
|