Increase Maximum Value For Spinner Control
Jul 29, 2006
I am setting up a couple of spinners to control dates. Unfortunately, the maximum value for a spinner is 30000 which is some date in 1986. I need the dates to go from current through 2010.
View 4 Replies
ADVERTISEMENT
Apr 28, 2008
I need to detect all the spinner objects, and write on another worksheet the min and max properties...
View 4 Replies
View Related
Apr 10, 2008
I have a chart where I set lower and upper threshold lines by use of two spinners. It goes awry if you set the upper limit below the lower limit. Is there a way to set the minimum value of one spinner so that it can't go below the maximum value of the second one?
View 5 Replies
View Related
Jan 12, 2007
Is there any way (Through settings and/or VBA) to let the spinner function to increment by decimal value? The current setting allows the incremental value of 1.
View 2 Replies
View Related
Nov 2, 2006
I have a test due in the morning, and I really need this question answered ASAP, if anyone could. I need to create an IF formula for this situation: the standard Mhz is 500. Give 55.00 for that standard. But for every increase of of Mhz, give 25.00 per 100 increase.
View 2 Replies
View Related
Mar 14, 2014
I am having difficulty trying to find a walkthrough or any other information on how to pair a spinner box to a textbox. Preferably I would like it to show 12:00 and move in 15 minute increments and I seem to be hitting many roadblocks and errors.
View 1 Replies
View Related
Jan 24, 2010
I have a Piece of Code that copys a Row in my Spreadsheet and Pastes it underneath the original Row.
The Problem that I am having is that within the Row it Copys there is a Spinner in it. I want the Spinner to be copied also but the Cell that the Spinner is Linked to Says as the Original Cell, it doesnt move Down with the New Row Pasted in.
Here is the code that i have written to Copy the Row and Paste it down a Row.
View 5 Replies
View Related
Oct 23, 2008
I was hoping that my formula would give me the count number based on the Maximum time (latest time) and the Name field...My result is a 0 instead of 62 (the correct answer).
=SUM((Download!$H$2:$H$10=A4)*(Download!$D$2:$D$10=MAX(IF(Download!$H$2:$H$10=$A4,Download!$D$2:$D$1 0)))*Download!$I$2:$I$10)
Would a Index/Match/MAX function be more efficient?
View 4 Replies
View Related
Oct 9, 2008
Look in Column E and find the MAX value. Once you find the MAX value, (let's say E27) display the date that's in C27. I bet this is really easy but I've been screwing around with it for over a half hour and can't get the correct result.
View 2 Replies
View Related
May 15, 2009
I have two columns of data. The first column is the 'type' and the second column is the 'value'. I need to find the maximum 'value' for each individual 'type'
The 'types' are not necessarily next to each other and the data cannot be sorted to do so.
Example:
type value
A 15
B 6
A 21
C 7
B 13
I need to be able to say the MAX for 'A' is 21, the MAX for 'B' is 13 and the MAX for 'C' is 7.
View 2 Replies
View Related
Mar 4, 2014
Is there any way in VBA to refer to a control in its own event procedure without referring to it by name/hard-coding?
It might be clearer to explain by a dummy code example:
[Code] ......
I'm seeking what I would need to replace Line1 with.
View 11 Replies
View Related
Jan 9, 2008
Within the ComboBox properties, is there anyway to control after "enter" his hit, you move to the right instead of down (similar to the edit under Tools/Options)?
View 9 Replies
View Related
Jan 12, 2007
I have created a userform within VBA which has a TreeView Control and a Spreadsheet control on it.
I have populated the TreeView control with data and what I want to be able to do is to drag the nodes off the TreeView control to the spreadsheet control.
I can drag onto a normal worksheet but not onto the spreadsheet control (the no drop mouse pointer keeps showing).
View 4 Replies
View Related
Oct 4, 2007
How do I determine which control the user is currently modifying on a multipage form (either changing, enterying or exiting the specific control). when I use "userform1.activecontrol" i get "multipage1" as the control name but I need the actual control on the specific active multipage. (also the .TABINDEX is for the multipage regardless of the on-page control) I use a generic data-field change SUBroutine so need the control name (and the TABINDEX) to provide my SELECT CASE. (so every fieldname_CHANGE calls the same SUB [with no parameters])
View 3 Replies
View Related
Mar 12, 2003
Has anyone out their ever seen an Calendar type of control totally built in an Excel vba UserForm?
My problem that I’ve tried to resolve for some time is utilizing some type of pop-up calendar to eliminate format issues in my published Excel forms. I have tried a number of calendar controls but all have to be registered on the local machine and this cannot be guarantied for every machine.
If someone could direct me to a vba UserForm that has this built in that might do the trick. Or is their another way to deal with this?
View 9 Replies
View Related
Apr 10, 2014
Having an issue with copying down.
Workbook 1 has data vertical
Workbook 2 has data horizontal
I need the formula in Workbook 1 to pull from the respective date in workbook 2, or just a simple formula increasing the column by 1 for each row.My issue is that when i copy down, the column never increases, it stays on the same one.Example is attached.
View 5 Replies
View Related
Feb 10, 2009
if it is possible to increase one cell by 1 when the date was changed in another cell. I installed the code that was given to me and it worked perfectly, thanks agin JB and royuk, UNTIL the cell that was to increase by 1 was locked and the sheet protected.
The date cell is not locked.
View 10 Replies
View Related
Dec 14, 2009
I have attached a spreadsheet, in which I have highlighted the following cells (I2, J2, G31 and I31)
View 7 Replies
View Related
Sep 5, 2013
I have a sheet comprising of 4 columns, laid out like the below ;
A4 = Equipment
C4 = Cost
E4 = Revenue
G4 = Gross Profit
I require to enter a percentage into the gross profit column, and for this to interact with the cost column, then for the revenue column to return the total of the cost including the profit.
View 3 Replies
View Related
Dec 11, 2013
I'm dealing with the following problem. Say I have a set af values:
A B
1 567
2 546
3 567
4 554
5 572
6 543
I can easily determine the average of the values in column B (=AVERAGE(B1:B6)) But I also want to know if the average is increasing or decreasing without making a chart and trendline. Concrete: I want the cell with average (say B7) to turn green when the trendline has a positive growth and red when negative.
View 2 Replies
View Related
May 12, 2007
in getting the formula right for this:
I have a value which I want to increase with 1,5 % of last calculated value (the initial value is 40 in the example below).
0,01540
140,60
241,21
341,83
442,45
543,09
643,74
744,39
845,06
945,74
I only need 20 iterations.
View 9 Replies
View Related
Jun 20, 2009
I would like to add Cells(18,3) also along with the below code which should increase its existing value with 1.
Sub newinv()
Range("C20").ClearContents
R = Sheets("Sheet2").Range("B65536").End(xlUp).Value + 1
Cells(15, 4) = R
End Sub
Jane.
View 9 Replies
View Related
Jun 6, 2006
I need to increase the cell value on a spreadshhet that contains over 50,000 cells. I know how to do this on a cell by cell basis. I need to know if there is some way of doing this to multiple cells. Here is my example;
$603
$712
$649
I need to increase each cell value and roundup to the next number. I have been doing the following formula: =ROUNDUP(603/.97,0) to increase the cell value to $622.
View 9 Replies
View Related
Nov 1, 2006
I have two dates in A1 and B1. Eg 24/Oct/06 in A1 and 27/Oct/06 in B1.
Can the range of these two dates be updated to Cell A10, followed by the next row.
Eg,
Cell A10 24/Oct/06
Cell A11 25/Oct/06
Cell A12 26/Oct/06
Cell A13 27/Oct/06
Because the two dates in A1 and B1 are updated by user, the range is not fixed. Eg It could be 20/Oct/06 in A1 and 29/Oct/06 in B1.
View 9 Replies
View Related
Jan 15, 2007
to speeding up this little routine that deletes rows that have identical values in certain cells in the row above
Sub remo() ...
View 3 Replies
View Related
Jun 12, 2014
Is it possible to have a cell increased by 1 and another decreasing by 1 in a simple cell formula.
E.g.: I have an inventory stock sheet that is very simple. I have a maximum stock column C, a stock on hand (available) column A and a stock sold column B.
Every time I sell an item and punch it into column B it should automatically decrease the amount in column A by the number that I punch into B.
I am not concerned about the maximum stock column but would like an easy formula just to work out the amount that I have available so I know when to order more stock.
So when I punch in a 5 on B2 it should decrease the value of A2 to 1. And when I purchase stock again and I punch in say a 5 on A2 it should decrease B2 to a 1.
****A* B *C
1 *2 *4 *6
2 *4 *2 *6
3 *8 *6 *14
4 *0 *6 *6
View 3 Replies
View Related
Sep 18, 2006
Simplified:
I have a this years total in A1, last years total in B1, difference +/- in C1
$1000.00___$800.00___+$200.00___+%
$800.00___$1000.00___<$200.00>___<%>
I am trying to get a % of Increase/Decrease (Between A1 and B1) in D1.
Not as a dollar amount but as a %.
I have tried Percentile and PercentRank and some other stuff. No joy.
View 12 Replies
View Related
Feb 18, 2007
formula to put in microsoft excel 2003 to increase a number by 10%, so for example, 20 by 10%.
View 10 Replies
View Related
Jan 10, 2009
How can I get one cell to increase by 1 after I change the date in another cell. The spreadsheet is used to keep track of Oxygen Bottles at the local Fire Dept. and I want the " Times Filled" cell to increase by 1 after the " Date Filled" cell is changed. I'm not sure if they key the date in or if they use a calender add-in pop up.
View 5 Replies
View Related
Jan 22, 2009
I currently have an excel spreadsheet which has monhtly sales totals in it. We have some forumla that compare Year To Date figures with YTD Budgets and we also wish to compare Current Year To Date to Previous Year To Date. The problem I have now is that it currently means updating the range formula for Year to Date Budget and I will also be required to update the Previous Year To Date sales manually too.
Im looking for the spreadsheet to re-calculate theses figures based on the month that they are in. For instance should I be working on the Spreadsheet in January, it will only use the values in the budget sheet from Apr-DEC. Currently I woud be required to change the range in the formual to take into account the extra cell required.
View 5 Replies
View Related