when I link cells from one file to another and insert a new line on the file I am linking to. the file that is linking goes down as follows:
=Safety.xls!$A$5
=Safety.xls!$A$6
How do I get Cell A5, to link to Cell A5 even if I add a new line in the Safety.xls spreadsheet. Taking the $ away does not work I have tried that.
View 3 Replies
ADVERTISEMENT
Jan 23, 2009
I am trying to insert a link that once clicked will open a file (word, excel, powerpoint, etc. ) that has been saved on my computer.
View 3 Replies
View Related
Feb 23, 2013
I have the data to import / read in a pdf, in a doc, or in an Excel worksheet whichever is easier to use. I need to import the data, parse it into the correct cells for that row and then repeat the import until the end of the file. Not all the cells are in each group of data to import, so those cells will be null for that row. Some of the data for one cell may be in up to 14 lines in the data file. I have be concatenating these data rows into one cell. There are 48,000 lines in the file to import or I would do this manually. I am assuming that doing this in VBA would be the most efficient method.
View 11 Replies
View Related
Jun 12, 2007
Basically I want to point my Excel sheet to a bunch of external Excel files. To get data from an specific cell (in this case, cell F10) of the external file, all I have to do is this: ...
View 9 Replies
View Related
Aug 13, 2013
Got a slight problem; I am making a "worker-plan", where you should be able to write a name on one file and have it updated (removed) from the equivalent columns on another file automatically. Here's an example with two separate projects:
Project 1 before and after changes:
Attachment 257366
Attachment 257367
Project 2 before and after changes:
Attachment 257368
Attachment 257369
You can see here how I intended it to work. When one worker is moved from Project 1 to Project 2, that worker should also be removed from those weeks in Project 1. The previous worker from Project 2 should also be removed from those weeks (in Project 2).
Are there any formulas that can make this work automatically? All week numbers will belong to the same columns in all files.
Edit: There are 30 files that should be syncronized, not just two.. I could also gather all files into one file with sheets, instead of having seperate files.
View 2 Replies
View Related
Mar 17, 2009
I am putting together a price list in excel and using images and hyperlinks to jazz it up a bit - what I am finding is that if I insert a 25KB GIF image, the excel file grows in size by over 100KB
why is this disproportionate growth happening and is there a way around it - I dont want my Price List growing too large but need the images....?
View 9 Replies
View Related
Aug 1, 2014
I have a file that gives some statistical data to my co-workers every 15 minutes. A common question I get is "How does that compare to last week?" Then I have to open the file from 7 days ago, find the data from the same time interval, and subtract it from this week's number in my head. I'd like to have excel do this for me.
I know how to get data from an external file. The problem is, these files are named with a date on the end of the file name. So tomorrow, the static formula won't work anymore (or rather, it will give data for a file from 8 days ago, instead of 7). I'd like to excel to use today's date, find the file from 7 days ago, and get the data from that file to compare to the current file.
Here's what I've done so far:
Code:
ThisDate = Range("C1").Value 'the cell with todays date in it
ThisDateName = Format$(ThisDate, "yyyy-mm-dd") 'now formatted the way I need it
ThisDate7 = Range("G1").Value 'the cell with the date 7 days ago
ThisDateName7 = Format$(ThisDate, "yyyy-mm-dd") 'formatted correctly
ThisDate14 = Range("G2").Value 'the cell with the date 14 days ago
ThisDateName14 = Format$(ThisDate, "yyyy-mm-dd") 'you know, in case of a holiday 7 days ago
I have no clue what to do next. I want Excel to: Use "ThisDateName7" to find the file with the name "pph_tracker_[ThisDateName7].xlsm"Get data from a cell in that file (say, C15)Subtract it from the data in the same cell (C15) in today's file (this week - last week)Give me the result in today's file (say in cell C20)Do that again for cells D15, E15, and so on (result in D20, E20, etc)
I assume I can figure out the rest from there. Can I use the variable names in an actual formula in cell C20? Something like:
=C15 - '[pph_tracker_{ThisDateName7}.xlsm]Sheet1'!C15
or even
=C15 - '[pph_tracker_{The Date in Cell $G$1}.xlsm]Sheet1'!C15
which would require no macros at all!
View 3 Replies
View Related
Dec 20, 2009
How to save a file, with file- name. but the directory is to be read in worksheet "towns" in Cell1 (brussels) and filename in worksheet "names" in cell B2 (i.e. winter), so it saves to c:russelswinter.txt as a wordpad or kladblok txt file, that keeps a number, so each time we push a button "go back from worksheet names to worksheet towns" the "number" that is saved in the txt document goes up by value +1. In Flemisch, the "old" code goes as follows, and saves the number in the txt file Factuurnummer7.txt. But I want that the file name (here: FactuurNummer7) can be a variable text issue, which has to be read - as already noticed - in cell B2 (with the word WINTER). So the are 2 worksheets: towns, ans names
pad$ = Application.DefaultFilePath
'controle = Dir(pad$ + "FactuurNummer7.txt")
'If controle = "" Then GoTo EerstAanmaken
'Open pad$ + "Factuurnummer7.txt" For Input As #10
'Input #10, Nummer1
'Close #10......................
View 2 Replies
View Related
Aug 3, 2006
I have certain excel file that i want to be able to write a macro in order for it to extract certain information from certain cells on different sheet. In other words, i want cell A2 from each of the three different worksheet i have under different files. And have those data automatically update a master excel or access file whichever might be easier.
View 4 Replies
View Related
May 16, 2013
My raw data is exported in CSV format. Is it possible for Excel to link to the data or can it only link to an Excel format workbook?
View 1 Replies
View Related
Jul 25, 2008
linking a CommandButton to another File. I made a CommandButton but would now like to know how to write the Macro to make that Button, when clicked, bring me to a file saved in Excel.
View 9 Replies
View Related
Jan 29, 2009
I have some code that looks at the part # in column D and then goes out to the D drive to drawings (.pdf files) and creates a hyperlink.
The problem is that it is only creating a link to the .pdf file and not to folders. I need a hyperlink to the folder so when it is clicked the open folder pops up and shows the multiple files associated with that part.
Link should be the same regardless of file or folder, no? As long as the name matches link should be made, correct?
E.g.
123-100.pdf (column D part #) links to 123-100.pdf file on CD
456-200 (folder name in column D) no link created to folder named 456-200 on CD.
Sub Hyper()
MyPath = "D:"
StartRow = 2
EndRow = 20
x = 0
For i = StartRow To EndRow
Cells(i, 4).Select
MyFileName = ""
MyFileName = Dir(MyPath & Cells(i, 4).Text, vbNormal)
If MyFileName "" Then
x = x + 1
Cells(i, 4).Select
ActiveSheet.Hyperlinks.Add Anchor:=Selection, Address:="D:" & MyFileName
End If
Next i
End Sub
View 9 Replies
View Related
Feb 26, 2007
What is the script in order for me to link a MS Word file to excel. What I intend to do is to customise the commandbutton, so that once a user click on it, the linked MS Word file (stored in the local drive) will pop-up and he/she can do the necessary amendments to the file?
View 3 Replies
View Related
May 18, 2007
I have a 'master' worksheet, which contains a list of active workbooks. Each row on the master contains several data elements from each of the active workbooks:
File#, Date, Status, Customer, Etc.
This is accomplished by copying a row of data in the active workbook and pasting as a link on the master. When an active workbook data element is changed (date, or status, for example), the link on the master changes as well. Then the active workbook is closed until needed again. The linked data on the master allows for an overview of active files, and for sorting based on certain criteria, such as the next date to action the file.
What I now wish to do is eliminate the process of copying & pasting; this would be done, in theory, by putting a formula in each cell of the master that references a variable: the file number, located in column A.
Thus, where the pasted link formula reads:
='C:Active Files[4545.xls]Home'!$O$1
The desired theoretical formula would read:
='"'C:Active Files["&$A25&".xls]Home'!$O$1"
View 3 Replies
View Related
Dec 21, 2012
Basically, at month end, my company will create a new folder with the name as YYYY_MM (e.g. 2012_11). In this folder, a new file will be created as: earnings_YYYY_MM (e.g. earnings_2012_11).
What I want is to automatically update the link to the most recent file: earnings_YYYY_MM, whenever it is available. For example, next month there will be a new file earnings_2012_12 created in the new folder 2012_12, then the new file will be linked with.
View 1 Replies
View Related
Feb 22, 2013
I have a "cost.csv" file that contains the cost of the toys. The cost is show in $ with two decimal places i.e. $0.75
I created a new MS Excel 2010 workbook file named as "customers.xlsx" that has four columns i.e. Item, Cost, Order, [Total Amount] columns. I used the paste link command and the Cost column data is linked with the cost column in "cost.csv" file.
When I write order quantity in the order column and then try to use the following expression in [Total Amount] column i.e. "Cost * Order" then I received error due to following reason i.e. "Cost is a text value and Order is a numeric value and excel is unable to evaluate the expression." I have done it by first remove the $ sign from cost using RIGHT and LEN FUNCTIONS.
Now I want to change the format of "Cost" column i.e. I want to show the cost in Euro but not in $. Here I am stuck as I am trying to change the format of the Cost linked cell but unable to change it either I applied the new format, the text remains shown $0.75?
Is this the problem as data is coming from .csv file? If it is then how I can accomplish the task?
View 2 Replies
View Related
Jul 14, 2007
I'm sure this is an easy one but it's unfortunately beyond me. I have a update links formula in which I would like for it to update with the name of the file being in a cell. Example:
The file name is Week20.xls
Cell A1 has the value of Week20.xls using a formula (="Week" & A2 & ".xls")
Currently I have it by looking at the actual file location like this: ='C:Documents and SettingsMy DocumentsWeekly Sales6 Sales Comparisons[Week20.xls]Daily Comparisons'!$I$4
But rather then pointing directly to the file path I want it to update by the name of the file in A1. So I'm sure its something as simple as replacing [Week20.xls] with some formula but I don't know what that one is.
View 3 Replies
View Related
Oct 10, 2011
VBA coding for automatically saving an excel file as another file using the current date as part of the file name together with "32ga" as a constant add-in. I also what this macro to run at a particular time of the day let say 00:20hrs. The excel file i want to save as is always open . It has data that changes every 24-hrs.
View 1 Replies
View Related
Jun 27, 2013
I have attached 2 files to explain what I really need:
In file A.xlsx I have 2 sheets. In the B1 cell from Sheet 1 I have created a data validation criteria based on the sheet 2.
I would like to get that same data validation criteria based on the A.xlsx onto the B.xlsx.
Is it possible? If not do you have any trick, solution, workaround to link a list from one excel file to another?
View 4 Replies
View Related
Oct 26, 2009
We're using SUMIF and it won't work unless the external excel file is open.
This is the formula we're using:
View 7 Replies
View Related
Jan 9, 2012
I have a restaurant and every evening the manager emails me a sales report. The names of these files are all based on the day's date so I know what the file name will be in advance (e.g. today is 20120109.xls and yesterday was 20120108.xls)
I have a master spreadsheet collating the monthly sales data. It links to the daily spreadsheets with links like this:
=IF(ISERROR(VLOOKUP($A5,'C:UsersSimonDocumentsPersonalTOSEADaily Sales[20120105.xlsx]Sheet1'!$B$6:$F$50,3,FALSE)),0,VLOOKUP($A5,'C:UsersSimonDocumentsPersonalTOSEADaily Sales[20120105.xlsx]Sheet1'!$B$6:$F$50,3,FALSE))
Each day I create a new column and drag the previous column's formulas over. I then do a find and replace to change the file name (20120105.xlsx in the example above) to the current day.
What I want to be able to do is change the filename reference in the formula above to a cell within the master spreadsheet that contains the date, so that when I drag over a new column it picks up the date from that cell and automatically uses it to create the filename in the link. The path for the file name remains the same.
View 3 Replies
View Related
May 19, 2014
I have a template excel file that has links to data in another excel file in the same directory as the template. However, I save the template with a new name in a new folder and the link no longer works. The link changes to the location with the new file and of course the file I am trying to like to is not in that location.
The link shows the full path in the template file so I would think it would keep the full path when saving to a new location but the file doesn't.
How do I make the link address static?
View 6 Replies
View Related
May 31, 2006
I'm using Excel 2002.
I have one workbook with data linked to another CSV file (It's about 40000rows). When I open the workbook, "THis workbook contains one or more links that cannot be updated." message appears and asks me to open csv file if I wanna to update (although I set full path for links in cells). I wonder if there's any way to update link without opening csv file? Or Excel can not update link without openning the resource file?
View 3 Replies
View Related
Nov 16, 2006
I have a file where the links to external spreadsheets need to be updated on a monthly basis. There are a couple of hundred cells containing links along the lines of: =IF(WEEKDAY(F2)=1,E11,IF(WEEKDAY(F2)=7,E11,'J:DAILYDaily ReportUKSeptember 2006[daily_file_AsAt_01Sep2006.xls] Stock - Consolidated'!$G$5))
and
=IF(WEEKDAY(F2)=1,E10,IF(WEEKDAY(F2)=7,E10,'J:DailySeptember 2006[Cash Flows -Sep06.xls]1st'!$I$40*-1))
As you can see the month is shown in 3 ways...
September 2006
01Sep2006.xls and
Sep06.xls
I want to be able to enter a month and year and have all the links update...i.e if I type in October 2007 I want the links to change to:...............
View 4 Replies
View Related
Jan 22, 2008
I have a problem that may be a little bit diff. from must of the Readonly post that I have found here. Most people would like to have all of there files opened as readonly files, but I don't in this case. I am copying a number of files that has VBA code in just about all of them. I am using a CD writer to copy the files to a CD using Windows Explorer and that is working just great, No problem copying the files.
My problems comes in when I copy the files from the CD to another computer, all of the files are Readonly files on the new PC. I have not saved them as readonly and don't want them to be readonly files. Does anyone have any ideas why this is happening what I need to check or change to get the files to another computer without being a readonly file.
View 2 Replies
View Related
Jun 21, 2009
I've download the CSV files from my bank. Somehow I thought they'd import painlessly. I dunno what's happened, these files are bloody ridiculous to look at.
Somehow I've ended up w/ Date, then Amount in the cell under it, then a description of what I bought in the cell below, and then something to the cell to the right of it (a further description sometimes, at other times nothing).
I have about 1500 lines of this so doing this automatically is not in question. I want to figure out how to run a macro to organize this. The logic is fairly simple. Where-ever the cursor is, copy the stuff in there over 2 lines, go back to original starting point, copy next cell, paste it next to where i previous pasted, goto third line, copy, paste next to second place i pasted, and then goto next set of data/dates. So I did that once figuring it could keep repeating the cycle. NOOOO that didnt happen. I did this for one set and then just stopped. Everytime I run the macro it deals w/ the same data. For example I created the macro to start of w/ cells A2, A3, and A4, then goto A6 and stop. I figured once there I could run the macro again, and it would do the same stuff for A4, A5, and A6 that it did for the previous one. Nope, it went back to A1-3.
Of course if someone can give a better idea of how to work w/ CSV in the first place that would also help. It just never made the colums in the right place. I got to choose the variables that would decide when a new column starts but I was never really getting the result I wanted. If this macro works though I wont need to work w/ that anymore.
Here's a sample though of how my CSV looks at the moment. These are three entries. The first one's description takes up one cell, the next 2 have 2 cells each.
D06/13/2008
T-20.00
MABM WITHDRAWAL
^
D06/16/2008
T-26.25
MMISCELLANEOUS PAYMENTS Good Life
^
D06/16/2008
T-25.00
MPOS MERCHANDISE AMC MISSISSAUGA
View 6 Replies
View Related
Aug 26, 2006
how to write a new line to a csv file? Or how to write a "Character return" to the file? I use the following code to write a line but I don't know the command to start a new line. Write #1, "abc",
View 2 Replies
View Related
Jun 26, 2014
There is a problem in joining one cell to the other file
The below is screen shot when l click the on every cell the image must be open
How can do it?
Capture.PNG
View 1 Replies
View Related
Nov 16, 2006
This link worked perfect for my needs: Create a List of Hyperlinked Files:
But is there any easy way to only show the filename insted of the full path for the name of the hyperlink? Now it shows it like :C:MyDocumentsTestings est1.xls
I only want it to show as: test1. I still want the hyperlink to work
View 2 Replies
View Related
Feb 1, 2008
I want to be able to get a value from a specific cell in another workbook, the problem i have is that i want to be able to select what file the active workbook looks for from the start page of my current workbook. For example when i load the workbook i get my startup page ( sheet 1) where i will be able to select what external workbook the active workbook will be linking with, i will then link the active workbook to the value in a specific cell from the selected external workbook.
I know to link to another workbook i would use ='[filename]sheet!cell
However i want to be able pull up a 'open file dialog box' which i select a file name which will be used as 'filename' in the formula above.
View 2 Replies
View Related