Formula Which Indicate Or Pop Up Timeline
Feb 18, 2008
I have sheet in which cell A1 contain value in alphanumeric format like D815327985.
Cell B1 contain time as 21:00hrs and cell C1 as 21:03 hrs.
cell C1 has formula B1+30/1440 which give me time 21:30.
I am looking for macro or formula which would pop up or give red colour when cell C1 reach at 21:20 hrs.
To make it easy, i would like to explain my problem in a simple way because from longtime i am not getting any satisfactory reply from message board.
I have 1 ticket number that is D815327985 in Cell A1.
Once i received this ticket i enter the current time in Cell B1. (I have taken time here 21:00 hrs for more convieniance).
Cell C1 formula give me the timeline that is within how much time i have to give follow up on this ticket.
I want formula or macro for C1 cell which would pop up or gives red colour when its reach to 20 min time of B1 cell.
Find the data which entered in my sheet
A1 D815327985 B1 21:00 C1 21:30 (here is formula B1+30/1440) (And i want here is this cell would get red colour or pop up when its reach to time 21:20 hrs)
View 9 Replies
ADVERTISEMENT
Aug 22, 2009
What would be the VBA code to put a border line on a row that that would separate the data that is due before today, from the data that is due after today?
This is a big data set, I have a loop that will do it, but it takes forever. Is there some way to do it faster with a filter, or conditional formatting, within VBA?
Example today is 8/22/09.
Would need a border line that would look like this...
View 9 Replies
View Related
Jul 2, 2014
How can I get EXCEL to display recurring events on one line? In the example below, I want all events of type PLAN to be on the same line.
Phase
Time
Duration
End
[Code].....
View 1 Replies
View Related
Jun 8, 2009
I have numerous sheets i am working with as schedules , would it be possible to create a timeline that would show you where you currently are (time of day ) just a simple line or similar that stands out , my times in Row 4 are split into 6 hour intervals (06:00,12:00,18:00,00:00) with the date above in Row 3
View 9 Replies
View Related
Jul 17, 2007
how I can format this timeline better (it was a to,e;ome template created by someone smart on this forum) - so that there isn't a huge gap between 1892 and then 1977... and then so the rest of the data isn't scrunched together.
View 4 Replies
View Related
Nov 23, 2011
I have a spreadsheet where users can enter a time using the 24 hour clock - these times are random and can be anything within the 24 hour period.
I want to create a chart or graph that has a timeline of 24 hours, (in multiples of 1 hour starting at 07:00 and going right through to 06:00), and I need the times entered by the users to appear on the chart to give an overview of when these incidents are happening most.
I was thinking that the cluster or scatter chart might work but I can't figure it out. I don't actually need both X and Y Axis, just a timeline - is it possible?
View 3 Replies
View Related
Jul 1, 2008
I tried so long I finally gave up and drew this by hand in MS Word:
But I wonder if you guys could help me chart this automatical in Excel.
I want to chart the time period a ship (Vela, Serpentine, Rainbow etc) are contracted. I want a specific color for the firm contract, and another for the remaining optional contract. If a ship is under construction I also want a bar showing when it's done.
Each ship has a rate. I want this written on the bar. In "Vela's" case there are to rates for the same contract: The first 740 days the rate is 24,5 the rest of the period it is 29. I also would like to be able plot an additional contract for the same ship for example after "Syrena" is done in yr 2009.
View 9 Replies
View Related
Oct 26, 2012
I am creating a spreadsheet that will display the subject mentioned. I need a chart that displays project deliverables as labels along a year long date range. I want to be able to change the date range to any period of time by entering a start date and an end date and having the chart automatically update to that date range and display the project deliverables due during that range. I have used the following links and have been able to accomplish each of them individually, but have not been able to combine the labels of the project timeline link with the dynamic date range described in the second link.
[URL] .......
[URL] ......
How to achieve the spreadsheet I described using the two ideas presented in the link?
View 1 Replies
View Related
Sep 11, 2006
I need a shape to adjust its size depending on the start date and end date. So it looks like a graph/timeline. This way i can see who is still working to current date, and what number cantract they are on.
I've tried to do it using an x-y Scatter graph, but couldn't do it. As i'm not sure how to lay out the data
I've attached a non coded spreadsheet to illustrate what i mean, as reading back on this it sounds confusing.
View 9 Replies
View Related
Jan 1, 2014
I'm trying to get Excel 2010 to automatically generate a custom timeline in a separate tab using data I enter in a different tab. In the attached example, the data in the first tab ("daily log") tracks the number of trucks parked at a certain yard by the state they are registered in, their company, and their ID number. I would like Excel to automatically generate the timeline I've created by hand in the second tab ("Timeline (desired outcome)"). I need a formula that returns a "1" if several conditions are met (see comments in example) and a " " if those conditions are not met. I played around with IF(AND...) functions, but I've never used them before and couldn't make them work. There are a few complicating factors: there aren't a consistent number of trucks at the yard per day, and some trucks changed their ID numbers during the data period. I use a blank row, highlighted in dark grey, to visually differentiate days. This row can be filtered out with the "null" column.
View 4 Replies
View Related
Mar 19, 2012
I'm attempting to chart data obtained from our phone system to see when users are logged in/on rest.
I'm using Excel 2007.
The data we extract has:
person | status | start | finish | duration
Status is either "login" or "rest"
Start/finish is time (h:mm)
Duration is a formula (h:mm, finish - start)
I want to have a stacked bar chart that shows when a person was logged in/on rest; one bar for each person.
x-axis: person
y-axis: time (8am - 6pm)
legend: status
The problem I'm encountering is that each person logs in and out multiple times throughout the day (therefore, has multiple lines to their name in the data), and I can't get this information to appear on a single bar for each person.
I've sorted the data into a pivot table which gives me the information I want, but how to get the chart.
Row labels
a. Person
b. status
c. start
Values
Min of duration
Ideally, I would like to avoid using a Gantt chart within cells (as it would involve vlookup/if statements), but am beginning to think that's my only option...
View 3 Replies
View Related
Jun 11, 2014
how can I change a bar graph horizontal time line from ascending to descending?
View 1 Replies
View Related
Jun 19, 2014
I have been trying to formulate a condition to fill up my timeline by checking the start and end times and date of jobs.
In my attached worksheet, I have an example (which was done manually) what I would expect the timeline to look.
[URL]...
For example,
SLIS900H has a start of 6/8/2014 11:54:05 AM and end of 6/8/2014 12:03:15 PM
As such, the TimeLine entries 06/08/14 11:00 and 06/08/14 12:00 would be shaded (or at least have some indication that it is to be shaded). After which, the Main Task from which SLIS900H belongs to (TSOH Extraction), would also have its Timeline shaded.
View 5 Replies
View Related
Jun 23, 2014
Rather than manually typing the time in 5 min increments across a range of cells, i want to have a start time, then the next cell add 5 mins. EG: 09:00 next cell 09:05 and so on.
View 7 Replies
View Related
Apr 30, 2014
How to use conditional formatting in Excel 2007 (). I'm creating a spreadsheet to track my group's timeline for completing strategy meetings with our customers. When we have a meeting, I will enter the date of that meeting in a specific cell. In a successive column(s), I'd like for a cell(s) to turn a specific color based on the length of time from the last meeting (or if there is no date for a meeting entered - i.e. no initial meeting has been set).
View 9 Replies
View Related
Dec 23, 2013
I just got into the world of PowerPivot, Excel 2013 and Pivot Tables and am in the process of creating a Dashboard which I will then be uploading to SharePoint 2013.
On top of page I added the new timeline filter which I've linked to my pivot charts. Now what I would like to do, is create an additional pivot chart which looks at whatever date range has been used in the timeline filter and subtract 5 years from that. So, when I select a date range of November 2013 - December 2013 in timeline filter, the additional pivot chart will show the details for November 2008 - December 2013. This is where I get stuck.
I'm using two SSAS cubes which I'm combining together in PowerPivot and then display in Pivot Tables and Pivot Charts.
View 1 Replies
View Related
Oct 7, 2009
I was wondering if there is a formla that will delete a formula when it has done its calculation, or stop the formula from constantly updating.
I've got a formula
=IF(COUNTA(A1)=1,TODAY(),"")
When something is typed in Cell A1 the cell with the formula will input todays date.
Is there a formula that will stop this formula from updating, as when you go into the file on a different day the date would have been updated.
View 6 Replies
View Related
Jul 30, 2014
I have a situation where I have to curve fit data, this can lead to different formulas being used with varying constants.
Is it possible to pickup a TEXT based formula and related constants from other cells, and then place this into another cell as a functioning formula. For Example
Cell A1 contains the formula as a text string whether it be y=a+bx+cx^2, or y=a+b/x, etc
Cells A2:A6 contain the individual constants, a, b, c, etc
I would then want the VBA to read the text based formula and put it into an output cell as a functioning excel formulae.g
In cell B10: =a+b*A10+c*A10^2
I understand picking the constants up and putting the formula should not be too much of an issue, however trying to insert the variable form of the curve fit is the part that I am struggling with, and am unsure if possible.
View 2 Replies
View Related
Dec 22, 2009
Here is the scenario:
A B C D
BananasApplesOrangesTotal113=A1+B1+C1
I need to reference the formula in D1 with the cells headers names.
In a perfect world, it would take
=A1+B1+C1:
and produce:
=Bananas+Apples+Oranges
View 9 Replies
View Related
Mar 27, 2014
I have an existing formula in a cell linking back to a start date only. determining how to add an additional formula to exclude weekends, and possibly holidays.
View 2 Replies
View Related
Aug 24, 2014
I am trying to use a combination of Concatenate and IF formula to produce an email.
My input.
D4: First Name:
D5: Middle Name:
D6: Last Name:
D8: Organization:
Once all these are filled, I want the formula to produce a result like
FirstName.M.LastName@Organization.com
I have used the following formula.
[Code] .....
Problem is if there is a middle name the formula works fine, but in case where there is no middle name, it produces the following result.
FirstName..LastName@Organization.com
How do I remove the additional (.) in cases where there is no middle name.
Attached File : Email Generator.xlsx
View 3 Replies
View Related
Apr 23, 2009
I'm having some trouble trying to get excel to input a formula into a cell. I'm still a novice at VBA right now, so I don't think my problem will be too much of a brain buster.
I want a formula in Cell A6 (and I already know it correctly works) in this format: =E6&VLOOKUP(I6,'FA-Fund Data'!B$1:C$2000,2,FALSE)&J6
View 3 Replies
View Related
Jul 22, 2014
Is it possible to write a formula that skips x number of cells and have the formula autoincrement as usual. For an examples lets say I want to skip 3 cells and I have entered in the cells listed:
A1= "1"
A2= "2"
A3= "3"
Then I type in the simple formula in the cell
B1= "=A1"
and then drag down but it skips 3 cells so then
B5= "=A2"
B9= "=A3"
If it didn't skip then
B1= "=A1"
B2= "=A2"
B3= "=A3"
this is just an example as I will be writing more complex formulas and need some thing that I can write into the formula so that it skips.
Something similar to this B1 "=A1(skip3cells)"
View 4 Replies
View Related
Jul 16, 2007
I would like to copy a formula in a cell and then paste only the text of the formula, but I can't figure it out. Basically, I would like to avoid going into the cells and absolute referencing or hitting F2, then copying the text.
When I hit "Ctrl C" to copy the cell, then hit "Alt/E/S/F/Enter" to paste the formula, it is just like a regular copy/paste formula-wise in that the references move.
View 10 Replies
View Related
Apr 9, 2009
I have some student marks in columns B to F. If some one get below 40 marks he fails and the subject in which he has been failed will come in Remarks column. If he has passed in all subjects remarks column will show Pass.
To bring failed subject initial in Remarks i have to create 5 additional column and then thru Concatenate i joined them.
Is There any formula to show fail subject in Remarks column without creating 5 additional columns?
View 14 Replies
View Related
Aug 12, 2007
This task joins a string together based on a number of characters per cell in the range.
I want to isolate one range, Col N, and add an IF condition to it.
There may be other issues preventing this from happening, e.g. the number of IF that exist in the complete formula. I will isolate the current cell and its requirements and then post the entire formula at the end for reference....
View 9 Replies
View Related
Jan 31, 2008
I am looking to average a range of cells which won't always be the same size. How do I create a formula array that will omit empty cells in my formula.
View 9 Replies
View Related
Jun 1, 2006
I recently added a formula to a spreadsheet with som complicated formula. It worked ok and I saved the sheet. Now it takes 5 minutes to open the sheet and when I try to do anything,like delete the inserted column the program locks up giving a no responding message. I can do without this column if I have to.
View 4 Replies
View Related
Feb 23, 2008
I am using vlookup to get a cell value from another sheet, but if the cell has "&" or "/" I need to substitue "&" and "/" with "and" so that the cell can be added later to a url.
i am using =VLOOKUP(a1,Sheet2!A1:W17968,6) to get the value of a1 in sheet 2 and return the value of column 6
this will return "Audio Cables & Leads" but i need it to say Audio Cables and Leads
I need the formula to also check and replace "/" with "and" as well so cables/wire will be Cables and wire
View 9 Replies
View Related
Dec 19, 2012
I have a spreadsheet that contains a list of dates: What I need is a formula that will count the number of cells that hava a date more than 6 months old. I also would like the field automated so I don't have to change the date manually every day.
=COUNTIF(S5:S593,"<2012/06/18") This formula will give the correct read out, but I must change the date manually.
My attempts at adding a =today() command in place of the date result in 0 being the result (not correct)
This is what I have tried: =COUNTIF(S5:S593,"<"=TODAY()-"183")
View 8 Replies
View Related