Timeline Adding Specific Time Frame In Each Additional Cell?

Jun 23, 2014

Rather than manually typing the time in 5 min increments across a range of cells, i want to have a start time, then the next cell add 5 mins. EG: 09:00 next cell 09:05 and so on.

View 7 Replies


ADVERTISEMENT

Summarizing Times For Specific Items Within Specific Time-frame

Mar 26, 2014

I got Excel for Mac 2011 installed. I have a table called 'Raw" that holds data from the beginning until the end of 2013 (in total ~7000 rows). I have columns for Category, Start and End time, and time period in Hours, Minutes, and Seconds:

Code:
A
B
C
D
E
F

Category
Start
End
Hours
Minutes
Seconds

Transportation
2013/01/01 01:00:00
2013/01/01 01:15:00
0:15:00
15:00
900

[Code] ...........

I'm trying to get an overview of how much time I've spent in January on Transportation. I would need to look at the Category entries for Transportation, then only use the ones which have the Start set to 2013/01, and then take the Hours/Minutes/Seconds, and summarise it in a new table called 'Data':

Code:
A
B
C
D
E
F

Month
Category
Occurrence
Hours
Minutes
Seconds

2013/01
Transportation
48

[Code] .......

I have figured out a way to count the occurrences for Transportation for January:

=COUNTIFS(Raw!B:B,">="&"2013/01/01 00:00:00"+0,Raw!B:B,"

View 1 Replies View Related

Pull A Specific Time Frame Of Data From Worksheet?

Jan 17, 2014

I am trying to pull a specific time frame of data from worksheet, in a large file, into another active workbook. A fiscal month. I don't know how to at all. I figure it should be a And IF and Vlookup but do not know how to execute it all.

View 1 Replies View Related

Excel 2010 :: Calendar - Set Up Specific Time Frame And Due Date To Exclude Weekends And Holidays

Apr 9, 2014

I'm using excel 2010 on a pc. I need to create a calender. So far I have been using the tutorial for the pop up calender. The result I'm looking for is to set up a specific time frame and have the calender provide the "due" date. I would like the due date to exclude weekends and holidays. Would I be able to do this with the pop up calender?

View 3 Replies View Related

Different Country Time: Reflect The India Time After Pressing A Specific Key In A Specific Cell

Mar 3, 2007

I am working on a system where the system is having "australia time". Now, I want a worksheet where it should reflect the India Time after pressing a specific key in a specific cell.

View 3 Replies View Related

Adding Additional IF Condition?

Mar 28, 2014

I have a code that searches in a column for a certain value, if it finds it, it copies this value to a range adjacent to it.

[Code] ..........

However, if the cell where the code is supposed to find a new value is blank it makes the range blank. But in that case, I wan't it to leave the range cells with their original value.

View 11 Replies View Related

Adding Checkbox Without Additional Text?

Apr 1, 2013

I'm working on a spreadsheet that needs a lot of check-boxes and every time I add one I get the text "Check box" right next to it. I can't seem to get rid of it.

Format control - Alt Text didn't work.

View 2 Replies View Related

Adding Additional Conditions To IF Statement

Dec 29, 2011

I need to add a condition to a statement that adds a "If TRUE" reference to another cell.

The other cell can be either a TEXT value "RM1" OR "TE2". If neither condition is true than the value is blank or zero.

So right now I have in the destination cell =IF(AB7="CONT",V7,"") That works lovely, but really isn't countable unless cell "Z7" ALSO has Either "RM1" OR "TE2".

If cell "Z7" has the text "DEA" or "SP" then the value of "V7" will be placed in a different column. I will use a different destination column (for this modified "DEA" or "SP" condition)

View 7 Replies View Related

Adding Additional Characters For Substitution

Sep 20, 2008

i have a macro that copies info from cell in row A and uses that info to name the whole row, now if the name has a space between the words it uses _ (underscore) substition so i don't get an error (when row name is defined - you can't use any special characters or spaces) i was wondering if anyone can help me to add "-" besides the space

here is the macro
Sub Macro1()
Dim a As Long
For a = 1 To Cells(Rows.Count, 1).End(xlUp).Row
Cells(a, 100) = Application.WorksheetFunction.Substitute(Cells(a, 1), " ", "_")
ActiveWorkbook.Names.Add Name:=Cells(a, 100), RefersToR1C1:="=Sheet1!R" & a
Next a
End Sub

View 9 Replies View Related

Date And Time Values To Be Represented On Timeline Automatically

Jun 19, 2014

I have been trying to formulate a condition to fill up my timeline by checking the start and end times and date of jobs.

In my attached worksheet, I have an example (which was done manually) what I would expect the timeline to look.

[URL]...

For example,

SLIS900H has a start of 6/8/2014 11:54:05 AM and end of 6/8/2014 12:03:15 PM

As such, the TimeLine entries 06/08/14 11:00 and 06/08/14 12:00 would be shaded (or at least have some indication that it is to be shaded). After which, the Main Task from which SLIS900H belongs to (TSOH Extraction), would also have its Timeline shaded.

View 5 Replies View Related

Finding Matches And Adding Additional Data

Mar 17, 2014

Sheet 2 in the attached sample workbook (without all the pre-existing formula's from the original) contains data that I paste in (Cols A to D).

Sheet 1 then searches that data (minus Col D) from Sheet 2 and returns "Yes" to Col I if matching data is found.

What I would like to do now is if Sheet 1 returns "Yes" then the corresponding value from Sheet 2 would be returned to Sheet 1 Col J.

So in this example the value "5" would be returned to Sheet 1 Cell J1

I already have all the formulas in place to find the matches and return "Yes", this is just to return the additional information from Col D Sheet 2 to Sheet 1 Col J..

View 3 Replies View Related

Adding Some Additional Code To Prevent Someone From Saving Workbook?

Aug 14, 2014

Adding some additional code to prevent someone from saving the workbook under a different name. Currently if someone tried to enter data after the allotted time period, it would allow them to in any "unlocked" cells. When exiting or trying to save the file with this new data, they will get a message stating something to the effect that this is a read only file would you like to save as another name, which would allow the user to circumvent what I'm trying to accomplish. The end result would be they'd need a new spreadsheet.

[Code].....

View 2 Replies View Related

Subtracting Time If A Certain Time Frame

Mar 12, 2009

I need 15 minutes removed from a difference in time, if the time span falls over 9:00 am through 9:15 am.

I'm inputting time like 8:30:00 in A1 and 10:30:00 in A2, then calculating the difference in A3 (2:00:00). Is there a way to remove 15 minutes from that 2:00:00, since it falls over 9 to 9:15?

View 11 Replies View Related

Extract Numbers From String (multiple Cells) And SUM Without Adding Additional Column

Apr 10, 2013

i have data stored like:

col1

XXXX1244 50
XXXX1519 60
XXXX1244 50
xxxxx1111 10
xxxxx1519 65

the last 4 caracters are numbers. I need to test these numbers and sum the corresponding values them in a single cell without adding new column(SUMIF like).

so in the above example I need to sum all ending at 1244 or 1519, therefore the sum showed in the single cell equals 225

to extract from a single cell: =VALUE(RIGHT(D8;4))

I tried to use an array formula but it seems to crash if a blank cell is in the array

View 5 Replies View Related

Time / Frame Fps Formula (base 75)

Jan 18, 2010

I have a formula that calculates only seconds and frames. The frame rate is 75 fps (0-74).

e.g., 49.50 is 49 seconds 50 frames. It will not parse Minutes.Seconds.Frames, e.g., 1.49.50 is 1 minute 49 seconds 50 frames.

What my existing formula does is converts the number to all frames then converts the answer back to seconds and frames.

I need this formula to include minutes in its calculation.

A copy of the spreadsheet is here: ...

View 14 Replies View Related

Create Repeated Time Frame

Jun 25, 2013

How to create repeated time frame within a column like example stated as below:

Time 9:45AM

10:00AM

10:15AM

9:45 AM

10:00AM

10:15AM

9:45 AM

10:00AM

10:15AM

View 1 Replies View Related

Adding Additional Goals And Objectives In Treatment Plan Using Form Control Button

Feb 25, 2014

Instead of having the goals and objectives already in the form I would like to have buttons that would allow my clinicians to add as many goals and objectives as they'd like to the attached treatment plan. I'd like them to be able to click a delete button as well when they review the plan and need to delete a goal that's been met. When my team clicks into the second worksheet they would see rows 10-16 (below). They would then type a STG 1 and an Obj A. They then would click the Add Obj button and add as many objectives that they needed. Then when they clicked the add goal button a blank copy of rows 10-16 (including the Add Obj button) would pasted one row down and would update to read STG 2. Neither of these buttons would appear when the document printed.

Here is a screen scrape of what I'd like the attached form to look like before goals and objectives are added.

add goal.jpg

The original form is saved in an .xltm format but I saved it in an .xlsm format so I could upload it here.

HCT ITP (2-25-14) Abbr.xlsm

I found a thread on this forum that came close to answering my question but my attempts to pull out the coding that I needed was unsuccessful. Here's a link to the thread: [URL] ........

View 14 Replies View Related

Number Of Days Worked Over A Time Frame

Aug 11, 2009

I need to be able to calculate the actual number of days worked for an employee over a specific date range. I have a data sheet containing employee, transactions, and date of transaction (date only, does not include time). The actual number of days worked may fluctuate due to time off or holidays, so I need to be able to calculate this individually by employee. For example, with columns Employee, Transaction, & Transaction Date:

123 ABC 07/01/2009
123 ABC 07/02/2009
123 DEF 07/02/2009
123 GHI 07/02/2009
123 ABC 07/03/2009
123 ABC 07/07/2009
123 DEF 07/07/2009
123 ABC 07/08/2009
123 ABC 07/09/2009
etc....

Should return 4 work days for employee 123 over the date range 07/01/2009-07/07/2009

View 9 Replies View Related

Count Of Employees That Worked Within Time-frame

Mar 4, 2008

I am trying to do a timesheet spreadsheets that lists employees clockin and clockout times

Name Start End num hours worked
Cory 02:00 04:00 2
Jack 23:00 05:00 6
Fred 10:00 17:00 7

and then go through the list and and count the number of employees in a certain range.

time range number of employees working
05:00-06:00 1
06:00-07:00 2
07:00-08:00 6
08:00-09:00 5
09:00-10:00
10:00-11:00
11:00-12:00
12:00-13:00..............

View 4 Replies View Related

Count Within Time-Frame Accounting For Sick Days

Apr 3, 2008

Im trying to count people working during times of the day. They work shifts from 8am to 9pm. I need to know at each 30 minute interval of the day how many are working. IE at 12:00 or say 13:30 I need to know how many are working. I also need to be able to account for people that are sick. IE If a person works during the day I wouldnt count them as sick at night.

Im data is set up like
Column A agent name
Column B agents start time
Column C agents end time
Column D holds two variables either sick or support.

I have found a thread that counts the people working but doesnt account for the sick or support variables. I didnt link that thread as I thought it went against the rule "STATE WHAT YOU WANT TO DO, NOT WHAT YOU THINK YOU NEED TO ACHIEVE IT "

View 9 Replies View Related

Vlookup - Finding Additional Values From Duplicates Using Additional Column

Jan 29, 2014

I am using a spreadsheet as a score sheet for a competition. One of the columns is the student's GPA. After entering all the scores there are duplicate final scores. I need a way to have it look at the final score and then use the GPA so that it will not put a duplicate value in the final column.

al Column N is the Total Column, Column O has the Names that correspond to the Total Column. Currently I am taking this total and putting it into Column Q (High Scores) in high to low order. Column R should have the names that match the scores. But with duplicate scores, it is only putting the first name associated with the score. I would like to use the GPA as a final determining factor for the duplicate scores. The higher GPA would come before a lower GPA. I have tried to put an additional column to bring the GPA over to correspond with the High Scores Column, but could not get it to work.There are actually more names for the competition and the top 10 will be moved to a different sheet and further judged. I have attached a sample with the exact formulas that I am using.

View 1 Replies View Related

IF Function To Compare Specific Time To Time In Cell

Nov 19, 2008

I am looking for a formula to change a condition based on the time of day. Essentially, before 1pm I would like the formula to be:

=((I12/100)*25)/D12

After 1pm I would like the formula to be

=((I12/100)*25)/B12

I tried various ways with "=if(now()> ..." formulas to no avail because of the way Excel handles Now().

View 6 Replies View Related

Adding Various Time Data Points In One Cell

Jan 10, 2013

I have a number of time data elements of different recordings that i would like to be able to use one formula in one cell and have it give me to total time. For example:

00:03
00:55
00:47
00:05

All in one cell (i.e., not having each data point in a cell), I would like to have the formula tell me that these four recording times equal 00:01:48 (i.e., 1min 48 sec).

View 1 Replies View Related

Adding Time: Adding Individual Cells Works, But SUM Doesn't

Mar 28, 2008

I have a column of times: e.g. 10:03:00 and I would like to add them all up.

=A1+A2 works fine.

=sum(A1:A10) does not.

View 14 Replies View Related

Time In Specific Cell When A1 Contains Data

Mar 24, 2009

A vehicle has been assigned to collection, time of entry appears in Load cell coresponding with vehicle eg.e vehicle 1 'A1' = load 1 'B1'. I can get the exact time to appear in the cell currently but when I try to assign a second truck, the load 2 'B2' cell AND the load 1 'B1'. Im sure that there is an easy way to do this but i just cant figure it out. Can someone please help me out. Can i disable the cell that is updating?

View 9 Replies View Related

Adding Time More Than 24 Hours To Date Time Stamp?

May 30, 2012

I want to add hours to a date-time cell to get result in date-time.

Format of cell A1 is d/m/yy h:mm AM/PM
Format of cell A2 is General
Format of cell A3 is d/m/yy h:mm AM/PM

I want to add A2 (number of hours) to A1 to give A3.

The formula I used is A3=A1+Time(A2,0,0)

The formula works perfectly fine when A2 is less than 24, but when A2 is more than 24, the date doesn't get changed.

View 6 Replies View Related

Skip Weekends Adding Time To Date & Time

Sep 7, 2007

I need a formula to add just the time to ' date and time', ignoring weekends.

eg:

Fri 24-Aug-07 10:52 is the date and time

28:48:00 is the time

If I add the time to 'date and time', result is coming as Sat 25-Aug-07 15:40

But it should come as Mon 27-Aug-07 15:40 (hence ignoring weekend)

View 9 Replies View Related

Clicking On A Cell To Get Additional Details

Feb 3, 2009

I have seen this on many spreadsheet but never figured out how to do this - click on a cell in a spreadsheet to open up a new spreadsheet?

View 4 Replies View Related

Adding A Time Offset Based On Time Of Day

Oct 1, 2008

I am replicating a Matlab program which calculates tide levels at different times of day. I need to replicate it in excel to speed up data analysis and I am nearly there.

what happens is I need to apply a time offset to the time of high tide at port a based on the time of day, so if it is:

between 00:00 and 06:00 the high tide at port b is 81.6 minutes after the peak at port a
between 06:00 and 12:00 the high tide at port b is 74.56 minutes after the peak at port a
between 12:00 and 18:00 the high tide at port b is 81.75 minutes after the peak at port a
between 06:00 and 12:00 the high tide at port b is 79minutes after the peak at port a

I tried this formula, where CO2 has the time/date of the high tide at port a:
=IF(CO2<0.75,IF(CO2<0.5,IF(CO2<0.25,CL2+(81.6/(24*60)),CL2+(74.56/24*60)),CL2+(81.75/(24*60))),CL2+(79/(24*60)))

The problem is the high tide on 07/01/2005 07:45 is read as 38359.32 rather than 0.32 - is there any easy way to tell excel I'm only interested in the time not the date? I have this spreadsheet setup now to do all the other bits required and i is just the timing that is a problem.

View 5 Replies View Related

Flashing Cell & Picture Load Additional Code

Jul 27, 2005

At the moment I have two macros. One loads up a background picture into my work sheet
when I start it up, the other two are called ‘StartBlinking’ and
‘StopBlinking’.

This is the macro code I have to load up the picture:

Sheets("CASHFLOW + FUNDSFLOW").SetBackgroundPicture Filename:= _
"G:EH_Background.JPG"

What I hope to achieve is:

1. Get the picture to ONLY load up if it actually exists on the G:
drive, otherwise do nothing.

2. If value 1 to 13 is input in Cell C3, run the macro
StopBlinking.

3. If Cell C3 is left blank again, run the macro StartBlinking.

View 5 Replies View Related







Copyrights 2005-15 www.BigResource.com, All rights reserved