24X7x365 Employee Shift Scheduling?
May 4, 2013
I'm trying to come up with an Employee Shift Scheduling template. I have 6 employees total with 3 different shifts (day, swing, graveyard). I would like to not do a rotating shift. I'm trying to figure out if a 5X8 shift is better or 4X10 and I would like to come up with a weekly schedule where I can see what shift everyone is working and were I have double coverage.
View 1 Replies
ADVERTISEMENT
Sep 26, 2006
I have a scheduling problem that I'm trying to get my head around. Im sure that some kind person can give me some ideas on how to get this started. It may be extremely easy, but I just cant get it off the ground. Basically I have 15 doctors that work for me - 9 full time (38hrs/week) and 6 part time (15+hrs/week) in a general practice. We are open 7 days a week
Open Close
Monday8:3019:00
Tuesday8:3019:00
Wed8:3019:00
Thur8:3021:00
Fri8:3019:00
Sat9:0018:00
Sun9:0018:00
Doctors have 5 days on and then 2 days off.
The below is the proposed daily schedule and the doctor requirements. % of booked patients for the times and % of random patients for the times are included as well as average waiting times.
Booked Random Waiting Doctors
8:30 - 10:00Morning Hours55%45%30min5-7
10:00 - 13:00Increasing80%20%45min7-8
13:00 - 18:00Busy 100%01.5hr8+
18:00 - 19:00Decreasing70%30%1hr6-7
19:00 - 21:00Night 40%60%30min5+
There are 3 types of patient visits
ShortDoubleTriple
%0.810.140.05
Minutes153045
58% of patients choose their doctor and 42% come in off the street and will take the first available doctor.
and finally - doctors cant work for more than 4 hours without a break. brek details are below
HoursBreak
<4hrs0
4 - 5hrs10min
5 - 8hrs2*10 mins - 45min lunch
8+2 * 10min 2*45min lunch
I need to create a timetable for the doctors which optimises their time based on the above details. I also need to design a data sheet for reception which will maximise the number of patients seen. Finally I need to calculate what the maximum number of patients the centre can see on an average day say monday.
View 9 Replies
View Related
Feb 14, 2007
I'm trying to create an Employee Scheduler. I want my employees (1 technician per row for a total of 10 rows) in the 1st column then the monthly calendar to the right (1 cell/day). That is what you'll see when you open the worksheet. Then, down below I set up my Data Area where I input my project, start date, end date, technician (where each tech is assigned a unique number), and other data across a row of cells. This could be infinite (or at least up to the very last row).
I modified a free Project Scheduler I got from XL-EasyGantt to become my Employee Scheduler but am having some difficulties getting it to do what I want. The project Scheduler basically works by entering (on the same row) the project (or task), the start date and finish date and then the cells get automatically filled in across those dates. This allows for overlapping of tasks but I want to create an Employee Scheduler so it doesn't allow overlapping or schedule a technician to start a new project before he/she has completed the one their on.
The main function which is in each cell of the monthly calendar is as follows: =IF(OR(AND($G28>=K$4,$G28<L$4),AND($M28>=K$4,K$4>=$G28)),IF(AND($E11="x",$M28>=K$4,$M28<L$4),"x",IF($E11=".",".","..")),"")
My problem: I want to be able to look at the Main Schedule and see when each Technician is scheduled for a job (or multiple jobs) for any given month. I want the function to look in my Data Area and assign the start date and end date of a project and the corresponding technician number and fill in the date cells across from their name in the Schedule above.
View 6 Replies
View Related
Jan 24, 2014
I need a formula that will be able to show what shift someone is on if the shift changes, for example. if one of my employees shift changes from and 8hr to a 10 hr on january 16th 2014 then I would like the raw sheet to show the old shift, the new shift and when the new shift started (date). the index formula I have will only show one shift even if there are new dates with a different shift. the formula pulls from the sheet name editor.
i really want the shifts to be different if it was change on a certain date then from that date the employee shift will reflect new shift but still keep the previous shift prior to the day the new shift started.
I've attached a sample workbook to show.
MDT Report December 201322(FILEminimizer).xlsx
View 2 Replies
View Related
Nov 19, 2008
Any non-commercial roster template that would suit 7 day/24 hour/4 person shifts?
Currently we use a totally manual spreadsheet which looks like a Rubik's Cube and does not offer any form of automation in order to speed up entry adn ensure no doubling-up or missing shifts.
View 9 Replies
View Related
Oct 6, 2009
I would like to create a formula that would verify that specific work shifts have been covered each day. The spreadsheet has already been created by someone else, so I am hoping not to recreate the wheel.
The goal is to make sure that all desired shifts are covered with a result in the last cell of the column that would indicate "covered", "not covered" or even a true or false statement.
As an example, an 8am shift is needed. The choices are 8A or 8ALEAD and only one of these is needed for each day.
Can something be set up with conditional formatting from a master list of required shifts.
such as: 7OR, 730*(for just 730 and 730LEAD), 11A, etc.
This is just a snippet of what the schedule looks like: ...
View 14 Replies
View Related
Dec 1, 2009
I have the basics set up, but need to work out how to make it calculate my pay per shift dependant on the type of shift i have worked.
I have attached a screen shot of the current page,
In it i have currently used validation drop boxes for the location and worked columns with tables just to one side of the sheet.
The shift pay is the column i am having trouble with.
I would like it to change dependant on what is selected in the 'worked' column.
For most things it should just display basic plus holiday, however if supervisor is selcted in the work column, it should display basic plus holiday plus supervisor.
View 3 Replies
View Related
Apr 11, 2008
a person works for certain hours and get paid according to the hours worked either by day or by night or a mix of both. Day payment is $8 when worked between 08:00 and 19:59 , night payment is $12 when worked between 20:00 and 07:59. The excel cell are formatted as datetime with yyyy-mm-dd hh:mm , the function works fine in getting the time information and checking whether the whole work is all day or all night , yet the if-then-else statements for calculation seems to be wrong!!
examples:
start = 2008-01-01 09:15 , end = 2008-01-01 11:40 , all day as it is between 08:00 and 20:00 and cost = 8/hr = 19.333
start = 2008-01-03 21:05 , end = 2008-01-04 02:05 , all night as it is between 20:00 and 08:00 and cost = 12/hr = 60.000
start = 2008-02-02 19:00 , end = 2008-02-02 20:05 , cost = 9.000 as 1 hour day = 8.000 plus 5minutes night = 1.000
Function prod(st As Date, en As Date) As Double
Dim shour As Integer
Dim smin As Integer
Dim ehour As Integer
Dim emin As Integer
Dim stod As String
Dim etod As String
pday = 8
pnight = 12
shour = Hour(st)
smin = Minute(st) + shour * 60
If (shour >= 8 & shour < 20) Then
stod = "day"
Else
stod = "night"
End If
ehour = Hour(en)
emin = Minute(en) + ehour * 60
If (ehour >= 8 & ehour < 20) Then.................
View 8 Replies
View Related
Jan 16, 2009
Attached is the file wherein I am trying to make the scheduling gantt for UAE calendar where the weekends are Friday and Saturday. I am not able to format sundays as workdays some how through my conditions.
View 2 Replies
View Related
Nov 28, 2008
I have columns with the dates on the top, and staff listed on the rows to the left of the speadsheet. I must have 4 H's (indicating a base location), and 4 F's (indicating another base) in the column below the date. I want to have a cell, just above the date which will highlight red if there are any less than 4 H's and 4 F's. If there are 4 H's and 4 F's in the column (indicating full staffing levels), then I want the same cell to turn green, indicating that the day is OK. The red highlight would be a quick scan for supervisors to look at and see if we are deficient on staffing, and will prompt us to look for people who can be the missing H or F.
View 3 Replies
View Related
Feb 14, 2007
I have a table like the one below:
Day Night
2/26/2007DC
2/27/2007AB
2/28/2007AB
3/1/2007 CD
3/2/2007 CD
3/3/2007 BA
3/4/2007 BA
Each letter represents a 12 hour shift (ex. D team has 36 hours for the week). If I need coverage on 2/27/07 on the day shift, I need to find a team that is working 36 hours for that week and was not scheduled to work the shift before or the shift after. (Example, on 2/27/07 A team needs coverage. The only teams working 36 hours are D and C. C team work the previous shift. So the code would input D in a cell).
View 4 Replies
View Related
Feb 15, 2007
Is there a way to set the ontime application to run even when excel is turned off? I'd like to be able to refresh a data table every morning at 6:30, even if excel is not on. Ideally, if even my computer isn't on. The code below works, but only if the sheet is open to the exact worksheet.
Option Explicit
Public RunWhen As Double
Public Const cRunWhat = "The_Sub"
Sub StartTimer()
RunWhen = TimeValue("09:54")
Application.OnTime earliesttime:=RunWhen, procedure:=cRunWhat, _
schedule:=True
End Sub
Sub The_Sub()
'my code here
StartTimer
End Sub
View 2 Replies
View Related
Sep 9, 2006
I have a simple macro that I run when I hit "Ctr Q".
How do I ensure that this macro runs every 5 minutes automatically from the first time I hit "Ctr-Q". Currently, it only runs once and then stops.
Here's my macro for your view:
Sub Macro1()
'
' Macro1 Macro
' Macro recorded 08-09-2006 by Scott
'
' Keyboard Shortcut: Ctrl+q
'
Range("B6").Select
ActiveCell.FormulaR1C1 = "NOW()"
Range("B6").Select
ActiveCell.FormulaR1C1 = "=NOW()"
Range("A4").Select
End Sub
View 9 Replies
View Related
May 16, 2014
If i input a 3 in a1 how do i return data in the 3 rows below:
Attached File : schedule2.xlsx
View 3 Replies
View Related
Jun 10, 2014
I have 20 staff members that I need to schedule in half day shifts (AM & PM) across three different locations for the month of July.
I want to make sure there is no overlap/duplication for any one staff in a time slot. Nor do I want any one staff member to work an AM and PM shift in the same day.
Ideally, I would also like to avoid back-to-back shifts (e.g., not allow PM on Monday to be scheduled for an AM on Tuesday).
Lastly, I would like to have the number of shifts be be as equitably distributed across all of the staff members as well.
Any way that I can do this in Excel?
View 1 Replies
View Related
Apr 13, 2006
I have a macro that I want to run on an hourly basis, say at 9am, 10am, etc whenever the workbook is open. This needs to be definable as I have several users that will be conducting the same activity throughout the day. In other words I want the macro to run on the hour for user 1, quarter past the hour for user 2, half past for user 3 and quarter to for user 4. Each user does have their own unique macro to run so it should (hopefully) just mean introducing a line of code to each, defining the time to run.
View 4 Replies
View Related
Oct 4, 2007
I have an excel spreadsheet that contains customer data exported from Quickbooks. In that file there is a column called CType (Column G) which contains the scheduling cycle for that customer. There are eleven different possible schedules, including 15xYr, 1xMo, 2xMo, EOM (every other month), EOW (every other week), EOW-S / 1xMo-W (every other week between 5/1 and 10/31 and once a month during the rest of the year), EOW-Th (every other week but must be on a Thursday), ETW (every third week), On Call, W, Q.
Although the number of records changes daily, on average there are about 950 rows of data in the spreadsheet.
I need to set up an array (?) for the values in column G starting with G2 through the last non-blank row (all records will have data in column G), and calculate the next scheduled service date based on the schedule type shown in column G and the last service date which will appear in column M of that row. The last thing I need to consider is whether there is a value in Column N, which would represent a hard-entered ‘Next Scheduled Service Date’. If I find a date in that column it needs to over-ride the calculated value. My assumption to this point is that I should use a new column T to hold the value of the calculated schedule date. There are a few other details, but rather than confuse this whole thing further I’ll stop there.
What I’m struggling with is the most efficient means of running this macro. I’ve been looking at many, many threads over the past few weeks, reading
VBA Programming for Dummies (which I apparently am), and reviewing other resources.
View 3 Replies
View Related
Apr 9, 2008
I am wanting to have a schedule posted as 8:00am to 5:00pm to show up in a format that shows the interval every thirty minutes with either a 1 or a zero so that I can calculate each intervals total staffing. Also if a break or lunch is entered I would like it to show a zero or .5 in the field (.5 being for 15 mins and 0 for anything taking the full 30 mins).
View 3 Replies
View Related
Nov 18, 2009
I have a Start Shift and an End Shift time,
Start Shift = 2009/11/10 09:27:06 (GMT-6:0)
End Shift Time= 2009/11/10 15:13:03 (GMT-6:0)
eg. Total Time = 5.3 hrs
I would like to take if from this format, and calculate the total time difference. Sometimes the GMT codes may be -5:0 if that means anything. For the cell "Total Time" I only need it to have a decimal format.
View 12 Replies
View Related
May 30, 2014
So I'm having a problem trying to make this scheduling sheet.. What I did was row a would be the employee list then b,c,d and so on are mon-sun Originally in b1 I would put like 9am-5pm and c1 8-4 and so on and in row i I put the total and added a sum function but somehow it wasn't able to calculate. So then I redid the whole thing this time in row b1 i put 9am and c1 5pm and so on and again I put the total and added the function and it still came out wrong..
View 2 Replies
View Related
Apr 22, 2006
I need to dispatch 10 technicians across the US starting each Monday. They go to 10 different customers for the whole week. I know the distance between each technician and each customer. What I would like to do is assign each technician to a customer so that the total distance traveled for all the technicians is minimized. I know that if it was only 3 techs and 3 customers (as an example), I could build a table of all the possible combinations (3 factorial or 6 permutations), determine the distance for each permutation and select the minimum. I'm not sure that doing this method with 10 techs is feasible as the number of permutations is 10 factorial or over 3 million possibilities. Anyone see a workable solution?
I've include a spreadsheet with customers, technicians and the distances between them!
View 9 Replies
View Related
Jan 13, 2009
I am making a schedule and I would like it to take out a 30 min break if the hours worked is over 6 hours.
I have so far
A B
1 11:00 7:30
=24*(B1-A1)
Gives me 8 hours, I would like it to subtract the 30 minutes only ifthe sum is over 6 and not alter the sum if it is under 6.
View 9 Replies
View Related
Sep 29, 2009
This is what I am looking to do and I am having an issue with it.
worksheet "beeble"
Column B has all the employee numbers listed from B3 to B100
Column C needs to have the emp name put in to them based on the emp number.
worksheet "weeble"
This sheet has the list of employees with their Emp#
A2 down to A99 is the number B2 on down is the name that belongs to the emp #
At issue is sheet "beeble" changes day to day depending who is scheduled to work in a certian area, otherwise this would be quite easy.. It is very easy for us to put the emp# in instead of the emp-name, so that is why wwe would need to be able to pull this information from the other sheet.
This may end up being very easy, but it is beyond me, and I cannot find what I need from a book, as I spent last night on here searching and reading through a few of my books..
View 13 Replies
View Related
Sep 3, 2007
I have a list of employees that i need to simplify into groups as listed below
Employee No's
1-19
20-50
50-199
200-499
500+
In my list of data (attached) that i receive i currently manually count the employee numbers and then put them into the relevant bands dependant on the employee sizes. Example:
Employee List
4
28
35
46
503
376
2000
Employee No's
1-19 - 1
20-50 - 1
50-199 - 3
200-499 - 1
500+ - 2
View 11 Replies
View Related
Sep 11, 2007
SEE ATTACHED FILE
All,
I have a spreadsheet that lists each employees hours for the last 4 pay periods...each is in it's own row I am trying to find out their average.
I am using the subtotal function to average their hours and that works fine. BUT...my boss doesn't want to see 4 rows for each person. He just wants to see one row for each person and when I collapse the rows, it only shows the employee's ID, not the name (because that's what I told the subtotal function to do...add subtotal after every change in employee ID).
name appears instead of the employee ID? That's useless to him because he hasn't memorized all the Employee's IDs.
View 13 Replies
View Related
Apr 17, 2008
I was given a task of calculating bonus for number of projects per employee. The maximum number of projects per employee is 30 and they have completed different number of projects. Data is as follows:
Column A - Name
Column B - Date
Column C - Project
Employee name repeats one row per project and project repeats as they are working with it.
I need to list individual employee names in column D and the number of projects each employee has done in column E. A project can be saved many times thus creating many rows for that same employee. Do you think it is possible to accomplish this. One formula for column D and one formula for column E. If needed I can attach an example file or take a screen shot of it.
View 9 Replies
View Related
Feb 2, 2009
i have two col A and B
In col A name of the employee
In col B there production for the Month
I need in c col to rank them that according to there production for the month like 1,2,3, etc.
View 9 Replies
View Related
Jan 26, 2010
I have created a spreadsheet in Excel where it gives me a report of how many hours my employees do per week and it seperate them in different categories.
What I would like to do is find a way to match the cell's description with the amount of total hours that were spend on certain project.
So here is the scenario.
In my department there 6 employees that are assigned to work on certain projects in daily basis. These projects are called CRs and to identify them I've added a number after them.
So we will have CR0001, CR0002, ect. These are unique projects.More that one employee that could woork at the same project as well on other sections but I am only interested on the projects.
To help you understand what I am trying to do I will give you an example.
John is working on project CR0005, CR0006, CR0001. He has been working on them three projects for the last week.
Here is the summary of the hours:
- 5 hours on CR0005
- 10 hours on CR0006
- 5 hours on CR0001
This information is inputed in Excel spreadsheet Week 1 .....
View 12 Replies
View Related
Oct 27, 2007
how to use formula in the monthly contribution field to calculate 7% of pay (salary)
Lenght of Total pay Monthly contribution cummulative
Service retirement value
3.6 $528.94
Please one more thing. How do i use FV Function, monthly contribution, and the lenght of service field to to determine the current value of the employees retirement palan.
View 10 Replies
View Related
Nov 2, 2008
i am creating a weekly time sheet for my company.the problem that i have is when the persons time reaches 40 hours, the time needs to be calculated in the overtime field. this is really tough for me when the person reaches 40 hours in the middle of the work day. I cant figure it out. i have attached the spreadsheet if you would like to look.
View 2 Replies
View Related