Employee Number
Sep 3, 2007
I have a list of employees that i need to simplify into groups as listed below
Employee No's
1-19
20-50
50-199
200-499
500+
In my list of data (attached) that i receive i currently manually count the employee numbers and then put them into the relevant bands dependant on the employee sizes. Example:
Employee List
4
28
35
46
503
376
2000
Employee No's
1-19 - 1
20-50 - 1
50-199 - 3
200-499 - 1
500+ - 2
View 11 Replies
ADVERTISEMENT
Sep 6, 2013
Is it possible with excel, to automatically insert an employees number if their name is inserted.
Example:
Column A If Smith, John is entered in Column B automatically have his employee number show 5668?
Joe, Mary entered in Column A Column B to show 12345
This would save me a huge amount of time going back and fourth.
View 3 Replies
View Related
Oct 31, 2008
I have been given a database with peoples names that require a unique number to hide/replace the name to hide their identity for a meeting and to act as a ghost system.
The problem i have is that some individuals names on the list appear more than once so i cannot simply call Joe Bloggs number 3 as he can appear further down the list at number 120.
I was wondering is there is a way to do this without manually replacing each name with a number and making and logging the persons name that corresponds to the number.
as there are 600 names and some can appear up to 4 - 5 times!
View 9 Replies
View Related
Aug 9, 2013
I am trying to get the correct formula to count the number of days it has been for each employee since the last occurrence of an absence/tardy. For each employee, starting with the beginning of the year, we mark and employee as Absent as an "A" or Tardy as "T". See below the examples.
...................................1/1 ....1/2 ....1/3 ....1/4 ....1/5 ....1/6 ....1/7 ....1/8 ....1/9 ....1/10 ....1/11 ....1/12 ....1/13
Captain America ................................A ..........................T .....................................T
Incredible Hulk.......................................................................................... A
Spider Man ........................................................................................................................ ........A
Iron Man ....................................................T
( I added dots because it wouldn't let me space them out?)
We are keeping track so that employees have the ability to make up numbers because after so many occurrences they can become terminated. If an employee has about 60 days in a row without an infraction, that employee can deduct a day from their total on the year.
Any formula to use. Also to include a vlookup so that I could have their name as well with the number of days on a separate tab!
View 4 Replies
View Related
Oct 14, 2007
I am trying to create a rota in excel but I am struggling to get it to add up the total number of hours per week per employee.
It get a little complicated as they work split shift so they may do 4 hours in the afternoon and another shift in the evening going into the next day, example they may work 11.00 am - 3.00 pm and 8.00 pm untill 2 am.
View 9 Replies
View Related
Oct 16, 2009
I am trying to calculate the number of days since an employee worked. Column A has the date and columns B,C, and D show the name of the 3 employees who worked that day. Each row shows the next day in column A with the three employees who worked that day in columns B,C, and D. I need the format of the excel sheet to remain the same. I'm looking for a formula that will calculate the number of days since each employee has worked...there are 10 different employees and only 3 work each day.
View 19 Replies
View Related
Aug 9, 2013
I am trying to get the correct formula to count the number of days it has been for each employee since the last occurrence of an absence/tardy. For each employee, starting with the beginning of the year, we mark and employee as Absent as an "A" or Tardy as "T". See below the examples.
Employee Name
Date:
1/1
1/2
1/3
1/4
1/5
1/6
1/7
1/8
1/9
1/10
[code]....
We are keeping track so that employees have the ability to make up numbers because after so many occurrences they can become terminated. If an employee has about 60 days in a row without an infraction, that employee can deduct a day from their total on the year.
Also to include a vlookup so that I could have their name as well with the number of days on a separate tab!
View 2 Replies
View Related
Jun 18, 2009
Our office has a vacation days accrual policy based on number of years worked. We have a vacation days number, based on year of employment, the employee earns monthly. I need help with a worksheet, formulas, to document each employee, the year of employment they're in, # of days they have available based on the current month (which would need to add up automatically as the year progresses), then any days they request off, and finally a remaining balance of days left.
View 6 Replies
View Related
Feb 22, 2009
I have what I thought was going to be a simple function to create and, after a week of getting more error messages than I've had in a year, I'm ready to throw in the towel. Situation: There are two worksheets in the same workbook [Excel 2003]. One is for "Posting" details about technicians and their work orders. The other is a "Report" that summarizes the number of workorders open, closed, etc.
In the "Posting" sheet, I have created dynamic name ranges for two columns: Technician (4-digit text field) and InDate (date field that, if blank, means that the technician has not closed this work order. My ranges are set up like this:
Technician=OFFSET(Posting!$B$2,0,0,COUNT(Posting!$B:$B),1)
InDate=OFFSET(Posting!$D$2,0,0,COUNT(Posting!$D:$D),1)
So all I need to do is to total all the blank InDates for each Technician by employee number. I've tried COUNT to SUMPRODUCT. A co-worker got it to work with using...=SUMPRODUCT((ISBLANK(Posting!$D$2:$D$65307))*(Posting!$B$2:$B$65307=4288))
His solution was to list almost every available cell in each column. I just can't help but think that the dynamic name range should be able to work but I can't get it right. I think I'll choke if I get one more "N/A" or "VALUE! error.
View 3 Replies
View Related
Sep 29, 2009
This is what I am looking to do and I am having an issue with it.
worksheet "beeble"
Column B has all the employee numbers listed from B3 to B100
Column C needs to have the emp name put in to them based on the emp number.
worksheet "weeble"
This sheet has the list of employees with their Emp#
A2 down to A99 is the number B2 on down is the name that belongs to the emp #
At issue is sheet "beeble" changes day to day depending who is scheduled to work in a certian area, otherwise this would be quite easy.. It is very easy for us to put the emp# in instead of the emp-name, so that is why wwe would need to be able to pull this information from the other sheet.
This may end up being very easy, but it is beyond me, and I cannot find what I need from a book, as I spent last night on here searching and reading through a few of my books..
View 13 Replies
View Related
Sep 11, 2007
SEE ATTACHED FILE
All,
I have a spreadsheet that lists each employees hours for the last 4 pay periods...each is in it's own row I am trying to find out their average.
I am using the subtotal function to average their hours and that works fine. BUT...my boss doesn't want to see 4 rows for each person. He just wants to see one row for each person and when I collapse the rows, it only shows the employee's ID, not the name (because that's what I told the subtotal function to do...add subtotal after every change in employee ID).
name appears instead of the employee ID? That's useless to him because he hasn't memorized all the Employee's IDs.
View 13 Replies
View Related
Apr 17, 2008
I was given a task of calculating bonus for number of projects per employee. The maximum number of projects per employee is 30 and they have completed different number of projects. Data is as follows:
Column A - Name
Column B - Date
Column C - Project
Employee name repeats one row per project and project repeats as they are working with it.
I need to list individual employee names in column D and the number of projects each employee has done in column E. A project can be saved many times thus creating many rows for that same employee. Do you think it is possible to accomplish this. One formula for column D and one formula for column E. If needed I can attach an example file or take a screen shot of it.
View 9 Replies
View Related
Feb 2, 2009
i have two col A and B
In col A name of the employee
In col B there production for the Month
I need in c col to rank them that according to there production for the month like 1,2,3, etc.
View 9 Replies
View Related
Jan 26, 2010
I have created a spreadsheet in Excel where it gives me a report of how many hours my employees do per week and it seperate them in different categories.
What I would like to do is find a way to match the cell's description with the amount of total hours that were spend on certain project.
So here is the scenario.
In my department there 6 employees that are assigned to work on certain projects in daily basis. These projects are called CRs and to identify them I've added a number after them.
So we will have CR0001, CR0002, ect. These are unique projects.More that one employee that could woork at the same project as well on other sections but I am only interested on the projects.
To help you understand what I am trying to do I will give you an example.
John is working on project CR0005, CR0006, CR0001. He has been working on them three projects for the last week.
Here is the summary of the hours:
- 5 hours on CR0005
- 10 hours on CR0006
- 5 hours on CR0001
This information is inputed in Excel spreadsheet Week 1 .....
View 12 Replies
View Related
Oct 27, 2007
how to use formula in the monthly contribution field to calculate 7% of pay (salary)
Lenght of Total pay Monthly contribution cummulative
Service retirement value
3.6 $528.94
Please one more thing. How do i use FV Function, monthly contribution, and the lenght of service field to to determine the current value of the employees retirement palan.
View 10 Replies
View Related
Nov 2, 2008
i am creating a weekly time sheet for my company.the problem that i have is when the persons time reaches 40 hours, the time needs to be calculated in the overtime field. this is really tough for me when the person reaches 40 hours in the middle of the work day. I cant figure it out. i have attached the spreadsheet if you would like to look.
View 2 Replies
View Related
Sep 16, 2008
I'm trying to create a weekly employee schedule using Excel 2007 and have several issues but will start with one at a time till we get them all resolved.
I put in my start hour '6' in cell 'B7' and get this: 1/5/1900 12:00:00 AM.
I would like for to display 6AM.
I figure if I get his cell fomatted that I can get the other times correct then go on to the next issue.
View 10 Replies
View Related
Apr 1, 2009
I am using excel as point of sale book (to record customer name, service, and total price etc.) at our hair salon. We have employees that may be there to manage alone from time to time, and enter clients into excel.
Our worry is straight forward, and involves them erasing what they wrote. I am confident that the actual service and price is entered at the beginning, but want to track their changes to their own entries.
The "track changes" would work if it "tracked changes" after entry. But it seems to track the last change from saving. For example....the employee enters $40.25 presses enter--after she knows she can get away with a change, she may erase it altogether or change it to say $16.75.
View 9 Replies
View Related
Apr 8, 2009
I have problem to make an excel evidence which will track total working hours of employee during the month, how many times employee was late for work and how many times employee was on lunch break longer than 30 minutes.
And I made table which count all these things but problem is Saturday because on that day start work is 9::00 AM and all other days is 8:00
Formula for counting how many times employee was late is:
COUNTIF(D8:AC8,">0.336805555555555555555555555555")
where D8:AC8 is range where are all start work times in month and 0.336805555555555555555555555555 is 8:00 AM (serial number which is equivalen of 8:00 AM)
How to improve this formula to count properly because now it counts as a late when employee start work on Saturday on 9:00 AM (and that shouldnt count as a late)
[IMG]file:///C:/DOCUME%7E1/Nesa/LOCALS%7E1/Temp/moz-screenshot.jpg[/IMG]
View 9 Replies
View Related
Sep 26, 2006
I have a scheduling problem that I'm trying to get my head around. Im sure that some kind person can give me some ideas on how to get this started. It may be extremely easy, but I just cant get it off the ground. Basically I have 15 doctors that work for me - 9 full time (38hrs/week) and 6 part time (15+hrs/week) in a general practice. We are open 7 days a week
Open Close
Monday8:3019:00
Tuesday8:3019:00
Wed8:3019:00
Thur8:3021:00
Fri8:3019:00
Sat9:0018:00
Sun9:0018:00
Doctors have 5 days on and then 2 days off.
The below is the proposed daily schedule and the doctor requirements. % of booked patients for the times and % of random patients for the times are included as well as average waiting times.
Booked Random Waiting Doctors
8:30 - 10:00Morning Hours55%45%30min5-7
10:00 - 13:00Increasing80%20%45min7-8
13:00 - 18:00Busy 100%01.5hr8+
18:00 - 19:00Decreasing70%30%1hr6-7
19:00 - 21:00Night 40%60%30min5+
There are 3 types of patient visits
ShortDoubleTriple
%0.810.140.05
Minutes153045
58% of patients choose their doctor and 42% come in off the street and will take the first available doctor.
and finally - doctors cant work for more than 4 hours without a break. brek details are below
HoursBreak
<4hrs0
4 - 5hrs10min
5 - 8hrs2*10 mins - 45min lunch
8+2 * 10min 2*45min lunch
I need to create a timetable for the doctors which optimises their time based on the above details. I also need to design a data sheet for reception which will maximise the number of patients seen. Finally I need to calculate what the maximum number of patients the centre can see on an average day say monday.
View 9 Replies
View Related
Apr 11, 2013
Just like if I put the employee's number and work time for each day,
The excel will accumulate the hours automatically somewhere in the sheet. (I don't want the total hour cover each day's work time)
Is there anyway I can do it?
View 5 Replies
View Related
Dec 10, 2013
looking to find a formula to find the courses that an employee has not taken from a list. I have a list of courses in column F, in which I can compare to column C using their EmpID number from column A and obtain a result as taken or missing in column D. I am currently using :
[Code].....
or
[Code] ....
to get the results in column D. However, with these two formulas I am getting all the courses taken by each employee and not the missing courses.
View 8 Replies
View Related
Jan 24, 2014
I need a formula that will be able to show what shift someone is on if the shift changes, for example. if one of my employees shift changes from and 8hr to a 10 hr on january 16th 2014 then I would like the raw sheet to show the old shift, the new shift and when the new shift started (date). the index formula I have will only show one shift even if there are new dates with a different shift. the formula pulls from the sheet name editor.
i really want the shifts to be different if it was change on a certain date then from that date the employee shift will reflect new shift but still keep the previous shift prior to the day the new shift started.
I've attached a sample workbook to show.
MDT Report December 201322(FILEminimizer).xlsx
View 2 Replies
View Related
Jan 29, 2014
I have data that is added to every week. I need an equation to count how many times each employee show up each weekending.
View 3 Replies
View Related
Feb 27, 2014
I have a Log In/Log Out report that I need pulling data from.
Ultimately what I want to do is get the amount of time my employees were logged out.
I am using Excel 2003. Attached is an example of the data I'm working with.
Sheet 1 contains the data, and Sheet 2 will be the summary.
So, looking at Bob's times: If column A contains Bob (A2 in this case), and the same row in column G (G2) contains 79, subtract the contents of the same row in column F (F2) from the next row down in column D (D3) (which would be D3 - F2). That result should populate on Sheet 2 next to Bob's name in h:mm:ss format.
If there is nothing in the next row down in column D, then do nothing.
I would like to leave the data as is, if possible. There are extension numbers next to the names in the data. If possible to ignore those when rolling up to the summary that would be useful. Also, on the summary sheet, if the employee is not on the data sheet (if they had the day off) they can have 0 or NA or something to indicate there is no data for them.
View 1 Replies
View Related
Jul 5, 2014
I modified an employee schedule that I found on here to meet my needs but I am needing one more thing:
I need a field (or separate worksheet in the workbook) where I can enter employee availability and if they are unavailable for a specific day, it will auto update in the calendar stating they are unavailable for that day.
View 7 Replies
View Related
Nov 19, 2008
Any non-commercial roster template that would suit 7 day/24 hour/4 person shifts?
Currently we use a totally manual spreadsheet which looks like a Rubik's Cube and does not offer any form of automation in order to speed up entry adn ensure no doubling-up or missing shifts.
View 9 Replies
View Related
Oct 6, 2009
I would like to create a formula that would verify that specific work shifts have been covered each day. The spreadsheet has already been created by someone else, so I am hoping not to recreate the wheel.
The goal is to make sure that all desired shifts are covered with a result in the last cell of the column that would indicate "covered", "not covered" or even a true or false statement.
As an example, an 8am shift is needed. The choices are 8A or 8ALEAD and only one of these is needed for each day.
Can something be set up with conditional formatting from a master list of required shifts.
such as: 7OR, 730*(for just 730 and 730LEAD), 11A, etc.
This is just a snippet of what the schedule looks like: ...
View 14 Replies
View Related
May 4, 2013
I'm trying to come up with an Employee Shift Scheduling template. I have 6 employees total with 3 different shifts (day, swing, graveyard). I would like to not do a rotating shift. I'm trying to figure out if a 5X8 shift is better or 4X10 and I would like to come up with a weekly schedule where I can see what shift everyone is working and were I have double coverage.
View 1 Replies
View Related
Jul 7, 2009
how can I sum up all the "Type of Defect"[CR, LOF, DR] for a specific Welder. They were tag as Welder 1-7. In the attached example (Sheet1- Data), Welder 1 has 2 "CR" and 1 "LOF", this figures to be reflected in Sheet 2 (TOD).
View 2 Replies
View Related