Formula For Scheduling..?

Nov 28, 2008

I have columns with the dates on the top, and staff listed on the rows to the left of the speadsheet. I must have 4 H's (indicating a base location), and 4 F's (indicating another base) in the column below the date. I want to have a cell, just above the date which will highlight red if there are any less than 4 H's and 4 F's. If there are 4 H's and 4 F's in the column (indicating full staffing levels), then I want the same cell to turn green, indicating that the day is OK. The red highlight would be a quick scan for supervisors to look at and see if we are deficient on staffing, and will prompt us to look for people who can be the missing H or F.

View 3 Replies


ADVERTISEMENT

Scheduling For UAE Calendar

Jan 16, 2009

Attached is the file wherein I am trying to make the scheduling gantt for UAE calendar where the weekends are Friday and Saturday. I am not able to format sundays as workdays some how through my conditions.

View 2 Replies View Related

Code For Scheduling

Feb 14, 2007

I have a table like the one below:
Day Night
2/26/2007DC
2/27/2007AB
2/28/2007AB
3/1/2007 CD
3/2/2007 CD
3/3/2007 BA
3/4/2007 BA

Each letter represents a 12 hour shift (ex. D team has 36 hours for the week). If I need coverage on 2/27/07 on the day shift, I need to find a team that is working 36 hours for that week and was not scheduled to work the shift before or the shift after. (Example, on 2/27/07 A team needs coverage. The only teams working 36 hours are D and C. C team work the previous shift. So the code would input D in a cell).

View 4 Replies View Related

Scheduling Ontime

Feb 15, 2007

Is there a way to set the ontime application to run even when excel is turned off? I'd like to be able to refresh a data table every morning at 6:30, even if excel is not on. Ideally, if even my computer isn't on. The code below works, but only if the sheet is open to the exact worksheet.

Option Explicit
Public RunWhen As Double
Public Const cRunWhat = "The_Sub"
Sub StartTimer()
RunWhen = TimeValue("09:54")
Application.OnTime earliesttime:=RunWhen, procedure:=cRunWhat, _
schedule:=True
End Sub

Sub The_Sub()
'my code here
StartTimer
End Sub

View 2 Replies View Related

Scheduling Macro For Every 5 Minutes

Sep 9, 2006

I have a simple macro that I run when I hit "Ctr Q".

How do I ensure that this macro runs every 5 minutes automatically from the first time I hit "Ctr-Q". Currently, it only runs once and then stops.

Here's my macro for your view:

Sub Macro1()
'
' Macro1 Macro
' Macro recorded 08-09-2006 by Scott
'
' Keyboard Shortcut: Ctrl+q
'
Range("B6").Select
ActiveCell.FormulaR1C1 = "NOW()"
Range("B6").Select
ActiveCell.FormulaR1C1 = "=NOW()"
Range("A4").Select
End Sub

View 9 Replies View Related

Employee Scheduling Using Solver

Sep 26, 2006

I have a scheduling problem that I'm trying to get my head around. Im sure that some kind person can give me some ideas on how to get this started. It may be extremely easy, but I just cant get it off the ground. Basically I have 15 doctors that work for me - 9 full time (38hrs/week) and 6 part time (15+hrs/week) in a general practice. We are open 7 days a week

Open Close
Monday8:3019:00
Tuesday8:3019:00
Wed8:3019:00
Thur8:3021:00
Fri8:3019:00
Sat9:0018:00
Sun9:0018:00

Doctors have 5 days on and then 2 days off.

The below is the proposed daily schedule and the doctor requirements. % of booked patients for the times and % of random patients for the times are included as well as average waiting times.
Booked Random Waiting Doctors
8:30 - 10:00Morning Hours55%45%30min5-7
10:00 - 13:00Increasing80%20%45min7-8
13:00 - 18:00Busy 100%01.5hr8+
18:00 - 19:00Decreasing70%30%1hr6-7
19:00 - 21:00Night 40%60%30min5+

There are 3 types of patient visits
ShortDoubleTriple
%0.810.140.05
Minutes153045

58% of patients choose their doctor and 42% come in off the street and will take the first available doctor.

and finally - doctors cant work for more than 4 hours without a break. brek details are below
HoursBreak
<4hrs0
4 - 5hrs10min
5 - 8hrs2*10 mins - 45min lunch
8+2 * 10min 2*45min lunch

I need to create a timetable for the doctors which optimises their time based on the above details. I also need to design a data sheet for reception which will maximise the number of patients seen. Finally I need to calculate what the maximum number of patients the centre can see on an average day say monday.

View 9 Replies View Related

Scheduling - Return Data In 3 Rows

May 16, 2014

If i input a 3 in a1 how do i return data in the 3 rows below:

Attached File : schedule2.xlsx

View 3 Replies View Related

24X7x365 Employee Shift Scheduling?

May 4, 2013

I'm trying to come up with an Employee Shift Scheduling template. I have 6 employees total with 3 different shifts (day, swing, graveyard). I would like to not do a rotating shift. I'm trying to figure out if a 5X8 shift is better or 4X10 and I would like to come up with a weekly schedule where I can see what shift everyone is working and were I have double coverage.

View 1 Replies View Related

Scheduling Staff To Shifts And Locations

Jun 10, 2014

I have 20 staff members that I need to schedule in half day shifts (AM & PM) across three different locations for the month of July.

I want to make sure there is no overlap/duplication for any one staff in a time slot. Nor do I want any one staff member to work an AM and PM shift in the same day.

Ideally, I would also like to avoid back-to-back shifts (e.g., not allow PM on Monday to be scheduled for an AM on Tuesday).

Lastly, I would like to have the number of shifts be be as equitably distributed across all of the staff members as well.

Any way that I can do this in Excel?

View 1 Replies View Related

Scheduling Macros: Run On An Hourly Basis

Apr 13, 2006

I have a macro that I want to run on an hourly basis, say at 9am, 10am, etc whenever the workbook is open. This needs to be definable as I have several users that will be conducting the same activity throughout the day. In other words I want the macro to run on the hour for user 1, quarter past the hour for user 2, half past for user 3 and quarter to for user 4. Each user does have their own unique macro to run so it should (hopefully) just mean introducing a line of code to each, defining the time to run.

View 4 Replies View Related

Scheduling. Imported QuickBooks Data

Oct 4, 2007

I have an excel spreadsheet that contains customer data exported from Quickbooks. In that file there is a column called CType (Column G) which contains the scheduling cycle for that customer. There are eleven different possible schedules, including 15xYr, 1xMo, 2xMo, EOM (every other month), EOW (every other week), EOW-S / 1xMo-W (every other week between 5/1 and 10/31 and once a month during the rest of the year), EOW-Th (every other week but must be on a Thursday), ETW (every third week), On Call, W, Q.

Although the number of records changes daily, on average there are about 950 rows of data in the spreadsheet.

I need to set up an array (?) for the values in column G starting with G2 through the last non-blank row (all records will have data in column G), and calculate the next scheduled service date based on the schedule type shown in column G and the last service date which will appear in column M of that row. The last thing I need to consider is whether there is a value in Column N, which would represent a hard-entered ‘Next Scheduled Service Date’. If I find a date in that column it needs to over-ride the calculated value. My assumption to this point is that I should use a new column T to hold the value of the calculated schedule date. There are a few other details, but rather than confuse this whole thing further I’ll stop there.

What I’m struggling with is the most efficient means of running this macro. I’ve been looking at many, many threads over the past few weeks, reading
VBA Programming for Dummies (which I apparently am), and reviewing other resources.

View 3 Replies View Related

Scheduling Spreadsheet Visual Report

Apr 9, 2008

I am wanting to have a schedule posted as 8:00am to 5:00pm to show up in a format that shows the interval every thirty minutes with either a 1 or a zero so that I can calculate each intervals total staffing. Also if a break or lunch is entered I would like it to show a zero or .5 in the field (.5 being for 15 mins and 0 for anything taking the full 30 mins).

View 3 Replies View Related

Adding Hours / Time In Scheduling Sheet

May 30, 2014

So I'm having a problem trying to make this scheduling sheet.. What I did was row a would be the employee list then b,c,d and so on are mon-sun Originally in b1 I would put like 9am-5pm and c1 8-4 and so on and in row i I put the total and added a sum function but somehow it wasn't able to calculate. So then I redid the whole thing this time in row b1 i put 9am and c1 5pm and so on and again I put the total and added the function and it still came out wrong..

View 2 Replies View Related

Scheduling Technicians Based On Distance To Customer

Apr 22, 2006

I need to dispatch 10 technicians across the US starting each Monday. They go to 10 different customers for the whole week. I know the distance between each technician and each customer. What I would like to do is assign each technician to a customer so that the total distance traveled for all the technicians is minimized. I know that if it was only 3 techs and 3 customers (as an example), I could build a table of all the possible combinations (3 factorial or 6 permutations), determine the distance for each permutation and select the minimum. I'm not sure that doing this method with 10 techs is feasible as the number of permutations is 10 factorial or over 3 million possibilities. Anyone see a workable solution?

I've include a spreadsheet with customers, technicians and the distances between them!

View 9 Replies View Related

Employee Scheduling Program Gantt Chart

Feb 14, 2007

I'm trying to create an Employee Scheduler. I want my employees (1 technician per row for a total of 10 rows) in the 1st column then the monthly calendar to the right (1 cell/day). That is what you'll see when you open the worksheet. Then, down below I set up my Data Area where I input my project, start date, end date, technician (where each tech is assigned a unique number), and other data across a row of cells. This could be infinite (or at least up to the very last row).

I modified a free Project Scheduler I got from XL-EasyGantt to become my Employee Scheduler but am having some difficulties getting it to do what I want. The project Scheduler basically works by entering (on the same row) the project (or task), the start date and finish date and then the cells get automatically filled in across those dates. This allows for overlapping of tasks but I want to create an Employee Scheduler so it doesn't allow overlapping or schedule a technician to start a new project before he/she has completed the one their on.

The main function which is in each cell of the monthly calendar is as follows: =IF(OR(AND($G28>=K$4,$G28<L$4),AND($M28>=K$4,K$4>=$G28)),IF(AND($E11="x",$M28>=K$4,$M28<L$4),"x",IF($E11=".",".","..")),"")

My problem: I want to be able to look at the Main Schedule and see when each Technician is scheduled for a job (or multiple jobs) for any given month. I want the function to look in my Data Area and assign the start date and end date of a project and the corresponding technician number and fill in the date cells across from their name in the Schedule above.

View 6 Replies View Related

Time Scheduling: Take Out A 30 Min Break If The Hours Worked Is Over 6 Hours

Jan 13, 2009

I am making a schedule and I would like it to take out a 30 min break if the hours worked is over 6 hours.

I have so far

A B

1 11:00 7:30

=24*(B1-A1)

Gives me 8 hours, I would like it to subtract the 30 minutes only ifthe sum is over 6 and not alter the sum if it is under 6.

View 9 Replies View Related

Formula For Deleting A Formula When The Formula Has Done Its Calculation

Oct 7, 2009

I was wondering if there is a formla that will delete a formula when it has done its calculation, or stop the formula from constantly updating.

I've got a formula

=IF(COUNTA(A1)=1,TODAY(),"")

When something is typed in Cell A1 the cell with the formula will input todays date.

Is there a formula that will stop this formula from updating, as when you go into the file on a different day the date would have been updated.

View 6 Replies View Related

VBA To Read Text Formula And Related Constants And Insert As Formula Into Cell

Jul 30, 2014

I have a situation where I have to curve fit data, this can lead to different formulas being used with varying constants.

Is it possible to pickup a TEXT based formula and related constants from other cells, and then place this into another cell as a functioning formula. For Example

Cell A1 contains the formula as a text string whether it be y=a+bx+cx^2, or y=a+b/x, etc
Cells A2:A6 contain the individual constants, a, b, c, etc

I would then want the VBA to read the text based formula and put it into an output cell as a functioning excel formulae.g

In cell B10: =a+b*A10+c*A10^2

I understand picking the constants up and putting the formula should not be too much of an issue, however trying to insert the variable form of the curve fit is the part that I am struggling with, and am unsure if possible.

View 2 Replies View Related

Replace Cell References In Formula With The Header Of The Cells Referenced In Said Formula

Dec 22, 2009

Here is the scenario:
A B C D
BananasApplesOrangesTotal113=A1+B1+C1

I need to reference the formula in D1 with the cells headers names.

In a perfect world, it would take
=A1+B1+C1:

and produce:
=Bananas+Apples+Oranges

View 9 Replies View Related

Add Additional Formula To Existing Formula To Exclude Weekends And Holidays?

Mar 27, 2014

I have an existing formula in a cell linking back to a start date only. determining how to add an additional formula to exclude weekends, and possibly holidays.

View 2 Replies View Related

Concatenate Formula Nested Within IF Formula Is Not Producing Expected Results

Aug 24, 2014

I am trying to use a combination of Concatenate and IF formula to produce an email.

My input.

D4: First Name:
D5: Middle Name:
D6: Last Name:

D8: Organization:

Once all these are filled, I want the formula to produce a result like

FirstName.M.LastName@Organization.com

I have used the following formula.

[Code] .....

Problem is if there is a middle name the formula works fine, but in case where there is no middle name, it produces the following result.

FirstName..LastName@Organization.com

How do I remove the additional (.) in cases where there is no middle name.

Attached File : Email Generator.xlsx‎

View 3 Replies View Related

Vlookup Formula In VBA - Object Error (input A Formula Into A Cell)

Apr 23, 2009

I'm having some trouble trying to get excel to input a formula into a cell. I'm still a novice at VBA right now, so I don't think my problem will be too much of a brain buster.

I want a formula in Cell A6 (and I already know it correctly works) in this format: =E6&VLOOKUP(I6,'FA-Fund Data'!B$1:C$2000,2,FALSE)&J6

View 3 Replies View Related

When Dragging Formula Down The Formula Skips X Number Of Cells

Jul 22, 2014

Is it possible to write a formula that skips x number of cells and have the formula autoincrement as usual. For an examples lets say I want to skip 3 cells and I have entered in the cells listed:

A1= "1"
A2= "2"
A3= "3"

Then I type in the simple formula in the cell
B1= "=A1"

and then drag down but it skips 3 cells so then

B5= "=A2"

B9= "=A3"

If it didn't skip then
B1= "=A1"
B2= "=A2"
B3= "=A3"

this is just an example as I will be writing more complex formulas and need some thing that I can write into the formula so that it skips.

Something similar to this B1 "=A1(skip3cells)"

View 4 Replies View Related

Copy A Formula In A Cell And Then Paste Only The Text Of The Formula

Jul 16, 2007

I would like to copy a formula in a cell and then paste only the text of the formula, but I can't figure it out. Basically, I would like to avoid going into the cells and absolute referencing or hitting F2, then copying the text.

When I hit "Ctrl C" to copy the cell, then hit "Alt/E/S/F/Enter" to paste the formula, it is just like a regular copy/paste formula-wise in that the references move.

View 10 Replies View Related

Combine Formula Which Reduce The No. Of Additoanl Formula's Columns

Apr 9, 2009

I have some student marks in columns B to F. If some one get below 40 marks he fails and the subject in which he has been failed will come in Remarks column. If he has passed in all subjects remarks column will show Pass.

To bring failed subject initial in Remarks i have to create 5 additional column and then thru Concatenate i joined them.

Is There any formula to show fail subject in Remarks column without creating 5 additional columns?

View 14 Replies View Related

Add Addition If Condition To Existing Formula: Long Formula

Aug 12, 2007

This task joins a string together based on a number of characters per cell in the range.

I want to isolate one range, Col N, and add an IF condition to it.

There may be other issues preventing this from happening, e.g. the number of IF that exist in the complete formula. I will isolate the current cell and its requirements and then post the entire formula at the end for reference....

View 9 Replies View Related

Formula Arrays That Will Omit Empty Cells In My Formula

Jan 31, 2008

I am looking to average a range of cells which won't always be the same size. How do I create a formula array that will omit empty cells in my formula.

View 9 Replies View Related

Not Responding: Added A Formula To A Spreadsheet With Som Complicated Formula

Jun 1, 2006

I recently added a formula to a spreadsheet with som complicated formula. It worked ok and I saved the sheet. Now it takes 5 minutes to open the sheet and when I try to do anything,like delete the inserted column the program locks up giving a no responding message. I can do without this column if I have to.

View 4 Replies View Related

Replace Character Used In Formula Where Formula References Cell

Feb 23, 2008

I am using vlookup to get a cell value from another sheet, but if the cell has "&" or "/" I need to substitue "&" and "/" with "and" so that the cell can be added later to a url.

i am using =VLOOKUP(a1,Sheet2!A1:W17968,6) to get the value of a1 in sheet 2 and return the value of column 6

this will return "Audio Cables & Leads" but i need it to say Audio Cables and Leads

I need the formula to also check and replace "/" with "and" as well so cables/wire will be Cables and wire

View 9 Replies View Related

Adding Today Formula In A Countif Formula

Dec 19, 2012

I have a spreadsheet that contains a list of dates: What I need is a formula that will count the number of cells that hava a date more than 6 months old. I also would like the field automated so I don't have to change the date manually every day.

=COUNTIF(S5:S593,"<2012/06/18") This formula will give the correct read out, but I must change the date manually.

My attempts at adding a =today() command in place of the date result in 0 being the result (not correct)

This is what I have tried: =COUNTIF(S5:S593,"<"=TODAY()-"183")

View 8 Replies View Related







Copyrights 2005-15 www.BigResource.com, All rights reserved