Automatically Assigning Dates To Cells Minus Weekends

Feb 13, 2008

I have a spread sheet that is used to show the dates for the days in the week that my students are in class. I want it to be able to take the date from a cell that has the class start date and then show what the date will be for day 1, day 2, day 3, etc... I am not a beginner with excel but i can't figure out how to get it to skip calendar weekends.

View 9 Replies


ADVERTISEMENT

Subtracting Dates (minus Weekends)

Apr 20, 2009

I attached an excel file for an example. Basically I am calculating on time shipping, but I want don't want Saturday and Sunday to coun't against us.I need G5 to equal 3 days. Right now when I subtract E2 from F2 I get 5 days. But we only work M-F, and Saturday and Sunday shouldn't count against us. How would I subract the days automattically, so it takes out Saturday and Sunday?

View 10 Replies View Related

Calculate Hours Worked, Minus Weekends

Nov 11, 2009

to calculate how long a ticket is open in our system before being resolved. I don't want to count weekends, and if the ticket is 'suspended', I don't want to count that either. There is also the factor that the ticket 'un-suspend' date may be later than the ticket 'closed' date. Which is the bit that's throwing me.

So, I have the following fields

Ticket Open, Ticket Closed, Ticket Suspended Date, Ticket Unsuspended Date

A sample ticket might be (using above fields)

02/11/09 09/11/09 04/11/09 30/11/09

That 'should' equal two days (16 hours) as the Unsuspend date falls after the close date so it was suspended from the 4th until closure.

Now I want to know, in hours (8 hour day) how long that ticket took to resolve (i.e close), remembering you can't count the time it was suspended, or any time that fell over a weekend. Also not all tickets are suspended.

View 13 Replies View Related

Calculate End Dates Allowing For Weekends

Feb 9, 2009

If I have the start date (say February 01, 2009) and the job will take 100 working days, when will it finish if there is no work done over weekends? I assume you can use networkdays somehow but the final logic escapes me

View 2 Replies View Related

Add Worksheet With Dates As Names & No Weekends

Oct 2, 2006

Is it possible to make a macro that creates a Pop-up box that asks for date ranges and generates copies of the first worksheet in the workbook labelled as dates? There are ALWAYS 6 half terms to a school year so a 6x2 pop up box / table that is formatted in the following way will allow the appropriate date ranges to be inputted (saturdays and sundays must be excluded from this range):

Title of input box: Input School Half Term Date Ranges

******** Start Date ** End Date **
Autumn 1 03.09.06 18.09.06
Autumn 2
Spring 1
Spring 2
Summer 1
Summer 2

The macro would then create a series of sheets from 03.09.06 to 18.10.06 as well as the other 5 date ranges (excluding weekends) using the first sheet as a template. Would the user have to also input the start day for each half term or would excel 'know that 04.09.06.06 is a Monday and 18.10.06 is a Wednesday?

If the macro could create worksheets for these date ranges and clone the first worksheet in the workbook then that would save me LOADS of time copying and pasting each year.

View 9 Replies View Related

Days Between 2 Dates Excluding Weekends

May 22, 2008

how to find the number of days between 2 Dates excluding weekends and holidays using vba. I m using excel 2003. All I know is to figure out todays date using the keyword 'Date'.

Also, this is my second post and I have tried to comply with the rules regarding the title, but if it is still inappropriate and does not meet 'stating the problem' criteria,

View 3 Replies View Related

Calculating Dates Using Plus Minus Days

Oct 23, 2007

I have a static date and military time in B6 (5/10/07 18:00) I have to write various formulas to reflect 1 month (whatever calendar month it ends up in, so not necessarily 30 days) minus 7 days and then the same formula plus 7 days. How is this written?

View 9 Replies View Related

Calculate The Dates Between Two Days (excluding The Weekends)

Apr 29, 2006

I am looking for formula to calculate the dates between two days (excluding the weekends)
I am working in Saudi Arabia and the weekend days over here are thursday and Friday.

View 9 Replies View Related

Calculate Difference Between Dates Excluding Weekends

Jun 8, 2008

I wanted to calculate the difference between dates, excluding the weekends. After much thought i used =NETWORKDAYS(A1,B1)+IF(NETWORKDAYS(A1,A1)+ NETWORKDAYS(B1,B1)=2,-SIGN(NETWORKDAYS(A1,B1)),0) that seemed to be working fine. However, I had a problem today with this formula when my start day was saturday (24/05/08) and the last day was monday (26/05/08). What i want is that when i take the difference between these two days, i should get zero as answer as we are not including the weekends in calculation so the start date should ideally be the first weekday which is Monday. However, the formula is giving me 1 as an answer.

This formula works fine if i select 27/05/08 as last date in which case i get 2 as an answer which is right. In gist, what i am looking for is a formula which will give me the difference between two dates and exclude the weekends from the calculation. The last date can't be a weekend, but the start date can. Hence, whenever the start date is a weekend, the formula should take monday as a start day.

View 9 Replies View Related

Counting Days Between Two Dates Minus Holidays

Jul 6, 2012

I'm trying to count the total days between to dates but minus the fed holidays. I have a list of holidays I can ref. I like how the NETWORKDAYS function works but I need to include the weekends.

View 2 Replies View Related

Autofill Dates Excluding Bank Holidays & Weekends?

Feb 26, 2014

Is there a way to autofill dates in excel to exclude weekends and bank holidays?

View 6 Replies View Related

Auto Name Tabs With Dates Excluding Weekends And Holidays

Dec 5, 2013

I am trying to run a macro to put in the Month, Day, Year on each tab but I want it to exclude holidays and weekends. I am not a techie or anything but I would like to know how to do this. I have tried various vb codes but they don't exclude the weekends/holidays.

View 3 Replies View Related

Calculate Only Working Hours Between Two Dates Excluding Weekends

Oct 30, 2009

How should I calculate working hours between two dates? Say if start at 9/25/2009 7:26:13 PM and finish at 10/20/2009 9:46:13 AM, the function should return 245:20:00 because the working hours are from 8am to 11 PM (8 - 23), and there are weekends between the dates. Preferably the function should work like the NETWORKDAYS() function, but it should also include the time, not just the dates.

View 9 Replies View Related

Add X Days To Dates, For Criteria Count, But Skip Weekends

Feb 28, 2008

I am trying to compile a count of dates using a numerical reference which adds x consecutive dates onto the initial start date based on the number in a cell.The dates added cannot fall on a weekend.

The start date for each calculation begins in D4 with the corresponding number of days to add onto this date in K4. In the example below 8/11/2007 -- 2 means that the 8th and 9th of Nov get one added to their count. As the next row also has 9th Nov as a start date one more is added to 9th Nov. As the 10th and 11th were a weekend they are skipped and the count starts again from the next Monday. I have enclosed a simplified worksheet with some sample data.

Example:

D4 --------- K4
8/11/2007 -- 2
9/11/2007 -- 3

Expected output:

AE4---------AF4
8/11/2007 -- 1
9/11/2007 -- 2
12/11/2007 --1
13/11/2007 --1

View 5 Replies View Related

How To Find Number Of Mondays Between 2 Dates Minus Holidays

Feb 8, 2012

I have a formula to find the number of Mondays between 2 dates.

=SUMPRODUCT(--(TEXT(ROW(INDIRECT(E2&":"&F2)),"DDD")="THU"))

I now need to add in the variable of holidays and other days off. This is where I am loss. I do have a list of the weekdays that we did have class and a list of when we didn't

View 9 Replies View Related

Formula For Working Out Number Of Days Between Dates Excluding Weekends?

Aug 6, 2012

I want to create a formula that works out the number of days between two dates but excludes weekends?

View 3 Replies View Related

Difference Between 2 Dates, Incl Weekends, With Variable Work Days

Jul 11, 2006

I am creating a problem report spreadsheet for work. In col C I have a date/time that the problem started, eg, 23-Jun-2006 15:20 and in col D I have a date/time for when the problem was resolved, eg, 26-Jun-2006 15:40. I need to calculate the amount of hours that we were not available for use (due to the problem). This is based on a list of available hours. Eg, on Mondays we are available 19.5 hrs, T-F 22.5 hrs, Sa 14.5 hrs, and Sun 0 hrs.

If I do a straight subtraction, it uses 24 hrs for each day - not taking into account our available hrs. If I do NETWORKDAYS it automatically doesn't consider Sat or Sun - and i need it to - and it does have a DayEnd and DayStart but it assumes they are constants. I found the day corresponding to the date and thought I could determine the series of days between it, e.g., if the start day was Friday & the end day Monday, the series in between is Sat & Sun. Then I could do a lookup on all 4 days in a table & add them all together. But I can't figure out how to do this!

View 4 Replies View Related

Automatically Assigning Macro To Any Shape Created

Aug 14, 2014

I've got a macro that I can rund when I click on a shape. It's called "Shape_Click".

Basically, I want this macro to be automatically assigned to any shape I create, as I create it.

I know the line will be something like: [Code] ........

View 6 Replies View Related

Automatically Assigning Macro To Created Shape?

Aug 14, 2014

I have a macro that runs when I click on a shape. This macro is called "Shape_Click"

I can apply that to a shape by selecting it and manually running this macro:

[Code] .....

How do I get the subroutine to run as soon as the new shape has been selected, rather than haviong to manually run it.

Something like "Sub Worksheet_ShapeAdded" or something like that? I can't work it out.

View 2 Replies View Related

Labels In Userform Linked To Cells With Dates In A Worksheet Won't Update Automatically

Jun 2, 2014

I'm working on a workbook to track staffing patterns. I have two userforms included in my workbook. The first userform (userForm2) initiates upon opening the workbook. It's intended to allow the user to enter a date range and an office location for the report. The second userform (userform1) initiates when a command button (Weekly Summary) is clicked. I've linked texts boxes in userForm2 to cells in a hidden worksheet; this is where I'm holding the dates and office location until userform1 is initiated. I also have labels in userform1 linked to the same cells in the hidden worksheet so that when userform1 is initiated the office and date range appear at the top of userform1.

Here's the problem, when I click command button "Weekly Summary" the office location shows up perfectly however, the labels I have linked to cells in the hidden worksheet that contain dates do not update (i.e. they show the dates that were previously in those specific cells. I have to close userform1 and re-open it to get the dates to update.

I need the user to be able to choose a date range and office location when they enter the workbook. Then, I need userform1 to show the date range and office location (without having to open it, close it and re-open it) that the user chose on opening the workbook.

View 8 Replies View Related

Auto Fill Dates: The Sheet To List The Dates In A Column For Each Month Automatically

Jun 17, 2007

I have a sheet with a date and the number of months on it which will change. I need the sheet to list the dates in a column for each month automatically: e.g. Two cells contain date “jan07” and the period “10” months. The rows A1 to A10 should have jan07…jan16 listed automatically. If I change then change the number of month to 11 I would like the rows A1 to A11 to update automatically.

View 6 Replies View Related

Macro To Export And Import A Module And Assigning Different Macro Automatically

Jan 27, 2010

Macro to export and import a module and assigning different macro automatically ...

View 9 Replies View Related

Compare Two Cells But Accept Them As Equal Is One Is Plus/minus 0.1

Jun 10, 2009

I'm trying to create a formula where I can compare two cells but accept them as equal is one is plus/minus 0.1.

Example:
Cell A1 is 3, Cell A2 is 3.2, I want Cell A3 to turn red (or report "1")
Cell A1 is 3, Cell A2 is 3.1, I want Cell A3 to turn green (or report "0")

View 2 Replies View Related

Calculate Number Of Hours Between 2 Cells Excluding Weekends

Jun 2, 2014

I have a worksheet where I capture the date and time of each new entry in column A.

In the next column, it's counting up the number of hours since that entry was made. However, it's including Saturdays and Sundays in this count and I was wondering if there's a formula to calculate the number of hours excluding Saturdays and Sundays? I know that network days would count the number of working days from one date to the next, but really need hours. Is this possible?

View 3 Replies View Related

Count # Of Cells Minus Red Cells VBA

Aug 18, 2009

I have tried to figure out how to count all cells in a column and subtract any cells that contain characters with a red font. I'll attach an example. I need code that will work in VBA so that in the case that the column does not contain any cells with red numbers it won't come up with a debug error.

In excel I normally do this manually with this formula: =count("") I normally highlight all cells except the red ones. See attachment for example.

Also, the # of rows is never the same. Some files will be 100 rows, some will be 1000, depending on the store's file we get. so the code would probably have to contain something like .lastactiverow or something.

View 4 Replies View Related

Automatically Populate Dates ...

Mar 28, 2009

I've asked this similar question on another message board (the Microsoft help community), but failed to follow-up quickly enough for the support I've come here to ask for. My situation involves a spreadsheet that is used to track days worked over the course of a week. I have the days of the week listed in one row (Sun - Sat) and in the row above, a place to put the day (i.e. - 3/28). I asked for help with a macro that would allow the user to place the date into any of the cells above the days of the week, check to ensure that the corresponding day of the week is correct, and if so, populate the other remaining empty dates automatically. Below is the macro that was kindly provided. It works perfectly as long as my data is in the referenced ranges (A1:G1, etc); however, my actual data is in range L6:R6 for the dates and L7:R7 for the day of the week. (example below). I've been able to pick apart the code to understand how to change most of the macro to accept input from the different range; however, I'm unable to comprehend what I'm missing to complete the modification.

View 6 Replies View Related

Automatically Adjusting Dates

Jun 29, 2006

I am using the =today() function to places todays date in a cell...how can I get the next to cells to automatically display dates that are 2 months and 4 months later without having to change them manually every day. FWIW, this is for an certification expiration chart.

View 4 Replies View Related

Automatically Updating Dates Once They Pass?

Apr 4, 2014

setting the dates so that they update by 30 days once they have passed.

For example I need a cell that has an upcoming date to add 30 days to it once it has reached the upcoming date, so it is April 4th today, and I need it to change a cell that reads 'April 14th' to 'May 14th' once it is April 14th.

View 1 Replies View Related

Adding Weekly Dates Automatically

Mar 25, 2009

how i can automatically add a week to a start date i have in a rotas for the whole year?.

View 3 Replies View Related

Automatically Sort Due Dates As They Change?

Aug 15, 2014

I'm attempting to get a column of due dates to update automatically every time a date changes. The due dates are in B3:B15. There is a header in B3. The day after the actual due date, it is automatically changed to the same day on the next month (showing the next due date). I need the spread sheet to automatically sort the due dates from the closest due at the top, to the furthest due date from today at the bottom. Running it manually, or sorting it manually every time won't work. This is for an elderly couple who are having problems keeping track of everything each month. I just need something that will show them the upcoming bills and how soon they are due when they open the workbook. Anything other than opening the workbook is going to be too complicated. I'm new to macros. I've tried to modify some I've found in other threads, but no luck (lots of error messages). I don't understand it enough yet to figure out what I need to change. I've attached a sample sheet that shows the part of the workbook I'm having trouble with.

View 4 Replies View Related