Calculate The Variance
Feb 6, 2009
i have a dynamic list of numbers....currently 10 numbers in the list.
how can i calculate the variance?
i have the upper limit (=MIN(1,(mean+half width))
i have the lower limit (=MAX(0,mean-half width)
i have the mean (avg of all numbers)
i have the t value (TINV(alpha, (n-1)))
i have the half width (t value * SQRT of Var/N)
i just don't know how to get the VAR/N
View 9 Replies
ADVERTISEMENT
Nov 25, 2013
I am looking to calculate variance across a large data set and would like to know if a macro is possible to calculate for a specific unique cell ID. East, Central, or West and calculate variance across that region.
For instance, in my data set if I have something similar to below. How would I calculate variance in the different regions? Is it possible to automate this process? Also could the Analysis ToolPAk be used instead or in conjunction?
OrderDate
Region
Rep
Item
[Code]....
View 4 Replies
View Related
Mar 29, 2007
what is the formula to calculate variance in Excel between the actual data and the forecasted one?
View 9 Replies
View Related
Apr 2, 2008
Column A has a time (no date)
Column B VLooks-up a value from a separate sheet per country, so it pulls through a the variance [-11 to +13] from UTC (GMT) time dependent on country.
All other data is irrelevant.
Let's say Column C has following formula: A2+B2/24.
This works where the time result (new time) is on the same day, but as soon as it crosses over midnight, it buggers up.
What I'm needing to do is take a list of events (server time/GMT) and convert them to the local time from where the event was triggered based on source country.
View 9 Replies
View Related
Apr 16, 2014
I am trying to get my variance percentage to calculate correctly but I am struggling when it comes to one of the value being zero. It works fine for the below example when both the variance and last year figures a zero.
Last Year This Year Variance Percetage
0 0 0 0.00% IF(Last Year=0, "",Variance/Last Year)
0 100 100 0.00% This should be 100%
View 6 Replies
View Related
Jan 26, 2009
I'm trying to calculate the variance between planned date & time of arrival vs actual date & time of arrival.
I attach the workbook as am a bit useless at explaining myself....
What I've done is in H14 subtract the actual date of arrival (F14) from planned date of arrival (C14). This result is the only way I could think of dealing with crossing over midnight. As a result I14 should subtract the actual time of arrival (E14) from planned time of arrival (B14):
=SUM(E14-B14,H14)
This method works well when the arrival was later than expected but doesn't work if the arrival was sooner than expected.
View 6 Replies
View Related
May 18, 2009
finding a way to compare the two budgets i.e 08/09 and 09/10 and if a new cost centre appears in 09/10 it will bring a yes in column G(New cc) and if the Cost Centre already exist in 08/09 it will bring a blank--but in both cases i want a variance in the next column H i.e 09/10 less 08/09.
View 2 Replies
View Related
Apr 8, 2013
How to create like a random number generator or something. So like +.09 is 57% and -1 is 43% and for it to randomly generate like 100 numbers, so that I could graph it later.
View 5 Replies
View Related
Feb 21, 2007
I have a workfile with several worksheets.
I have the word "variance" appearing in some of the rows in column B and a value in column C which is in the same row as the word "variance"
for eg row B19 Variance C19 10
I need VBA code that where the value which is in line with the text "Variance" is greater than 5, the name of the worksheet is listed in the worksheet named "Variances"
See Example below
******** ******************** ************************************************************************>Microsoft Excel - Statistical Data.xls___Running: xl2002 XP : OS = Windows XP (F)ile (E)dit (V)iew (I)nsert (O)ptions (T)ools (D)ata (W)indow (H)elp (A)boutC13C14C16C18=
ABCD131110XFORD*UNITS*IN*STOCK86*141111XMazda*N/V*UNITS*IN*STOCK17*15****16Total*103*17****18*Variance0*East*
[HtmlMaker 2.42] To see the formula in the cells just click on the cells hyperlink or click the Name box
PLEASE DO NOT QUOTE THIS TABLE IMAGE ON SAME PAGE! OTHEWISE, ERROR OF JavaScript OCCUR.
View 9 Replies
View Related
Sep 1, 2008
I need a formula to workout what is the most up to date firmware that should be installed on the machine. This will always be in column B. The second formula should work out the variance between the installed firmware and recomended. The formula cells will be normally held on a different summary sheet.
View 2 Replies
View Related
Mar 16, 2014
I am trying to do my homework for college and the below excel grid was given to us to complete. I do not understand where to get the information it is asking. the first grid is the numbers we are suppose to use to input in the other grids. We are suppose to put a formula in on the last to two columns on each grid but I do not even know where to start.
Budget
Actual
Product
SaleUnits
$/Unit
View 7 Replies
View Related
Jan 6, 2014
3 Sheet Excel document- What i'm trying to do is compare the contents of Column A sheet2, with Column J sheet3.
I would like only the variances printed on Sheet A. So- Sheet A says "The following was found in Sheet2!A, but not Sheet3!J"
Demo excel spreadsheet attached. Comparing "NASC Column A" with "RQ4 Column J"
View 4 Replies
View Related
Jun 1, 2007
I need to sum up the batch quantities for a date with variance one...
but it doesn't work... I suspect that I'm using wrong formula, it should be not SUMPRODUCT...
when I tried to use just SUM, it adds all the quantities in the colomn.
=SUMPRODUCT(--(($AB$11:$AB$100)=AK12),--($AG$11:$AG$100=1),($AD$11:$AD$100))
View 9 Replies
View Related
Feb 22, 2010
I need a formula that will display a 'yes' or 'no' if the following condition is met:
If the value of cell (L17) is greater than 10% positive variance, then 'YES' else 'NO'.
Currently the value of L17 is 14%, therefore should be a 'YES', however how can I get the following to work:
IF(AND(L17=<0,"NO",L17>10%,"YES"))
I apologise as I know there are too many arguements here but is there a way around this?
View 8 Replies
View Related
Apr 8, 2007
formula to work out a variance between two times
Using the 24hr time format in cell a1 i have a start time of 10:43 and in cell b1
i have an estimated time i think a job should take in this case 30 minutes and in cell c1 i have the actual time that job was finished in this case 11:07 and in cell d1 i have a variance between the two times which in this case would be saving me 6 minutes
View 9 Replies
View Related
Aug 29, 2008
I have two columns in a payment schedule (which adjusts according to certain user inputs) that I need to use in my NPV calculation.
The first column is the Total Payment and the second is Inducements.
Therefore each value in the NPV calc. needs to be the sum of a given period's payment and inducement (but i don't want/have a separate column which calculates the sums). The number of periods adjusts with the users input of Term. There also may be periods where there is a payment but no inducement.
View 14 Replies
View Related
Dec 22, 2011
The formula below calculates between rows 2 and 109. How can I change it to calculate between row 2 and the last used row in the sheet.
Code:
Range("D2").Select
ActiveCell.FormulaR1C1 = _
"=(RC[-1]-MIN(R1C[-1]:R109C[-1]))/(MAX(R1C[-1]:R109C[-1])-MIN(R1C[-1]:R109C[-1]))"
View 2 Replies
View Related
Jan 10, 2007
i got a problem to calculate IRR and NPV for my company cash flow. i so confuse how to calculate cos the initial investment (expense) is pay in installment by yearly basis. i hope anyone can help me to solve this problem.
I m not sure whether what i'm doing is correct or not. thanx
http://spreadsheets.google.com/ccc?k...Hd2JSrIj7H-Pew
View 9 Replies
View Related
Feb 17, 2007
If I have this serie of values in the A column:
34
33
33
33
30
29
26
26
20
19
17
17
And want this results in the B column:
1
3
3
3
1
1
2
2
1
1
2
2
Those numbers will indicate how many of the same are in a row.
What's the easiest way to accomplish this?
View 7 Replies
View Related
May 13, 2009
to calculate the age from the format date of birth shown below.
SQL Data S1Date of Birth2Jun 9 1947 12:00AM3Jan 1 1957 12:00AM4Jan 1 1958 12:00AM5Jan 1 1956 12:00AM6Jun 4 1951 12:00AM7Dec 10 1963 12:00AM8Jun 17 1958 12:00AM Excel tables to the web >> Excel Jeanie HTML 4
View 9 Replies
View Related
Feb 24, 2010
I am trying to call a sub calculate but I keep getting errors, is calculate a reserved sub name?
View 9 Replies
View Related
Feb 18, 2008
building a spreadsheet. I have the total price in cell f6. In cell C6 I need price with no taxes. D6 should be the pst of 8% and E6 should be the gst of 5%.
View 3 Replies
View Related
May 6, 2013
Formula to calculate GST? I have a Non-capital and a Capital column, then a Claimable GST column.
I currently have '=SUM(E5/11)' in the Claimable GST column (G5).
If E5 is a zero value I need the sum of F5/11 in G5.
View 2 Replies
View Related
May 16, 2014
I have the following scenario on the attached worksheet: I need b45 to say 0% if b42 and b43 are left blank.
View 3 Replies
View Related
Jun 21, 2014
I have a simple issue i cannot figure out how to write a formula for.
In A2 i have the number of operations.
In A4 i have the percentage of CPU usage it requires to complete those operations.
I need an output somewhere that will tell me how may operations I can get per 0.1% of CPU usage.
View 5 Replies
View Related
Jul 24, 2014
I'm trying to automate the attached schedule so that the formulas in H stop increasing once the amount in column J equals zero. So far everything I've tried either gives me a circular reference error or ends up giving me the same result as if I depreciated the asset an additional month.
View 3 Replies
View Related
Feb 22, 2014
I need to calculate a TAT formula for the below case
P1 -- 1 Hour
P2 -- 2 Hour
P3 -- 4 Hour
P4 -- 8 Hour
Shift Start time : 6:30pm
Shift End Time : 3:30am
Suppose a request comes at 9:30pm and it is Priority 1 (P1) then it should be completed at 9:30pm + 1 hour = 10:30pm. I have given the below formula to execute this
=IF(A2="P1",1,IF(A2="P2",2,IF(A2="P3",4,IF(A2="P4",8,0))))
=B2+(TIME(D2,0,0))
The problem here is if the request is P4 then its 8 hr TAT and the formula will calculate the time as 5:30am. Since the shift time end at 3:30am itself the actual TAT should be the next day 8:30pm.
formula to calculate the TAT which includes the start time and end time and also excludes the weekends and holidays.
View 14 Replies
View Related
Sep 5, 2008
I am trying to formulate a formula that will calculate overtime hours worked.
Now standard hours are 17:30pm - 20:45pm. Anything outside these hours are overtime. If the start time is 18:00pm then the person is still paid from 17:30pm @ standard rate regardless.
Now I am trying to work out a formula that will cover hrs outside of the standard hrs AND hrs unworked but paid for.
see attached! September tab {blue highlighted cells}
View 9 Replies
View Related
Feb 23, 2009
Is there a formula for calculating date for every 2nd thursday of the month excluding holidays?
View 4 Replies
View Related
May 14, 2009
Just wanted to find out if the formulas in the attached apreadsheet are correct. Formulas from E6 to E10.
Also, if you multiply the "new daily target" with "working days" should'nt this give you the "remaining" figure? Currently it's not doing this
View 11 Replies
View Related