Color Format Odd Days From Dates
Oct 25, 2006
I am trying to use Options>View - Zero Values.", "style="background: #FFFFFF;padding: 2px;font-size: 10px;width: 550px;"");' onmouseout='GAL_hidepopup();'>formatting.htm" target="_blank">Conditional Formatting to change the cell color based on wether the content is an even number or an odd number. Actually it is an even or odd date but I figure that it will read the date as it's serial number and that would be a number. I thought I would use something like "Formula is: =MOD(VALUE,2)" but I can't get it to work. I'd like to be able to do this without using the Analysis Toolpack. Even though ISEVEN seems like it might be a good solution.
View 7 Replies
ADVERTISEMENT
Feb 16, 2007
I have a Timesheet where I am trying to get Saturday and Sunday to auto fill with a certain color whenever the month is changed. The spreadsheet is setup so that if the month is changed in a specified cell, then the dates of that month auto fill down a specified column. I would like Saturday's and Sunday's to be a certain color without having to manually color fill them every time the month is changed.
Is there a formula or macro for this. I have tried setting up conditional formatting but I don't know how to get the color to follow Sat&Sun. I have attached the spreadsheet.
View 4 Replies
View Related
Jun 11, 2014
I have spent too many hours Googling and trial with mostly error in attempting this. I formatted the very first cell A1 for today's date =TODAY(); this is also dirrectly above the column with all the dates in it. I just want an entire row's contents to turn red if it is 15 days old or older. This =$A1<TODAY()-15 somewhat works, but it only turns the date cell red, not the whole row. It also makes blank cells turns red, which I would like to remain blank (another formula is needed I imagine).
View 3 Replies
View Related
Feb 13, 2013
I wanted to determine the number of days between two dates. Specifically, if the initial date is in one month, and the second is in a different month and an output would result a number of days in each month until the final date. BUT I have a large amount of data to do this for in a list view, way to put a formula in excel and just drag down the entire list to get the required information. see below for an example.
The result I'm looking for is the separate the months and only show the relevant months between the two dates in one cell or the adjacent. Something similar to the table outlined below.
Input Data
Result
Start Date
[Code]....
View 3 Replies
View Related
May 22, 2006
Does excel contain a format of just : "number of days"??
For example : I have 3 cells
A1 : should contain the number 30 (30 days)
A2 : should contain a date with this format (jj/mm/aaaa hh:mm)
A3 : should contain A1+A2
View 3 Replies
View Related
Feb 23, 2014
Here is my set up:
A2 to BF2 is a range of dates
A3 to BF3 are sales. Days without sales are 0.00
I want to pick a range of dates and find the number of days without sales between those dates. So, a formula that will look to a start date in A1 and an end date in B2, and then count the number of days that did not have sales between. Index/Match/Countif/Dateif I can't seem to make anything work.
View 3 Replies
View Related
Jan 15, 2009
Today I am having a very annoying problem that really has me stumped – I need to work out the lag between a Due Date and Delivered Date
But as people sometimes manage to deliver on the Due Date it needs to show a zero (as in they got it in on time) but using the formula below the result is a 1 and I want a zero
Can anyone help me please? I have tried putting assorted -1s in to the formula and it looks like it might work until I copy down and find that if a person delivered one day early the result shows -3 for example!
View 7 Replies
View Related
May 14, 2009
Hi Guys, This has been bugging me for a bit now and I just can't sus it...
I have a sample perpetual calender that I have been modifying to fit my own purpose. The calender part works fine.
I have beside that a column for holidays, etc and then a another column for other events.
When I put the date in the holiday or events columns I would like the date to be highlighted in the calender above (different colour depending on which column it came from).
The formula I have been playing with (no success) is:
=MATCH(DATE($R$2,1,C8),$I$41:$I$65,0) - This is the Formula for the 1st column of dates.
The 2nd formula is similar, just changes the column it tries to draw the MATCH(DATE.... from...
Although this formula works fine on the sample spreadsheet. When I enter the formula on my sheet, it doesn't seem to work...
I have attached the spread sheet that I am working on.
View 2 Replies
View Related
Apr 4, 2008
there are a multitude of issues with US date formats when you're not in the US but I've run across one that I can't figure out.
I have a source table that has approx 5000 lines on it, everything looks correct and all the dates are in the correct (Australian) format. However when I use it to make a pivot table, any dates that are before the 12/m/yyyy gets changed to the mmddyyyy format in the pivot table only, all the source dates are still correct.
View 3 Replies
View Related
Jun 16, 2008
I have been using: =DATEDIF(A1,B1,"md") & " days" to calculate the difference, in days, between two dates in a speadsheet, however, the number of formulae in the spreadsheet now is cumbersome so I'm trying to put it together in VB.
View 2 Replies
View Related
Dec 5, 2013
I have flowing cells in excel:
1
2
3
4
5
6
7
8
9
10
11
12
First row are months (number representing specific month). I would like use conditional formating and color cell below month if that cell is empty and if it is more that 15th of that month.
To be more specific. If we look at last column (since we are already in december). Since today is 04 december the cell below "12" should remain uncolored. But when the date will be 16th of december I want that cell to color orange. Since it is blank. But if there would be a number in it, cell should remain blank even after 16th of december.
View 9 Replies
View Related
Jan 19, 2010
I have this SS that uses conditional formatting to color days in a calendar, dates are entered in columns B & C when the dates are entered then the days of the month highlight. Everything works great but I can not get the conditional formatting to work in column E. Column E would be January 1. If I enter Jan 1 in column B & Jan 30 in column C all the days highlight except Jan 1? I have uploaded the SS.
View 3 Replies
View Related
May 23, 2014
I have a some dates in a format which are not being converted into the normal date format. So i made this formula to convert it into the normal date format:
=IF(LEN(B218)=10,(MID(B218,4,2)&"/"&LEFT(B218,2)&"/"&RIGHT(B218,4))+0,IF(LEN(B218)=9,(MID(B218,3,2)&"/"&LEFT(B218,1)&"/"&RIGHT(B218,4))+0,IF(LEN(B218)=8,(MID(B218,3,1)&"/"&LEFT(B218,1)&"/"&RIGHT(B218,4))+0,"")))
Formula is working fine except on this type of date "9/9/2013"..i also tried an OR formula with mid but didnt get the desired result.These are the type of dates:
12/10/2013
12/9/2013
9/11/2013
9/9/2013
7/25/2013
View 9 Replies
View Related
Jun 4, 2014
So, it is for a hotel, I need to know to know between a Check-in and a check-out date, each day (monday, saturday) there is. In depending it is for one night or 12.. I will try to be clear: Depending on the channel of booking and the day of week we have a % of commission different. so I want to put the price in one cell and it is calculate for each date in order at the end I have the right net profit (because the right commission has been applied). Of course to complicate the commissions do not apply in the same order depending the channel and there are fixed costs which are count one time or repeat by the amount of nights. For the these things what i did seems work.
After, my boss would like to link the dates with another excel file which say for each date which "level of price" (price point) is applied and function of this Price Point we have the price applied per room type and offer
But for now, I didn't find anything what can say to me between 2 dates what dates are between...
View 2 Replies
View Related
Jun 18, 2014
How to find the difference between 2 dates in days ,eg,12/10/14 and 14/10/14 = 2 days on a spreadsheet.
View 4 Replies
View Related
Oct 9, 2007
a count formula.
Right, Column A on my sheet is the date that the work was completed. First thing is I need to be able to count how much work was completed per month. (I dont know why we have it all in one big sheet rather than monthly sheets but thats too logical!)
Secondly, column I is the number of days that piece of work took to complete. I need to be able to have a formula that looks at the month the work was completed, then total up the number of days that the work took.
(Example, if I have three bit of work completed in October, 1 took a total of 20 days, 1 took 15 and 1 took 10 it would = 45 days)
I know that this should be possible as I've had Excel doing more complex formulas than this.
View 14 Replies
View Related
May 24, 2007
I have a start date (say 01/04/07) and I need to add a number of days to it to get the start of the next financial period. Unfortunately, I need to ignore a small list of dates (bank holidays, etc).
View 9 Replies
View Related
Nov 10, 2008
I am trying to set up a function to derive a number of days between 2 dates.
Within the table I have an on hire date, and off hire date, and an optional suspend hire date range in 2 other columns - ie. there are 4 columns with dates in.
On hire is in column B; offhire in C; suspend hire in G and recommence hire in H. The optional suspend hire date range will always fall within the main hire date range.
Column I calculates the number of days for the suspend hire period.
My key cut off date is in cell C4.
There are 3 different scenarios I need the function to cover.
1 - if the cut-off date (in C4) is later than recommence hire, calculate the number of days from hire start to cut-off date, less suspend hire period days.
2 - if the cut-off date (in C4) falls within the suspend hire period, calculate the number of days from the hire start to the begining of the suspend hire period.
3 - if the cut-off date (in C4) falls before the suspend hire period, calculate the number of days from the hire start to the cut-off date.
This is the fuction I have written:-
=IF($C$4>H10*($C$4-B10-I10),
IF(AND($C$4>G10,$C$4
View 9 Replies
View Related
Apr 8, 2009
I have a formula in column E: =NOW() for the date.
I need a Formula in Column H from H11:H300 such that:
i) when a date is entered in G11 the number in Cell H11 should be a difference between G11 and D11 as in rows 11, 13, &14 and
ii) Until a date is entered in cell G11 the difference should be between E11 and D11 as in ROW 12
Below is an example of what I want.
D E F G H8 Date Days9DateStatus as of Expected ActualTOTAL10out of order8-Aprin orderin order114-Mar8-Apr14-Mar101210-Mar8-Apr29134-Mar8-Apr6-Apr33141-Mar8-Apr31-Mar30
View 9 Replies
View Related
Apr 13, 2007
vba excel?
I wish to calculate the days between the starting date (column A) and ending date (column B). For the first 7 days are excluding all the holiday and weekend and the rest of it until the ending date are counted.
View 9 Replies
View Related
Jul 3, 2007
I couldn't find a solution to my problem in the forum: Is there are formula that will allow me to calculate number of days between two dates? The date format is eg. 07/06/07
View 3 Replies
View Related
Jul 25, 2007
I have a simple formula to work out the number of dates between to dates
ie: =U6-T6
This works out the days between 9 may and the 31may as 22 days
but i want to show the correct number of days including the 9may so this would be 23 days.
I tried this =U6-T6+1 which was fine but all the empty cells now show the value 1 in them.
View 5 Replies
View Related
Aug 20, 2007
I am trying to create a spread sheet in excel that will show a number of days past due counting from the due dates. see the attached xls file for details.
View 5 Replies
View Related
Sep 6, 2007
I am trying to count the number of dates in a column that are within the last 180 days. I tried using COUNTIF and it did not work. Formula which I thought should work: =COUNTIF(A3:A32,>(A40)). My workaround is shown in Column B, but this method adds one column for each participant.
View 5 Replies
View Related
Mar 2, 2008
I currently have a sheet that shows monthly tasks and their due dates. There is also a control that when clicked, resets the due date to the following month of the same day.
What I would like to do is setup some type of reminder such as either flash the due date cell if possible or change the fill color. It should do this when the system date is = to or 4 days before the due date.
The only way I can see doing this is using VBA, which I do not know very well.
View 3 Replies
View Related
Jul 29, 2014
I am trying to calculate the number of days between two dates where the arrival date is in b5 and the departure date is in c5 for each month. I have been using the following formula =IF($C5="","",MAX(0,MIN(L$1,$C5)-MAX(K$1,$B5))) but when the stay is a full year it is giving me 365 in a single column. I think maybe I need to add in the number of days in the month but not sure how to do it.
View 2 Replies
View Related
Apr 17, 2014
I have attached a workbook for example, the dates im looking to find difference between is marked in yellow...Need result in column E, would be nice with a formula you can just drag down...
Tried doing this myself, but the dates have weird formatting in these documents, so not sure how to deal with it.
View 9 Replies
View Related
Oct 10, 2007
I'm currently working on a file that has employee holidays/sickness etc. What I want to do is be able to see is a DATE FROM and DATE TO and next to it the total amount of working days between and including those dates. On top of the since employee's sometimes like to take half days I need it so that it can determine half days as well.
So for example I have an employee going to be off work from 29/10/2007 until 09/11/2007 12pm which is 10.5 days in total, but that includes weekends when I don't want it to.
Also it comes out as 11 days at the moment because I can't figure out how to get it to determine is it is half a day.
What formula should I use or if someone could create an example that would be really usefull :D
View 12 Replies
View Related
Nov 21, 2008
I need to calculate the number of days between a string of dates in Column A. There will be blank cells in between the dates and I need to ignore those blank cells. I'm trying to use this formula: =DATEDIF(A13,A15,"d") but it returns an error with a blank cell in the string.
View 4 Replies
View Related
Mar 17, 2009
I have a question, does anyone now how to count between dates, for exemple :
01-02-2009
15-02-2009
22-02-2009
25-02-2009
03-03-2009
11-03-2009
And i wont only to count between 01-02-2009 / 28-02-2009, the result it will be 4.
View 14 Replies
View Related