Compare 2 Dates Using Networkdays, Assuming Both Column A & B Are Filled
Apr 20, 2006
I have a spreadsheet that captures task start and end dates similar to project. It currently calculates Networkdays correctly, so if you have:
1. 1/1/06 - 1/31/06 (22 Days)
2. 1/1/06 - 12/1/05 (- 22 Days - showing dates have been entered incorrectly.)
3. 1/1/06 - No End Date (-27655)
=IF(ISERROR(NETWORKDAYS(E23,F23)),"NA",NETWORKDAYS(E23,F23))
My concern is with #3, is there a way to instruct the formula that if columna and columb are not filled in,the result should be blank. Previously I had it where it indicated NA - but the problem with this is - while it appears fine in Excel, when I pull it into Access to report on I get the -27655. This is throwing my reporting off.
View 2 Replies
ADVERTISEMENT
Jan 13, 2009
I can calculate the networkdays between two dates but how do I project a finishing date if I know the starting date, the holidays, and the duration of the task in working days? (Sample sheet attached, working in Excel 2003).
View 2 Replies
View Related
May 5, 2014
I want to make a little chart for easy reference that tells me due dates for projects, based on estimated completion times.
I'm already using NETWORKDAYS to find the amount of working days between today and a due date, but I want to flip the formula around, and I'm having trouble getting the syntax right.
For example, column A reads:
0
1
2
3
5
7
10
15
20
Estimated completion times for various projects.
So I want column B to read the date that this would render. A1, value 0, would always produce today's date for B1. B2 would always read one business day into the future, B3 would read as 2 business days into the future, B4 as 3 business days into the future. Does that make sense, and B5 as 5 bd into future.
View 2 Replies
View Related
Apr 19, 2006
I have employees that have different number of business days they work. I
need to be able to calculate when the employee has utilized a specific number
of business days specific to the days of the week they work and the number of
days per week work. For example, if I have an employee that works 3 business
days per week (Specifically M, W, and F), and I need to know the date this
employee worked a total of 30 business days, is there a way to calcuate this
date (which should be 6/9/06 if we use a start date of 4/3/06.
View 9 Replies
View Related
Aug 10, 2006
I have 3 columns of dates (A1, B1, C1).
Several different scenarios:
1. If A1 is blank, but B1 & C1 are populated, I want to put the result in
D1.
2. If B1 is blank, but A1 & C1 are populated, I want to put the result in
D1.
3. If C1 is blank, but A1 & B1 are populated, I want to put the result in
D1.
4. If A1 & B1 are blank, I want to put "N/A" in D1.
5. If A1 & C1 are blank, I want to put "N/A" in D1.
6. If B1 & C1 are blank, I want to put "N/A" in D1.
Why are there 3 date fields you ask, the powers that be want it that way,
View 14 Replies
View Related
Oct 15, 2008
Hmmmm. Looks like I ruined my original posting while trying to mark it solved.
View 14 Replies
View Related
May 5, 2009
I have a job tracker program that daddylonglegs helped me with a few days ago. I thought I would be able figure this out on my own but failed. I've attached the file to help show what I need. I know the final ship date of a project. Sometimes my projects need to go out for teflon coating.
I need Networkdays to give me a TO TEFLON date that is 5 days before the final ship date and factor in weekends and holidays.
View 2 Replies
View Related
Dec 10, 2013
I am trying to find a formula that will return the number of week days between two dates. My specific situation is that my job sets up work orders (WO) to be completed by our staff. We have 3 dates - the date the WO was created, the date the WO is due to be completed, and the date the WO was actually completed.
I would like to subtract the Complete date from the Due date. Generally, this should always equal zero because our staff should be completing WOs on the due date! But obviously that doesn't always happen. There are times that they complete them late, and times they complete them early (yay!).
The problem with NETWORKDAYS is that even when they are completed on time, the result is 1. This formula counts instead of subtracts. I adjusted the formula to =NETWORKDAYS(A3,A4)-1 which works fine for those WOs completed on time or completed late. But for those completed early, it adds (or subtracts, really) 2 days. So for a WO completed a day early, instead of it showing -1, it shows -3. I've attached an example of WOs and the NETWORKDAYS formula I've used so you can see.
Subtract Days.xls
I'm really looking for something that will subtract week days, not count them.
View 3 Replies
View Related
May 21, 2008
I am trying to do a macro that looks to see if the date is different from one cell to another going down in rows. I got it to work until the cell is empty then it says the date dont match but I just want it to stop the loop. so it should go down a list check to see if the date is the same all the way down the list, stopping if cell is blank, if not give a message box, if it is the same stop.
Is As follows
Dim rowNum As Integer, colNum As Integer, currCell As Range
rowNum = ActiveCell.Row
colNum = ActiveCell.Column
rowNum = rowNum + 1
'get first cell
Set currCell = ActiveSheet.Cells(2, 3)
'loop while cell not empty
Do Until currCell.Value = " "
If currCell.Value = ActiveSheet.Cells(2, 3) Then
If currCell.Value = "" Then
End If
View 4 Replies
View Related
Sep 19, 2007
Excel 2003.
Cell A1 = "Opened"
Cell B1 = "Sent to DoN"
Column A = named range Opened
Column B = named range Sent_to_Don
Cell A2 = 8/30/07
Cell B2 = 9/7/07
Columns A & B formatted as date in display format mm/dd/yy
Cell C2 =NETWORKDAYS(A2,B2) Display is 7
Cell D2 =NETWORKSDAYS(Opened,Sent_to_DoN) Display is #NUM
Cell E2 =(Sent_to_DoN-Opened) Display is 8
How to fix the #NUM error?
View 9 Replies
View Related
Jun 20, 2008
For instance:
The values of column C are dependent on the cell D1.
SUM(C1:C50) with the condition that D1 has the value 30
SUM(C1:C50) with the condition that D1 has the value 50
SUM(C1:C50) with the condition that D1 has the value 70
Is it possible to assume these values for D1, so that all of the cells in column C are calculated in accordance with it, before column C is summed up?
View 14 Replies
View Related
Apr 24, 2009
I think I am working all around this in Excel 2003 and feel like I am in the neighborhood, but can't seem to quite get there. On sheet1 I have 2 columns of 100s of rows. All of the cells in column A will be filled in with a date as time goes by (1-May-09 for example). Several of them may be 1-May-09 as a matter of fact. In column B, some of the cells will have a number in them and some of them will be empty. On sheet2, I want to construct a formula that returns a count of cells in column B that have a number in them based on a specific date in column A. For example:
AB
1-May
1-May777
1-May
1-May
1-May
2-May999
3-May
2-May
1-May
2-May111
1-May
If I could get the formula right, it would return an answer of 1 for 1-May in the example, because only 1 of the 1-May entries in column A has a number in the adjacent cell in column B. A formula for 2-May would return an answer of 2 since only 2 of the 2-May entries in column A have numbers in the adjacent cell in column B, and so on for the month. If I understand things right, there are too many arguments for COUNTIF. It seems that SUMPRODUCT should work, but I can't make it so.
View 2 Replies
View Related
Mar 23, 2007
I am trying to put together a spreadhseet that will calculate the future cost of education fee assuming a given inflation rate. I would like the reuslt to be highlihted in a list or a table. The user would only need input current fee, inflation rate and years where fees are payable. The spreadsheet would do the rest. I have laid this our best I can attached.
View 5 Replies
View Related
Feb 14, 2013
Right now the code below reference AI on sheet BOM. However, I need it to be either referenced by being the last filled row on sheet BOM or by having the word "rounded" on row 4 --what which over column on row 4 that has the word "rounded".
Current code:
Range("J2").Select If Sheets("BOM").Range("C4") = "" Then
ActiveCell.FormulaR1C1 = "=BOM!R[3]C[25]"
Else
ActiveCell.FormulaR1C1 = "=BOM!R[4]C[25]"
End If
View 1 Replies
View Related
Jul 17, 2014
Currently, I have a standard vlookup forumla that looks like =Vlookup(B2,Sheet2!A:G,5,false)
However, the data on sheet two is ever expanding--each month, specifically. And I need to return the most recent (so, rightmost filled) column. Right now, the column is 5, but next month it will be 6 and so on and so forth.
View 7 Replies
View Related
Jul 23, 2014
I have two columns that are the same field, both Middle Name. The first column does not have every single row filled and the second column has every row the first column does not have and vice versa. I want to merge them to one filled column.
View 2 Replies
View Related
Jan 15, 2009
Is there any way to a column be filled automatically by what is written on others columns.
Example: If one of the cells A2 or B2 and C2 are Nonblank, fills automatically the cell H2 with "ABC2" And If some of the cells D2 and E2 are Nonblank fills the cell H2 with "DE2"
View 2 Replies
View Related
Sep 18, 2013
I have a column in excel sheet of more than 1000 different names. I want to add S/o with each name how can I do that ?
View 4 Replies
View Related
Oct 29, 2013
I created a lab result page for long term patients. thus, they may have 1 to 1000 lab results. so i need to create an infinite print range, but just printing the filled ones.
Right after column J, print 2nd page if filled, if not, dont. And printing A1:J6 to every page is a good solution to not to lose data in long term.
[URL]
View 3 Replies
View Related
Jan 7, 2014
I would like to figure out a formula that will calculate what percentage of a column is filled based on the total number of rows.
For instance if I have Column K and that will have delayed savings by sales pursuit, I want to be able to calculate the percentage of what is being delayed from a total number of pursuits (basically the count of rows in column A). Ideally this would be a dynamic range (offset).
Ex. Say I have 25 rows in column A, but I only have 2 rows in column K filled. How can I calculate that there is a 8% (2/25) delay?
View 2 Replies
View Related
May 4, 2009
Is there any formula or macro that can be used to detect the value of the last filled in cell in a column or row? For example, I fill in column B each day with a new numerical variable, so on day one B1 = 100, on day 2 B2 = 200, on day 3 B3 = 150 and so on. I would like the last variable entered in column B to appear in, for example, cell A1. Is there any way to do that?
View 9 Replies
View Related
Apr 15, 2009
I have to convert a excel workbook I have into a csv for import into a database. The workbook contains multiple worksheets that are named individually. What I would like to do is get a way or code to add a column to the beginning of each worksheet and then populate each cell of that new column (column A) with the name of the worksheet (of course only up to the range of the data). I already have a macro that can copy and consolidate the contents of all the sheets into a single sheet.
View 2 Replies
View Related
Jul 15, 2006
I have written several pieces of VBA code which produce a sequence of tables on a single worksheet (with the rather original title "Tables"). The code often adds tables to the end of the current set of tables, and to do this, I need to know where the next available space is.
I have a solution which I have been using for ages now, which checks each cell in an appropriate column until a sequence of 3 blank cells has been found as I can guarentee that the tables are at most 2 cells apart. It then sets i=i-3 to give me the location of the first empty cell.
Blankcount = 0
i = 3
While Blankcount < 3
If Cells(i, 3) = "" Then
Blankcount = Blankcount + 1
Else
Blankcount = 0
End If
i = i + 1
Wend
i = i - 3
View 2 Replies
View Related
Aug 22, 2006
My is updated very frequently and i just wonder if it is possible to display the last filled cell of a certain column in another cell.
Imagine column B (B5:B1253) is filled with average sales values by using formula "B$5:B5" and i want to display the most uptodate average value in cell B1.
View 3 Replies
View Related
Mar 15, 2007
I need a formula or macro to fill a cell with the last entry in a given column.
Anyone have any advice?
View 9 Replies
View Related
Jun 20, 2008
I want a macro to be able to select & highlight (ready for copy/paste) all cells in the column range "A2" to the last populated cell in column A.
View 3 Replies
View Related
Dec 19, 2012
I have this data lets say id denotes a particular house and the multiple entries of the same house are for different members of a house. Now i want to calculate the total no of people who earn in a particular household i.e if a cell is filled or not.
idB C
00118000040000
001
001
001
002170000
[code].....
View 2 Replies
View Related
Oct 28, 2013
I just had an employee come to me and ask to take a look at his Excel spreadsheet. One of the columns auto filled the word General all the way down. I tried to do a find and replace but it did not work. Then I tried to just delete the cell and noticed that the text disappears when you click into the cell. This "ghost" text is frustrating me and I can not get it removed
View 1 Replies
View Related
Dec 1, 2007
I did find information from other posts but with my mininal knowledge of VBA, I am not able to apply the macros for my need. I have an order form. Row 1 to 10 contain personal information. Column A is the "quantity" and Column E is the " total" with a formula. If cell of column E is filled (contain the $ amount), I want the whole row copied to another sheet. I also want row 1 to 10 to copy to the other sheet as well.
View 3 Replies
View Related
Aug 15, 2009
A column (A1:A60) is being progressively filled in with numbers, and occasionally some blank cells are between.
I need a formula to work out the number of the remaining cells (that are yet to be filled in) from the last entry till the last cell (A60) of the column.