I can calculate the networkdays between two dates but how do I project a finishing date if I know the starting date, the holidays, and the duration of the task in working days? (Sample sheet attached, working in Excel 2003).
I want to make a little chart for easy reference that tells me due dates for projects, based on estimated completion times.
I'm already using NETWORKDAYS to find the amount of working days between today and a due date, but I want to flip the formula around, and I'm having trouble getting the syntax right.
For example, column A reads:
0 1 2 3 5 7 10 15 20
Estimated completion times for various projects.
So I want column B to read the date that this would render. A1, value 0, would always produce today's date for B1. B2 would always read one business day into the future, B3 would read as 2 business days into the future, B4 as 3 business days into the future. Does that make sense, and B5 as 5 bd into future.
I have employees that have different number of business days they work. I need to be able to calculate when the employee has utilized a specific number of business days specific to the days of the week they work and the number of days per week work. For example, if I have an employee that works 3 business days per week (Specifically M, W, and F), and I need to know the date this employee worked a total of 30 business days, is there a way to calcuate this date (which should be 6/9/06 if we use a start date of 4/3/06.
I have a job tracker program that daddylonglegs helped me with a few days ago. I thought I would be able figure this out on my own but failed. I've attached the file to help show what I need. I know the final ship date of a project. Sometimes my projects need to go out for teflon coating.
I need Networkdays to give me a TO TEFLON date that is 5 days before the final ship date and factor in weekends and holidays.
My concern is with #3, is there a way to instruct the formula that if columna and columb are not filled in,the result should be blank. Previously I had it where it indicated NA - but the problem with this is - while it appears fine in Excel, when I pull it into Access to report on I get the -27655. This is throwing my reporting off.
I am trying to find a formula that will return the number of week days between two dates. My specific situation is that my job sets up work orders (WO) to be completed by our staff. We have 3 dates - the date the WO was created, the date the WO is due to be completed, and the date the WO was actually completed.
I would like to subtract the Complete date from the Due date. Generally, this should always equal zero because our staff should be completing WOs on the due date! But obviously that doesn't always happen. There are times that they complete them late, and times they complete them early (yay!).
The problem with NETWORKDAYS is that even when they are completed on time, the result is 1. This formula counts instead of subtracts. I adjusted the formula to =NETWORKDAYS(A3,A4)-1 which works fine for those WOs completed on time or completed late. But for those completed early, it adds (or subtracts, really) 2 days. So for a WO completed a day early, instead of it showing -1, it shows -3. I've attached an example of WOs and the NETWORKDAYS formula I've used so you can see.
Subtract Days.xls
I'm really looking for something that will subtract week days, not count them.
The issue is.. I have a locked spreadsheet and one of the column has a formula in it i.e column H +column I - column J for each particular row.
wen the user inserts a new row the formula is not entered automatically to the new cell in the column which has the formula.
could someone tel me how to write a code for calculating the cell when they click on the button.. basically i have thought of having a button which the user clicks to populate the whole column. But i am not getting the syntax right..
Column E has the amount of time each day. Column G is where I want the Sum to be displayed.
I need Column G to do a =Sum(E4:E33), but if anywhere in between E4 and E33 there is a period of 5 days where it totals 0 then I want column G to re-add from the first day where there is a amount in it.
Ex: E4 to E10 totals 7 (1 per day), from E11 to E15 totals 0, from E16 to E33 totals 18 (1 per day again).
In Column G at G10 it should total 7, at G11 it should be 6, G12 5 etc until it hits G15 where it sees the 5 previous days nothing was entered so it enters a value of 0, because G15 is set to 0, G16 will start adding from E16 till E33, until somewhere down the line it sees another period of 5 days where it adds up to 0 again.
Spreadsheet tracks race times for cross country races and needs to be able to calculate improvement time in mm:ss (or zero if less than previous race).
Also,it would be nice to be able to enter times without using colons or have to reference the field as h:mm:ss. The race result will always be mm:ss and the last two digits will always be seconds, the result will never be more than 60 minutes so hours are a real bother.
How to calculate ANI in one cell? The only way I can currently find the result is to build an amortisation schedule and then divide the sum of the outstandings by the payment frequency.
Is there any way of opening a workbook via VBA that will set the calculation to xlCalculationManual BEFORE the workbook calculates anything on opening.
The purpose: I'm opening the workbook remotely from an Access document and there are quite a few formulas in the workbook that take a few seconds to calculate. I have a modeless UserForm that displays from the Workbook_Open event which I want to get displayed before all the calculations take place so the user has something pretty to look at while he/she is waiting. But it seems that the workbook performs a calculation before running the Open event code.
I want to find out how many hours, in total, relate to "consolidation 1, 2, 3; Lease Renewal 1,2 3 etc. What formula can I use. I am working on a "sumif" but it's not working out for me. Hours 1 Consolidation 4.75 3 External Sublea 3 Consolidation 2 3 Special Project 2 External Sublea 1 Lease Renewal w 1 New Lease w/o T 4 1 New Lease w/o T 1 1 External Sublea 3 Lease Renewal w 1 2 Lease Renewal w .5
I have 5 columns with different dates to track when certain items expire per employee. Conditional Formatting is working like a champ but the data is growing.
I'd like a way to 'quick glance' at all my people that are expired, coming up on expired (this month and next).
I was thinking if there was a script to run through all 5 columns, if the date was less than today, throw the 1st,2nd and 5-9 column (in that row) into a new table. That way i can keep my big sheet but have another sheet or table that i can see QUICKLY who all needs to get their stuff up to date.
i have a problem that i have been trying to get over for about a week now. i need to calculate a lease commission, with an extensive amount of variables. first i need to find the length of the total term which should be anywhere between 1 to 10 years. then on a annual basis i need to define how many months are billable in that year. which gives me to variables to account for there, which are A= initial free months, non paying B = the last month of last year may only be a half year
i think i have worked that out pretty successfully, so next i need to calculate the rent for each year period. with several variables a= the rent can be caculated : -by per month basis - by annual basis - by a per square foot basis b= next in relation to annual rent operating expenses may also be calculated in the annual rent number also by the same variables, however it may or not be calcuated into the number depending on the lease.
c. this is where i am at now, and its killing me. i need to account for rent adjustments for each year. rent adjustments can start from either the lease start date or the date that rent starts which would be after the lease start if free rent is granted. then the adjustments will continue through the end of the term and be implimented every x number of months. the value of the adjustments will either be a percentage of the first years rent usually 3-5 % or per sf, per month, or just flat rate per year. but it will escalate each year. for example year 5 is x amount of ajustment from year 4.
i am finding difficulty in finding an annual value of the original lease term in relation to this date series. expecially if the adjustment periods leave a remainder carring over to the next year, or if their are several adjustments in one given year. any help would be appriciated on this.... i know its pretty complicated, and i have rewritten this code about 30 different ways , i am at a loss right now. if you think you may want to see my file let me know and i can post it
I have a list of numbers and i want to calculate avg and stdev but i do not want "zeros" or "blanks" to enter into the calculations. I have a formula for avg but i need one for stdev.
I have a formula which compares a date entered into a cell (say A1), against the function NOW() and returns a number. The number is the number of days left to complete a job (if the date in A1 matches the NOW() exactly then it returns 5, meaning there are 5 days left to complete the job).
I have a sheet with several NETWORKDAYS functions. They normally work perfectly, but sometimes I get a #VALUE! error as if Excel was not recognizing the function.
I haven't been able to track what exactly triggers this error. It could be related to a some macros I run, but I'm sure they do not disable Analysis Toolpak at any point. Actually if I manually disable and re-enable the add-in, the error doesn't go away.
To get rid of this bug, I need to either open the spreadsheet on a different machine or close/repoen Excel (which only works sometimes). Strangely, if I retype one of the cells, sometimes Excel will recognize the function across the board.
I have a pivot table listing stock prices from Jan to today. I would like to group them as networkdays.
I see the option to group as days and then select number of day=5. However when I view the data, the 5 day group does not mirror the calendar.
It is 5 days in a group, but it is not the 5 work days of the calendar. It might be the last 3 days and the next 2 days of the following week. I am trying to get the same week to stick together.
I have this formula for determining the numberof days in the current month, excluding today.
=NETWORKDAYS(DATE(YEAR(TODAY()),MONTH(TODAY()),DAY(1)),TODAY())-1 Now I need to exclude the holidays.
I'd rather not add another named list or table so I thought I'd use an array constant but can't get it to work. This is what I added:
{=NETWORKDAYS(DATE(YEAR(TODAY()),MONTH(TODAY()),DAY(1)),TODAY(),{DATE(2007,10,10);DATE(2007,10,11)})-1} Okay, I used oct 10 and 11 as an example to insure the formula is working. But it doesn't work and I can't figure out why.
Networkdays on default takes saturday as a holiday. Is there a way I can undo this and have only sunday as a holiday while calculating net working days.
I have attahced an example of what I need to do. I need to project due dates for each of our 8 departments based on a ship date of the final product. Each of the 8 dept. have a number of operations (ops) and given number of hours for each op. These alocated hours change on every job plus I have 2 outside operations that may or maynot be added to the mix. I don't have a clue on where to even start with this formula.
I have the formula Networkdays(A4,F4-1,L2:L10) and it works fine apart from if i enter the same date in cells A4 and F4 ie the work was processed on the same day the formula calculates a value of -2 when I would like it to be 0 Also if the cells are blank as the data has not been completed yet it comes up with a #NUM! error.
I am trying to apply a conditional format to a cell with a date entry (D5) if the date in D5 is more than 2 days previous to the date in A5 excluding weekends. I've tried variations of the following using conditional formatting