Date Stamping A Cell
Oct 12, 2007Is there a way to put a date stamp in a cell.
IE when cell D2 has any text/numbers entered into it. Cell C2 will put the current date in it and never change.
Is there a way to put a date stamp in a cell.
IE when cell D2 has any text/numbers entered into it. Cell C2 will put the current date in it and never change.
I have the code that will allow me to enter a time into a cell beside the changed data. How do I alter the programming to update a specific cell when a range are changed.
I.E when a monthly update is changed in cells range c75:C100 how can I get the latest update box at A1 to change.
I have a VBA Time and Date stamp code that is working. However, I would like the code to date and time stamp in Row 8 instead of Row 1. I need modification to the current code to start the date and time stamp in Row 8 as oppose to Row 1. The code is provided below:
VB:
Private Sub Worksheet_Change(ByVal Target As Excel.Range)
With Target
If .Count > 1 Then Exit Sub [code]....
I am populating column A with data from a bar code. In column B, I would like to insert a date/time stamp when that row's A column recieves a value. That stamp would then need to be static. I have attached a small portion of my spreadsheet to this query in case one of you divine beings has any ideas that would get me past this step. My thoughts run along these lines. If B2 has a value, skip to next row. If B2 has no data, then examine A2. If A2 is empty, then do nothing. As soon as A2 has a value entered, insert the date/time stamp in B2. Any data entered in B2 should remain unchanged from that point on.
View 5 Replies View RelatedIs there a way to get excel to apply an auto time stamp to a spreadsheet. I've tried to get users to type in the formula =NOW(), but that doesn't work because when you reopen the file the formula changes the time and date to the current status. I need a time stamp or macro to use for when users are making calls out to employees for overtime. I need to record the exact time the call was made.
View 9 Replies View RelatedIs there a way to auto generate a unique number that will stay with the adjacent data record? My problem at the moment is when a record is deleted or the data sorted the ref number changes. I am using Excel 2008
View 6 Replies View RelatedI have the following columns that return cover period dates.
Start of Cover PeriodEnd of Cover Period01-Nov-0631-Jan-0701-Jul-0831-May-0901-Dec-0930-Jun-1001-Jan-1131-Dec-10
I however need a macro that will delete the cell contents if the "Start of Cover Period" (column AK) date is > than the "End of cover period" (column AL) date.
Thus it must compare ak2 with al2 and if ak2>al2 then clear both cells. if AK2
I am working on an Inventory Spreadsheet. I have need it to date time stamp that willpopulate a different cell /field when text are entered in a different cell/field and will not change all the previous dates entered on the spreadsheetevery time I re-open the spreadsheet. I formula I am using is =IF(E3<>"",IF(D15="",NOW(),D15),"")and it changes each time I open thesheet to do the inventory so I do not know the date of the last inventory. Iwant to capture the actual date that the inventory was completed in thesecond/different cell?
View 9 Replies View RelatedI have had a look via search for similar but I'm not good enough to recognise whether other threads bear any relation to my query.
I have a small spreadsheet with basic conditional formatting (my level!) where we record agency staff for eleven months service to enable us to ask them to take a four week break.
I want to add a formula or similar to automatically roll the date forward eleven months when we amend the re-commencement date on their return.
E.g. we type in A1 01/01/09, B1 updates to 30/11/09
Is this possible?
What is the code i need to use to assign a macro to a command button which inserts the current date and time in the selected cell regardless of where that cell is?
View 5 Replies View RelatedI need an IF formula, that states if a date is more than a month after the date in the cell then it is timely and if it isn't then it is not timely. For example the date in A1 is 12/11/05, if the cell is A2 is 13/12/05 (or any date after that) then A3 should read Not Timely, if A2 is 12/12/05 (or any date before that, including a date before the date in A1) then A3 should read Timely. Is there any way to do this?? At the moment I am having to go through manually and put in either Timely or Not Timely.
View 2 Replies View RelatedI need a formula that will calculate the number of days from a date entered into cell A1 to today's date. Whether it's before or after todays date. Example:
5/10/2009 to today is -9
5/22/2009 to today is 3
I have a spreadsheet where we will be inserting the Arabic Hijri date taken from a Customs document (bayan). On my spreadsheet I'd like to have a column immediately next to the Hijri date that would convert the Hijri date to the Gregorian date so both dates will be visible for our Arabic and Western personnel who will be using the spreadsheet.
I am using Microsoft Excel 2010.
I have a input box that prompts a user to enter a date of a new month - it has to be the 1st of a new month. I have validation that it is a date that has been entered but then i want to validate the date entered is a month ahead of a date in a cell range on a sheet.
It is a monthly reset so it has to roll on from the previous month.
Here is what i have currently but it isn't working.
Code:
' Get user to input the first day of the new month to populate all dates with
dNewMonth = InputBox(Prompt:="Enter first Day of the new Month. Must be the 1st of the Month e.g. 01/10/2012", _
Title:="Enter Date")
' Validates the entered date is a valid date
If (IsDate(dNewMonth) = False) Then
[Code]...
DONNAS [Single cell, 1st row] 09/08/2003 15:34 [Single cell ( date and time combined) 2nd row]. Do you know of any way that I can move the name, date and time from the above cells to three separate columns on the same row?
View 4 Replies View RelatedIf a1,a21,a41 have a value greater than 0, I wish to stamp cell b1,b21,b41 and so on with todays date, but without the stamped value changing/advancing tomorrow. At the moment cells b1,b21,b41 are copied down as follows. =if(a1>0,TODAY(),"") This works fine, but the date stamp of course changes tomorrow. I can not apply code to the whole b column as cells b2:b20, b22:40 etc have other non-date format data to which the code does not need to apply - the todays date value cell occurs every 20 cells.
View 6 Replies View Relatedi am trying to create a forumla in a column (D in my expamle below) to count the number of days between two dates. Knowing that col D will change everytime the @now date changes - but thats ok..
COL A COL B COL D
ROW 1 Open Date Closed Date Count of days open
ROW 2 4/1/07 BLANK CELL Formula result here
ROW 3 4/1/07 9/5/07 Formula result here
if col b has a date then subrtract col a from b and display the # result, if col b is blank then subtract col a from location I store the @ now date - say Col ZZ Row 99? so no matter there is a count of number of days in every row in column D
I have column B with a heading "Days Remaining" and column L with a heading "Deadline". starting with row 5, I need to be able to enter a date in L5 and see the days I have left, from that day untill today, on B5. I need to then be able to enter a date into L6 and see a result in B6 and on and on. Then I need to be able to insert or delete a column and have the formulas still work in the columns with the heading "Days Remaining" and "Deadline"
View 7 Replies View RelatedI have a user form that when a command button is clicked it enters the data from the from into coloums a,b,c,etc. I have code to do this but I want to add code to add a static date in coloum B based on if coloum A had data entered from the form. I need the date not to change to current date when the file is reopened. I am trying to elimate a date text box in the form. I have a link to the file http://www.box.net/shared/zdtsjv0qos
View 7 Replies View RelatedI have been struggling with my Excel 07 Date format. Nearly every time I perform a calculation, enter in a value etc in a spreadsheet my answer is returned as a date. So for example if I enter in a cell: = 5 - 4. I get the answer "1-Jan-1900" instead of 1. I have to manually set the formats to general or number if I want the correct format. The setting seems to be the default one and occurs for all workbooks I open. What can I do to change this.
View 5 Replies View RelatedI'm working on the final stage of a project. I'm attempting to write code that will set off a chain of events if two dates are 91+ days apart from each other . I've attached a sample worksheet that shows the bare bones basics of what I'm attempting to do.
What will be the most efficient and effective way of accomplishing my goal: userform, functions, formatting, etc.? T
I have a "to do" spreadsheet as follows.....
Column A - nothing
Column B - Subject (thing to be done)
Column C - not relevant for this
Column D - not relevant for this
Column E - not relevant for this
Column F - importance
Column G - Deadline date
I would simply like excel to send an email to my boss (example@example.com) and if possible myself 5 days before the deadline date: email subject - '5 days left' . Email content - what ever is in the subject column for the relevant duty.
what formula could I use when I type in a date another cell rounds up to Jan 1st of the next year? ie 2/1/07 & in another cell it returns 1/1/08.
View 3 Replies View RelatedI have several hundred rows of date/times which I need to modify just the date (for example 08/23/2007 11:00 to 08/15/2008 11:00). Each row may have a different time so it is just the date I'm targeting for change.
If I manually use the replace dialog, replacing 08/23/2007 with 08/15/2008 works just fine. However, if in code I attempt to use the Cells.Replace function, it does not locate any data to change.
I have found that if I search for the string 8/23/2007, the dates are located and changed. Only when I attempt to find the fully formatted date 08/23/2007 does the function fail.
I've found similar queries on the site, but none seem to handle multiple dates, and my attempts so far have been futile!
Requirement:
I press a button on Sheet1 and am prompted to enter a start date and an end date.
Depending on the dates I enter, all rows on Sheet2 which fall outside the Start/End date range will be deleted.
All dates to be checked against on Sheet2 are in a single column, and all rows are populated, there are no blanks. Dates are in the format dd/mm/yy
I have made a table which contains 2 date columns, Both formatted as date (dd-mmm-yy), the second column is calculated as the first column, + 30, The dates work out fine when adding to a date in the first columns, but from a blank cell it displays 30-Jan-00.
e.g
Started
Finishes
12-Nov-13
12-Dec-13
30-Jan-00
09-Nov-13
09-Dec-13
11-Nov-13
11-Dec-13
Rather than delete the rows with the blanks in the Started column, is there a formula that I can use so that the cells in the "Finishes" column is left blank when the "Started" cells are blank?
The current formula for cells in the "Finished" column is:
=[@Started]+30
how I can create a formula that would highlight the cell in a colour if the date was past todays date? This is what I'm doing - I have the expiry date of people's insurances. so e.g todays date is 8 th January, so if the insurance had expired 31.12.08, i would want the cell to be highlighted red. I think it may be an IF function but I cant remember.
View 3 Replies View RelatedI'm having a problem getting the date to show up when I add the date as a referenced cell to a formula using CONCATENATE. The date shows up as a serial value instead of a date format. The formula that I'm trying to get to work is in cell J7 on the attached file.
View 3 Replies View RelatedI have a start date for a contract in cell AM1. I need AN1 show a date six months from the start date in AM1. I am fine with that part.
However, I would like for AN1 to calculate not only a six-month date but also to auto-update to the next six month date from AM1 once the first six month date is about, let's say, one month past. What I am doing is calculating when a six-month inspection needs to be completed; these inspections are ongoing, so I need them to auto-update.
So let's say a contract was awarded today, 25 JAN 2010. That would be value in AM1.
I want AN1 to produce a date six months from 25 JAN 2010, which would be 25 JUL 2010 (yes, this way of calculating the six month date is fine). Then around, let's say, 25 AUG 2010, I want AN1 to auto-update to produce the next six month date, which would be 25 JAN 2011 (six months from 25 JUL). Obviously the function would need to relate to TODAY() in some way.
I need to VBA code that will loop through the active sheet for all rows, column C2 through however many rows there are. Col C contains a date in the format: mm/dd/yyyy. I need the VBA to compare this date to today's date+30 days and if the date in C2, etc. is greater than today's date + 30 days, shade the row a particular background color (e.g., 3).