Format For Time Duration
Aug 28, 2006
Is there a format for duration of time. The attached spread sheet has column B "Duration". This is the actual time on which I need to do calculation. On "C2" I have the formula "=IF(B2>10,400,B2*40)". The formula is " if value in B2 is more than 10 hours then the value in C2 should be $400 , else C2= B2(duration time) multiplied by 40.
View 5 Replies
ADVERTISEMENT
Mar 27, 2007
I am setting up a spread sheet to calculate call duration it would be a great help if data could be entered using one hand IE use decimal point on the number pad instead of the colon is this possible. I will need to subtact start time from end time to get the duration
View 9 Replies
View Related
Sep 2, 2009
I have this set of time that is in eg. 0800 to 1630. how do i make it in to a 8.5hrs figure
View 3 Replies
View Related
Aug 4, 2014
I have a table of projects with 1) duration in year, 2) time window (number of years of our planning cycle), and 3) start year of the project. I want to generate a list of project parts of all projects where they may take place. This will serve as an input to an optimization program.
So a project of 2-year duration should have 2 parts over any year within the time window. I am including the "impossible" ones for my developer to tag them as "0" when we run it through his code.
View 5 Replies
View Related
Oct 15, 2009
How can I format cells to contain Minutes, Seconds and Hundredths of seconds to be used in calculations eg 1.24.99 means 1 minute and 24.99 seconds. Example calculation is: 1.24.99 - 1.24.90 =0.0.09
View 2 Replies
View Related
May 18, 2003
I'm working on converting some databases. One has entries with normal human readable time format, the other uses the unix epoch time format.
Is there a function or vba code that I can use in excel to convert the normal time format to epoch time?
I've got a thousand or so entries, so it would be nice to find a way to do this on a large scale.
View 9 Replies
View Related
Sep 6, 2006
I have one column with as many as 50,000 or more rows. The data format for each row/ cell is unique as shown below ( date and time). I wanted to split the data as shown in "Formatted Data" below. Have Tried Text To Column formatting but didn't work right.
Raw Data: Formatted Data (2 cells):
2005/11/02 23:55:15.758 ==> 2005/11/02 23:55:15.758
2005/11/02 23:58:16.698 ==> 2005/11/02 23:58:16.698
2005/11/03 00:07:13.830
2005/11/03 00:10:14.971
View 6 Replies
View Related
Oct 12, 2009
I have a cell with both date & time "10/9/09 3:15" This is put in the current cell by formula which indexes two dif. cells, Now I am trying to copy this cell and paste into another book but like to have only date. How can I do that? Each time I try it gives me the time value in the pasted cell and I cannot even format it.
View 5 Replies
View Related
Sep 23, 2009
I have a file that has the Date and Time combined into one cell. I want to separate the two, and cannot find anywhere on the net to do so!
This is the cells format:
d/mm/yyyy h:mm
Cells look like this:
28/05/2008 12:30
View 6 Replies
View Related
May 18, 2003
I'm working on converting some databases. One has entries with normal human readable time format, the other uses the unix epoch time format.
Is there a function or vba code that I can use in excel to convert the normal time format to epoch time?
I've got a thousand or so entries, so it would be nice to find a way to do this on a large scale.
View 9 Replies
View Related
Dec 28, 2006
I have a Excel Dates & Times column where the time is not always used. In these cases the time is 12:00AM. Is there a way to Custom Formats the cell so that the time is only visible if it is not 12:00AM?
View 6 Replies
View Related
Nov 28, 2013
How do I convert 11.20.00 in A1 to 11:20:00 in B1?
I've tried =TEXT(A1,"hh:mm:ss") to no avail.
View 3 Replies
View Related
Dec 31, 2009
As mentioned below , in excel sheethow to add and subtract time value and get result in time format. As given in below sheet, suppose i want to calculate each day stoppage duration and finally total stoppge duration. Kindly let me know the farmula or function for the same with example. I'm using excel 2003.
STOPSTARTDURATION
10:4512:151:30
0:201:301:10
5:5012:256:35
19:3020:301:00
16:0517:051:00
15:5017:151:25
23:500:000:10
0:001:001:00
23:300:000:30
0:001:001:00
17:2018:301:10
3:504:501:00
View 4 Replies
View Related
Mar 13, 2008
I found a formula for calculating time in the HH:MM AM/PM
=IF(B1<A1,B1+1,B1)-A1
This formula was to give me total hours in the cell for which it is entered, and cell format for the formula was in military format.
I cannot find this post. The formula worked in OpenOffice Calc program, but when it came to converting to excel, I came up with #value!
I want to enter the time in 12 hour format and using am/pm to designate. I am making it for someone to make work schedules with and they do not know military time.
View 11 Replies
View Related
Jul 7, 2006
i want to ask for a reason if a item is late where M & line is the time it should have left and N & line is the actual time it left.
TL is the difrence between the two times
i want the input box to read " DRIVER DISPATCHED 30 MINUTES LATE PLEASE ENTER REASON"
but it returns "DRIVER DISPATCHED -.11233543 E2 MINUTES LATE"
how do i format this to show the difrence in minutes
TL = Range("N" & Line) - Range("M" & Line)
late = InputBox("DRIVER DISPATCHED " & TL & " MINUTES LATE PLEASE ENTER REASON")
View 3 Replies
View Related
May 8, 2009
a formula that I could deduct one time from another and get an answer that gives me the total times in hours and minutes.
So in the case of a person starts work at 7:56:24 and finishes at 15:24:20 - What formula would I need to calculate the amount of hours and minutes worked.
View 9 Replies
View Related
Jan 28, 2014
I am trying trying to calculate the amount of time students view videos. I understand I should use [h]:mm:ss but excel continues to convert entries such as 0:14:59 (0 hours, 14 minutes, 59 seconds) to 12:14:49 PM both in the cell and the function bar.
The problem gets complicated because I have entered the data with two different formats; some in h:mm and some in h:mm:ss'
1) Is there an easy way to sum the duration time so it accurately reflects total hours:minutes:seconds?
2) Do I need to reformat or re-enter data to make it work?
3) If so, is there a macro to do it?
This has been a bear, (40 students by 30 videos) all hand coded.
View 5 Replies
View Related
Oct 26, 2008
Date problem.
I need to find the duration of time based on 4 columns:
column A : Start date DD/MM/YYYY
Column B : Start time HH:MM:SS [24 hour clock]
column C : End Date DD/MM/YYYY
Column D : End time HH:MM:SS [24 hour clock]
Column E: The duration result in : in Days and Hours
I have several thousand rows and need to complete before tomorrow
View 9 Replies
View Related
Feb 16, 2010
I have the below Date & time in cell a1 and another date and time in cell a3
8/2/2010 08:45:00
8/2/2010 10:15:00
I need to be able to show duration (in hours) between the 2 times, in this instance its the same date, but this wont always be the case. To add a level of complexity in addition to the gross duration in hours, I will also need to know how long (in hours or mins) of the duration fits into "in hours" ( 9 -5 mon- fri) then the duration thats fits "out of hours" (after 5pm weekdays or all day Sat & Sun)
View 9 Replies
View Related
Nov 9, 2008
I'm trying to create a work sheet with start and ending times with a 30 minute meal break, for the end of the week I would like to calculate those hours as a general number.
View 2 Replies
View Related
Aug 7, 2009
I have a worksheet where I calculate the duration it takes for an operation. the format of the worksheet is as folows:
The worksheet is composed of Start and Finish times in this format: 2009/06/02 5:32:19 , so for example,
- Row1 of the worksheet will have "Start" in column H1 and the start time in column B1
- Row 2 of the worksheet directly below has the "Finish" time, with the Finish time information in column B2
So with the help of excelforums I was able to implement a macro to extract the finish time cell found in row B2 and offset it to C1 and do a simple calculation to get the duration in minutes and display it in column D of the same row as "Start".
View 12 Replies
View Related
Oct 9, 2012
I'd like to write a VBA script which writes all data of my mp3s in a spreadsheet. I can read all data like the artist, songname, album, year, this works fine. However I'm not able to get the duration of the mp3 files. Any sample script which reads the duration of the mp3 files?
View 2 Replies
View Related
Jan 12, 2008
I have following data, data_in and date_out. I need to auto cal these 2 variable different and give the output as duration in month.
x_INV EF1date_lndate_out205/10/195005/10/1950325/10/195025/10/1950415/11/195015/11/1950508/01/195029/10/1950618/10/195018/10/1950717/10/195017/10/1950817/10/195017/10/1950915/10/195020/12/19501013/12/195013/12/1950 Excel tables to the web >> Excel Jeanie HTML 4
And give the result in colume X as following :-
x_INV X1stk_dur20304051060708092 Excel tables to the web >> Excel Jeanie HTML 4
View 9 Replies
View Related
Feb 2, 2009
I have 10 columns (1 through 10) called TASKS and 2 rows for each task
Row 1, has a 'start date' in the form of 1/1/2010
Row 2, is duration
the duration of each task may or may not overlap with other durations of other tasks.
how can i find out the total duration of ALL my tasks.....without any overlaping.
any formula that can calculate this? ( i need one number at the end!)
View 9 Replies
View Related
Jul 21, 2009
I've recently been experiencing some strange phenomena in relation to public variables. It seems that if I run separate routines in quick enough succession (e.g. press a button twice within a couple of seconds), the memory of the public variable "hangs over" into the second routine.
The routines, however, are completely separate events. And I'm not using userforms or anything like that in order to keep VBA running in the background. In which case it seems that Public variables don't always get set to nothing with the end of the final sub in a routine. Has anyone else experienced anything like this? I was under the impression only Static variables could do this.
View 9 Replies
View Related
Jan 2, 2013
I have loaded a .csv file in which the first column contains date/times, e.g. 01/12/2012 00:00. How do I now tell Excel (2010) that this is in fact a date/time format? If I select one or more of the cells, click on the Number dialog box launcher and try to pick a suitable format tghe cells resolutely refuse to budge from being text (i.e. left-justified, still allows me to edit the 'seconds' component to a number > 60). Also which data type should I be using? The only one that appears to have a full date/time format listed is Custom (not Date or Time).
View 4 Replies
View Related
Feb 27, 2014
I have a Log In/Log Out report that I need pulling data from.
Ultimately what I want to do is get the amount of time my employees were logged out.
I am using Excel 2003. Attached is an example of the data I'm working with.
Sheet 1 contains the data, and Sheet 2 will be the summary.
So, looking at Bob's times: If column A contains Bob (A2 in this case), and the same row in column G (G2) contains 79, subtract the contents of the same row in column F (F2) from the next row down in column D (D3) (which would be D3 - F2). That result should populate on Sheet 2 next to Bob's name in h:mm:ss format.
If there is nothing in the next row down in column D, then do nothing.
I would like to leave the data as is, if possible. There are extension numbers next to the names in the data. If possible to ignore those when rolling up to the summary that would be useful. Also, on the summary sheet, if the employee is not on the data sheet (if they had the day off) they can have 0 or NA or something to indicate there is no data for them.
View 1 Replies
View Related
Mar 12, 2014
What is the formula for calculating duration in min/hrs between start time and end time without mentioning any date, and if the end time stretches to next day i.e beyond 12.00 midnight. And what is the logic used in the formula.
View 1 Replies
View Related
Mar 14, 2014
How is MOD function used for calculating duration between two timings.
View 3 Replies
View Related
Sep 10, 2013
I'm working on a project that will will have varying tasks & estimating the total duration to complete these tasks.
For example:
If estimating that the min-project will take 90 days & I have 17 tasks, how can I distribute the 90 days evenly amongst the 17 tasks?
View 5 Replies
View Related