Sum Duration Times In H:mm:ss
Jan 28, 2014
I am trying trying to calculate the amount of time students view videos. I understand I should use [h]:mm:ss but excel continues to convert entries such as 0:14:59 (0 hours, 14 minutes, 59 seconds) to 12:14:49 PM both in the cell and the function bar.
The problem gets complicated because I have entered the data with two different formats; some in h:mm and some in h:mm:ss'
1) Is there an easy way to sum the duration time so it accurately reflects total hours:minutes:seconds?
2) Do I need to reformat or re-enter data to make it work?
3) If so, is there a macro to do it?
This has been a bear, (40 students by 30 videos) all hand coded.
View 5 Replies
ADVERTISEMENT
Jan 21, 2008
I have a spreadsheet with 4 columns - Start Date, Start Time, End Date and End Time. In the 5th column, I need to fill in the "Duration" which is calculated as follows :- Duration = (End Date,End Time) - (Start Date,Start Time)
View 2 Replies
View Related
Oct 26, 2008
Date problem.
I need to find the duration of time based on 4 columns:
column A : Start date DD/MM/YYYY
Column B : Start time HH:MM:SS [24 hour clock]
column C : End Date DD/MM/YYYY
Column D : End time HH:MM:SS [24 hour clock]
Column E: The duration result in : in Days and Hours
I have several thousand rows and need to complete before tomorrow
View 9 Replies
View Related
Feb 16, 2010
I have the below Date & time in cell a1 and another date and time in cell a3
8/2/2010 08:45:00
8/2/2010 10:15:00
I need to be able to show duration (in hours) between the 2 times, in this instance its the same date, but this wont always be the case. To add a level of complexity in addition to the gross duration in hours, I will also need to know how long (in hours or mins) of the duration fits into "in hours" ( 9 -5 mon- fri) then the duration thats fits "out of hours" (after 5pm weekdays or all day Sat & Sun)
View 9 Replies
View Related
Nov 9, 2008
I'm trying to create a work sheet with start and ending times with a 30 minute meal break, for the end of the week I would like to calculate those hours as a general number.
View 2 Replies
View Related
Aug 7, 2009
I have a worksheet where I calculate the duration it takes for an operation. the format of the worksheet is as folows:
The worksheet is composed of Start and Finish times in this format: 2009/06/02 5:32:19 , so for example,
- Row1 of the worksheet will have "Start" in column H1 and the start time in column B1
- Row 2 of the worksheet directly below has the "Finish" time, with the Finish time information in column B2
So with the help of excelforums I was able to implement a macro to extract the finish time cell found in row B2 and offset it to C1 and do a simple calculation to get the duration in minutes and display it in column D of the same row as "Start".
View 12 Replies
View Related
Oct 9, 2012
I'd like to write a VBA script which writes all data of my mp3s in a spreadsheet. I can read all data like the artist, songname, album, year, this works fine. However I'm not able to get the duration of the mp3 files. Any sample script which reads the duration of the mp3 files?
View 2 Replies
View Related
Jan 12, 2008
I have following data, data_in and date_out. I need to auto cal these 2 variable different and give the output as duration in month.
x_INV EF1date_lndate_out205/10/195005/10/1950325/10/195025/10/1950415/11/195015/11/1950508/01/195029/10/1950618/10/195018/10/1950717/10/195017/10/1950817/10/195017/10/1950915/10/195020/12/19501013/12/195013/12/1950 Excel tables to the web >> Excel Jeanie HTML 4
And give the result in colume X as following :-
x_INV X1stk_dur20304051060708092 Excel tables to the web >> Excel Jeanie HTML 4
View 9 Replies
View Related
Feb 2, 2009
I have 10 columns (1 through 10) called TASKS and 2 rows for each task
Row 1, has a 'start date' in the form of 1/1/2010
Row 2, is duration
the duration of each task may or may not overlap with other durations of other tasks.
how can i find out the total duration of ALL my tasks.....without any overlaping.
any formula that can calculate this? ( i need one number at the end!)
View 9 Replies
View Related
Jul 21, 2009
I've recently been experiencing some strange phenomena in relation to public variables. It seems that if I run separate routines in quick enough succession (e.g. press a button twice within a couple of seconds), the memory of the public variable "hangs over" into the second routine.
The routines, however, are completely separate events. And I'm not using userforms or anything like that in order to keep VBA running in the background. In which case it seems that Public variables don't always get set to nothing with the end of the final sub in a routine. Has anyone else experienced anything like this? I was under the impression only Static variables could do this.
View 9 Replies
View Related
Aug 28, 2006
Is there a format for duration of time. The attached spread sheet has column B "Duration". This is the actual time on which I need to do calculation. On "C2" I have the formula "=IF(B2>10,400,B2*40)". The formula is " if value in B2 is more than 10 hours then the value in C2 should be $400 , else C2= B2(duration time) multiplied by 40.
View 5 Replies
View Related
Feb 27, 2014
I have a Log In/Log Out report that I need pulling data from.
Ultimately what I want to do is get the amount of time my employees were logged out.
I am using Excel 2003. Attached is an example of the data I'm working with.
Sheet 1 contains the data, and Sheet 2 will be the summary.
So, looking at Bob's times: If column A contains Bob (A2 in this case), and the same row in column G (G2) contains 79, subtract the contents of the same row in column F (F2) from the next row down in column D (D3) (which would be D3 - F2). That result should populate on Sheet 2 next to Bob's name in h:mm:ss format.
If there is nothing in the next row down in column D, then do nothing.
I would like to leave the data as is, if possible. There are extension numbers next to the names in the data. If possible to ignore those when rolling up to the summary that would be useful. Also, on the summary sheet, if the employee is not on the data sheet (if they had the day off) they can have 0 or NA or something to indicate there is no data for them.
View 1 Replies
View Related
Mar 12, 2014
What is the formula for calculating duration in min/hrs between start time and end time without mentioning any date, and if the end time stretches to next day i.e beyond 12.00 midnight. And what is the logic used in the formula.
View 1 Replies
View Related
Mar 14, 2014
How is MOD function used for calculating duration between two timings.
View 3 Replies
View Related
Sep 2, 2009
I have this set of time that is in eg. 0800 to 1630. how do i make it in to a 8.5hrs figure
View 3 Replies
View Related
Sep 10, 2013
I'm working on a project that will will have varying tasks & estimating the total duration to complete these tasks.
For example:
If estimating that the min-project will take 90 days & I have 17 tasks, how can I distribute the 90 days evenly amongst the 17 tasks?
View 5 Replies
View Related
Oct 18, 2009
is it possible to calculate the total duration of logged in from the data below?
TimeDateTimeExtCoDial Number08:02:00 AM11/10/200908:02AM203LOG IN08:03:00 AM11/10/200908:03AM2033448249908:05:00 AM11/10/200908:05AM207LOG IN08:05:00 AM11/10/200908:05AM132102445477708:08:00 AM11/10/200908:08AM207102445477708:11:00 AM11/10/200908:11AM1322908:11:00 AM11/10/200908:11AM1323008:12:00 AM11/10/200908:12AM2073008:12:00 AM11/10/200908:12AM2032908:13:00 AM11/10/200908:13AM132202631121108:14:00 AM11/10/200908:14AM203LOG OUT
Column 'A' has the time and extn# on column 'D' and indication of logged in or logged out on column 'F'
there can be several log in and log out by an extn.
View 9 Replies
View Related
Oct 1, 2013
I need to formula to covert duration between start date and end date to units below.
Start Date
End Date
Number of Month
Number of Years
Number of Days
6/1/13
8/31/13
[Code] .........
View 6 Replies
View Related
May 25, 2006
I encounter an problem when I migrate the excel application from excel 97 to excel 2000. The application basically composed of VB6 and VBA. When the program execute to line "ChangeHistoryDuration", i.e.
'Turn On the Audit
ExlApp. ActiveWorkbook.KeepChangeHistory = True
ExlApp.ActiveWorkbook.ChangeHistoryDuration = gi_duration
ExlApp.ActiveWorkbook. SaveAs w_filename, , gs_open_pwd, gs_write_pwd, , , xlShared
Run-time Error '1004', Method 'ChangeHistoryDuration' of object '_Workbook' faild was found. However, it runs successfully in excel 97. Does anyone know the possible problem that cause such error.
View 4 Replies
View Related
Mar 27, 2007
I am setting up a spread sheet to calculate call duration it would be a great help if data could be entered using one hand IE use decimal point on the number pad instead of the colon is this possible. I will need to subtact start time from end time to get the duration
View 9 Replies
View Related
Feb 20, 2014
I need a formula that will calculate the percentage of the total duration between two dates (in dd.mm.yyyy hh:mm format) that a third, intervening date represents.
As an example:
a) 10th Jan 2014 09:00
b) 20th Jan 2014 09:00
c) 30th Jan 2014 09:00
In this case the answer sould be 50% because 'b' represents exactly half of the time elapsed between 'a' and 'c'.
Note: the formula needs to work effectively across the boundary between two consecutive years.
View 1 Replies
View Related
Feb 23, 2010
In my workbook I have about 20 sheets (less in the attached sample), and on most sheets I’d like to query data for each day and find an average value based on the time and then copy that result into another sheet. I’m not sure if I’ll need 2 macro’s for this or if one can be used.
Here’s a quick description:
Assuming that I am currently in the sheet I want to run the macro, then I will either input “1:45” or “0:45” into a popup box, or I could always simply input the 1:45 or 0:45 in the code itself. I’m flexible
1:45:
If I input 1:45, then I’d like the macro to find the first 1:45 in Column B and the value in the same row in Column F will be used in the calculation. Once 1:45 is located, then the macro moves up to find 22:45 in Column B and the value in the same row in Column F will be used in the calculation.....
View 11 Replies
View Related
Apr 8, 2014
I'm looking for a formula that will calculate the difference in times between specific times while working with a 24 hr clock. Please see details below:
E3 provides the start time of 4:00
H3 provides an end time of 15:30
If an employee works betwen the hours of 0:00 (midnight) to 5:59, this is considered DIFF hours and is therefore the number I am seaking. So for the data noted above, the total DIFF hours worked is 2 hours.
View 7 Replies
View Related
Mar 7, 2009
I need a formula in excel to convert start times and end times and minus out lunch time taken and then give total hours worked. For instance,
Column D Column E Column F Column G
Start End Lunch Total Hours Worked
10:01AM 7:08PM 1:01 (formula to convert hours worked)
View 9 Replies
View Related
Mar 14, 2014
I need a formula that will calucalte the monthly total based on the following conditions:
Col A = Yearly Cost
Col B = The number of the month when the costs are starting (1=Jan etc)
Col C = The duration or the number of months for which the costs are to spread
Col D is Year 2013 with the months across columns D-O. Row 1 above those columns shows the month's corresponding number.
Right now I have =IF($B3<=D$1,$A3/$C3,0) however if my start month is 1 and my duration is 5, I need the costs to stop after May. I've attached a sample file. Calculate based on start month and duration.xlsx
View 3 Replies
View Related
Aug 4, 2014
I have a table of projects with 1) duration in year, 2) time window (number of years of our planning cycle), and 3) start year of the project. I want to generate a list of project parts of all projects where they may take place. This will serve as an input to an optimization program.
So a project of 2-year duration should have 2 parts over any year within the time window. I am including the "impossible" ones for my developer to tag them as "0" when we run it through his code.
View 5 Replies
View Related
Sep 15, 2006
I thought I found a formula that would work, but it's not working. Each month I have to count the number of service tickets that have arrived between certain time ranges. They want to gauge during what times we seem to get the biggest batch of service requests.
6 am to 10 am
10 am to 5 pm
5 pm to 6 pm
6 pm to 6 am
The format of the cells are:
1:21:19 AM
1:28:08 AM
1:35:48 AM
1:49:19 AM
2:17:02 AM
7:14:38 AM
7:29:12 AM
8:08:28 AM
8:51:48 AM
8:54:19 AM
The formula I tried for 10 am to 5 pm: =COUNTIF(B2:B677,">="&TIME(10,0,0))-COUNTIF(B2:B677,">"&TIME(17,0,0))
It gives a result of 676, and I know from manually counting that there is only 327 cells that have a time between 10 am and 5 pm.
View 3 Replies
View Related
Jul 12, 2007
I included a spreadsheet that lays out what I am looking to do, basically I copied some times and speed from net. It shows up in non 24 hour format. I need to find the times and an associated speed for each row (day) directly before and after my inputted desired time. I've searched for days, tried different formulas with index,match, lookups,timevalue, time, etc and even tried using other peoples vba code without success.
View 9 Replies
View Related
Sep 28, 2007
i need to calculate between time. If a person is working between 8 till 12 and then 1 till 5 i need to count the instances between these times.. so if somebody is working between these hours a 1 should appear and if they have finished their shift or are on lunch then this should change to 0
e.g.
8.00 | 8.30 etc.. 12.30 | 13:00
1 | 1 | 0 | 1
View 9 Replies
View Related
Jul 10, 2009
Have a spreadsheet i need to add together a large array of durations which are recorded in hours minutes and seconds. They are all formated like 0:00:00 and will likely run over a 24 hour period. Adding two of these together is fine but when i try and add multiple using =(A1:A5) the result returned is always 0:00:00. I have tried formatting them as both general, and time in format H:MM:SS. Have also tried doing a pivot table changing the field options to SUM of call duration. Screenshot attach with column is question i'm trying to sum.
View 5 Replies
View Related