MOD Function Used For Calculating Duration Between Two Timings?

Mar 14, 2014

How is MOD function used for calculating duration between two timings.

View 3 Replies


ADVERTISEMENT

Calculating Duration Of Tasks

Aug 7, 2009

I have a worksheet where I calculate the duration it takes for an operation. the format of the worksheet is as folows:

The worksheet is composed of Start and Finish times in this format: 2009/06/02 5:32:19 , so for example,

- Row1 of the worksheet will have "Start" in column H1 and the start time in column B1
- Row 2 of the worksheet directly below has the "Finish" time, with the Finish time information in column B2

So with the help of excelforums I was able to implement a macro to extract the finish time cell found in row B2 and offset it to C1 and do a simple calculation to get the duration in minutes and display it in column D of the same row as "Start".

View 12 Replies View Related

Calculating Duration Of ALL My Tasks

Feb 2, 2009

I have 10 columns (1 through 10) called TASKS and 2 rows for each task
Row 1, has a 'start date' in the form of 1/1/2010
Row 2, is duration

the duration of each task may or may not overlap with other durations of other tasks.

how can i find out the total duration of ALL my tasks.....without any overlaping.

any formula that can calculate this? ( i need one number at the end!)

View 9 Replies View Related

Formula For Calculating Duration Between Two Timing

Mar 12, 2014

What is the formula for calculating duration in min/hrs between start time and end time without mentioning any date, and if the end time stretches to next day i.e beyond 12.00 midnight. And what is the logic used in the formula.

View 1 Replies View Related

Macro For Finding Difference Between Two Timings Of Column And Adjusting Them?

Mar 27, 2014

HTML Code: 

Time,s act1act2
21.12.1
31.22.2
41.22.3
51.32.4
61.42.5
71.42.6
81.52.7
91.62.8
101.910
112020
124030
136020
144010
152010.1
16310.2
17310.3

I have this data...I need a macro which can find difference of timing between peaks of "act1" and "act2" and can adjust the act2 column such that their peaks are on same line.. For exampe here in data peaks of "act1" is at 13seconds and of "act2" is at 12seconds..so the difference is +1...I will insert 1 one cell in "Act2" from above which will shift down the column such that 60 in act1 and 30 in act2 will be in line...or for another example if 30 is below 60 ....>..if difference is -1 seconds or in minus it can delete the same number of cells from above in act2 coloumn(deletion of cells from the beginning which are under the title act2)..

View 1 Replies View Related

Sum Function Not Calculating

Sep 24, 2007

im currently working on a spreadsheet that tallies financial information for a few national conferences we are hosting at work. It is structured along the lines of below:......

The total is calculate using the SUM function. For sum reason the SUM function has stopped working in one of our columns. Example, if you take the above example, the SUM function for the income is working, but the SUM function for Expenditure comes up with $ - What does this mean? There are no weird values in any of the cells, the formula is exactly the same as the income column, i just don't know where it has gone wrong?

View 3 Replies View Related

Function In Spreadsheet Calculating Incorrectly

Oct 22, 2008

This is a two part question. I thank any help that can be given in regards to my problem. I have attached a spreadsheet similiar to what is used at work. We gather this information from a report we use.

Part one- in Column F, we have it set up to know how long the customer is deliquent. Column F is the difference between the date in column D and the date that is in cell E2. We are using the formula networkdays which will not count the saturday and sundays of the weeks.

The problem is, that sometimes when we place the information from the report, the value in column F is off a day, which causes us to have to adjust the formula so the information is the same. Why do we have to adjust the formula?

Part two - In the networkday formula, we do not want to include certain holidays, which is listed in column J. Is there a way to have the dates for the holidays auto advance if the dates in column J is less than the dates in column D?

View 14 Replies View Related

Macro Or Excel Function For Calculating Average

Apr 16, 2014

Excel function or macros for calculating the average of waterSD column where the TT column is less than or equal to 100(red markings). functions like IF TT IS LESS THAN OR EQUAL TO 100, THEN CALCULATE AVERAGE OF WATERSD....

I had done manually on the right side in the attached excel sheet. only those yellow markings.

Because already I have some macro which do this process but it is not accounting for the TT column less than 100. it starts from 200 TT values. but i need to include 100 TT also. That's is where now we have yellow markings. I will provide you the macro code if you can edit that where it will start calculating form 100TT value, it will be really great. The code is,

[Code] .....

Attached File : average for watersd OF 100TT.xlsx‎

View 3 Replies View Related

Custom VBA Function - Automatic Calculating Values

Feb 27, 2014

I'm having problems with a custom VBA Function, regarding with the automatic calculating values.

Basically i have a function that receives an input parameter, cell address, and returns a string, changing the cell value.

View 4 Replies View Related

Excel 2007 :: Calculating IRR Using Rate Function?

Aug 11, 2012

I am using excel 2007. I am trying to calculate the internal rate of return, without creating an array. I figured out that I can use the rate function to give me the same answer as the IRR function if I have one payment stream of say 36 months @ 1000. Where I am an running into trouble is if I have second payment stream of 6 months extension of 1500. Rate # pay 36 amt 75 PV = 5000 FV 500 , How to handle the the last 6 months ?

This is the situation

asset costs is 5000
monthly lease is 75 for 36 months
extension for 6 months is 125
end of lease buyout is 500

what is the internal rate of return without creating an array.

View 4 Replies View Related

Simple Function For Calculating Number Of Months Between 2 Dates

Jun 22, 2012

Is there a simple function for calculating the number of months between 2 dates.

Eg 1/5/2012 - 8/9/2020

View 1 Replies View Related

Sum Duration Times In H:mm:ss

Jan 28, 2014


I am trying trying to calculate the amount of time students view videos. I understand I should use [h]:mm:ss but excel continues to convert entries such as 0:14:59 (0 hours, 14 minutes, 59 seconds) to 12:14:49 PM both in the cell and the function bar.

The problem gets complicated because I have entered the data with two different formats; some in h:mm and some in h:mm:ss'

1) Is there an easy way to sum the duration time so it accurately reflects total hours:minutes:seconds?
2) Do I need to reformat or re-enter data to make it work?
3) If so, is there a macro to do it?

This has been a bear, (40 students by 30 videos) all hand coded.

View 5 Replies View Related

Date Duration

Oct 26, 2008

Date problem.

I need to find the duration of time based on 4 columns:

column A : Start date DD/MM/YYYY
Column B : Start time HH:MM:SS [24 hour clock]

column C : End Date DD/MM/YYYY
Column D : End time HH:MM:SS [24 hour clock]

Column E: The duration result in : in Days and Hours

I have several thousand rows and need to complete before tomorrow

View 9 Replies View Related

Duration Formula

Feb 16, 2010

I have the below Date & time in cell a1 and another date and time in cell a3

8/2/2010 08:45:00
8/2/2010 10:15:00


I need to be able to show duration (in hours) between the 2 times, in this instance its the same date, but this wont always be the case. To add a level of complexity in addition to the gross duration in hours, I will also need to know how long (in hours or mins) of the duration fits into "in hours" ( 9 -5 mon- fri) then the duration thats fits "out of hours" (after 5pm weekdays or all day Sat & Sun)

View 9 Replies View Related

Calculate Duration Of Hours

Nov 9, 2008

I'm trying to create a work sheet with start and ending times with a 30 minute meal break, for the end of the week I would like to calculate those hours as a general number.

View 2 Replies View Related

Get Duration Of MP3 File In Spreadsheet

Oct 9, 2012

I'd like to write a VBA script which writes all data of my mp3s in a spreadsheet. I can read all data like the artist, songname, album, year, this works fine. However I'm not able to get the duration of the mp3 files. Any sample script which reads the duration of the mp3 files?

View 2 Replies View Related

Write Code To Cal Duration

Jan 12, 2008

I have following data, data_in and date_out. I need to auto cal these 2 variable different and give the output as duration in month.

x_INV  EF1date_lndate_out205/10/195005/10/1950325/10/195025/10/1950415/11/195015/11/1950508/01/195029/10/1950618/10/195018/10/1950717/10/195017/10/1950817/10/195017/10/1950915/10/195020/12/19501013/12/195013/12/1950 Excel tables to the web >> Excel Jeanie HTML 4

And give the result in colume X as following :-

x_INV  X1stk_dur20304051060708092 Excel tables to the web >> Excel Jeanie HTML 4

View 9 Replies View Related

Public Variables Duration

Jul 21, 2009

I've recently been experiencing some strange phenomena in relation to public variables. It seems that if I run separate routines in quick enough succession (e.g. press a button twice within a couple of seconds), the memory of the public variable "hangs over" into the second routine.

The routines, however, are completely separate events. And I'm not using userforms or anything like that in order to keep VBA running in the background. In which case it seems that Public variables don't always get set to nothing with the end of the final sub in a routine. Has anyone else experienced anything like this? I was under the impression only Static variables could do this.

View 9 Replies View Related

Format For Time Duration

Aug 28, 2006

Is there a format for duration of time. The attached spread sheet has column B "Duration". This is the actual time on which I need to do calculation. On "C2" I have the formula "=IF(B2>10,400,B2*40)". The formula is " if value in B2 is more than 10 hours then the value in C2 should be $400 , else C2= B2(duration time) multiplied by 40.

View 5 Replies View Related

Excel 2003 :: Log Out Duration Per Employee

Feb 27, 2014

I have a Log In/Log Out report that I need pulling data from.

Ultimately what I want to do is get the amount of time my employees were logged out.

I am using Excel 2003. Attached is an example of the data I'm working with.

Sheet 1 contains the data, and Sheet 2 will be the summary.

So, looking at Bob's times: If column A contains Bob (A2 in this case), and the same row in column G (G2) contains 79, subtract the contents of the same row in column F (F2) from the next row down in column D (D3) (which would be D3 - F2). That result should populate on Sheet 2 next to Bob's name in h:mm:ss format.

If there is nothing in the next row down in column D, then do nothing.

I would like to leave the data as is, if possible. There are extension numbers next to the names in the data. If possible to ignore those when rolling up to the summary that would be useful. Also, on the summary sheet, if the employee is not on the data sheet (if they had the day off) they can have 0 or NA or something to indicate there is no data for them.

View 1 Replies View Related

Converting Duration To Hours Format

Sep 2, 2009

I have this set of time that is in eg. 0800 to 1630. how do i make it in to a 8.5hrs figure

View 3 Replies View Related

Distribute Duration Evenly Amongst Tasks?

Sep 10, 2013

I'm working on a project that will will have varying tasks & estimating the total duration to complete these tasks.

For example:

If estimating that the min-project will take 90 days & I have 17 tasks, how can I distribute the 90 days evenly amongst the 17 tasks?

View 5 Replies View Related

Find Out Total Duration Logged In

Oct 18, 2009

is it possible to calculate the total duration of logged in from the data below?

TimeDateTimeExtCoDial Number08:02:00 AM11/10/200908:02AM203LOG IN08:03:00 AM11/10/200908:03AM2033448249908:05:00 AM11/10/200908:05AM207LOG IN08:05:00 AM11/10/200908:05AM132102445477708:08:00 AM11/10/200908:08AM207102445477708:11:00 AM11/10/200908:11AM1322908:11:00 AM11/10/200908:11AM1323008:12:00 AM11/10/200908:12AM2073008:12:00 AM11/10/200908:12AM2032908:13:00 AM11/10/200908:13AM132202631121108:14:00 AM11/10/200908:14AM203LOG OUT

Column 'A' has the time and extn# on column 'D' and indication of logged in or logged out on column 'F'

there can be several log in and log out by an extn.

View 9 Replies View Related

Covert Duration Between Start And End Date To Units

Oct 1, 2013

I need to formula to covert duration between start date and end date to units below.

Start Date
End Date
Number of Month
Number of Years
Number of Days

6/1/13
8/31/13

[Code] .........

View 6 Replies View Related

Change History Duration Error '1004'

May 25, 2006

I encounter an problem when I migrate the excel application from excel 97 to excel 2000. The application basically composed of VB6 and VBA. When the program execute to line "ChangeHistoryDuration", i.e.

'Turn On the Audit
ExlApp. ActiveWorkbook.KeepChangeHistory = True
ExlApp.ActiveWorkbook.ChangeHistoryDuration = gi_duration
ExlApp.ActiveWorkbook. SaveAs w_filename, , gs_open_pwd, gs_write_pwd, , , xlShared

Run-time Error '1004', Method 'ChangeHistoryDuration' of object '_Workbook' faild was found. However, it runs successfully in excel 97. Does anyone know the possible problem that cause such error.

View 4 Replies View Related

Calculate Duration Based On Start & End Times

Jan 21, 2008

I have a spreadsheet with 4 columns - Start Date, Start Time, End Date and End Time. In the 5th column, I need to fill in the "Duration" which is calculated as follows :- Duration = (End Date,End Time) - (Start Date,Start Time)

View 2 Replies View Related

Time Format- Spread Sheet To Calculate Call Duration

Mar 27, 2007

I am setting up a spread sheet to calculate call duration it would be a great help if data could be entered using one hand IE use decimal point on the number pad instead of the colon is this possible. I will need to subtact start time from end time to get the duration

View 9 Replies View Related

Formula To Return Percentage Of Duration Elapsed Between Two Dates A Third Date Represents?

Feb 20, 2014

I need a formula that will calculate the percentage of the total duration between two dates (in dd.mm.yyyy hh:mm format) that a third, intervening date represents.

As an example:

a) 10th Jan 2014 09:00
b) 20th Jan 2014 09:00
c) 30th Jan 2014 09:00

In this case the answer sould be 50% because 'b' represents exactly half of the time elapsed between 'a' and 'c'.

Note: the formula needs to work effectively across the boundary between two consecutive years.

View 1 Replies View Related

Formula To Calculate Based On Start Month Number And Duration Number Of Months

Mar 14, 2014

I need a formula that will calucalte the monthly total based on the following conditions:

Col A = Yearly Cost
Col B = The number of the month when the costs are starting (1=Jan etc)
Col C = The duration or the number of months for which the costs are to spread
Col D is Year 2013 with the months across columns D-O. Row 1 above those columns shows the month's corresponding number.

Right now I have =IF($B3<=D$1,$A3/$C3,0) however if my start month is 1 and my duration is 5, I need the costs to stop after May. I've attached a sample file. Calculate based on start month and duration.xlsx

View 3 Replies View Related

Generating List Of Project Parts Based On Project Duration And Time Window

Aug 4, 2014

I have a table of projects with 1) duration in year, 2) time window (number of years of our planning cycle), and 3) start year of the project. I want to generate a list of project parts of all projects where they may take place. This will serve as an input to an optimization program.

So a project of 2-year duration should have 2 parts over any year within the time window. I am including the "impossible" ones for my developer to tag them as "0" when we run it through his code.

View 5 Replies View Related







Copyrights 2005-15 www.BigResource.com, All rights reserved