Formula To Get Data Of Specified Period - More Actions For Each Day
Jan 15, 2014
I want know the formula for below issue. I have number of of actions done for each day for a month or more.
If I select a particular period for example 01jan14 to 10jan14 i want to get all actions done in this period.
View 2 Replies
ADVERTISEMENT
Feb 25, 2009
where exactly to add the code under Tools > Macro > VB editor.
My version: Office XP Pro ("2002")
The first code I need should be simple. I want Excel to copy cut delete files from the hardware, using data from a workbook.
There are 3 sheets:
1. "Names" - contains picture file names (without the JPG extence) in one column,
2. "From" - contains a cell with the original path to copycutdelete from
3. "Target" - has a cell with the target folder path (in case of copying/moving).
I made it in 3 sheets for making it user-friendly, since unskilled users will use the method.
I need to have 3 hyperlinks in the first sheet: "Move (cut)", "Copy", and "Delete", and by pressing the matching VB code eill be activated.
The second code should output (and print, if possible) data from a line to a pre-defind sheet.
Let's say there are 4 columns: picture file name, name of photographer, description of the photo, and the date it was taken.
There will be in the end of every line a cell with a hyperlink called "Output photo details" to output the data to specfic cells in the Print sheet (e.g. the date goes to D7, the name goes to A3, etc.). An important thing I wanna output is the picture itself (like from "Add > Picture" ment, in a location I define in the code.
View 9 Replies
View Related
Oct 9, 2011
I am trying to determine a formula to know a period time for example i started to test a unit at 10:20 am of 10/02/2011 and i would like to add 52 hours of test and i would like to know when and at what time will finish the test?
View 3 Replies
View Related
Dec 11, 2013
I'm exporting data from an access database into an Excel document and want to use the Sumifs formula to add up weights between a defined period (we have to show tonnages on a weekly basis).
The data and calculations are on a separate worksheets. The data looks like this:
[URL]
I'm trying to sum the data in column E based on the date range in column A and my formula is
=SUMIFS('Site CR'!E$5:E$5000,'Site CR'!A$5:A$5000,">01/11/2013",'Site CR'!A$5:A$5000,A5)
For some reason, my formula always returns 0 and I can't see why.
[URL]
View 4 Replies
View Related
May 18, 2012
Users copy and paste source data from a report into worksheet 1 each month. Data from last month is deleted and data for the current month copied into worksheet 1.
I am trying to write a formula within worksheet 1 to check that data for the current reporting period only is in worksheet 1. For example all data from last month's reporting period has been removed and the only data in worksheet 1 is the current reporting period.
Reporting period is shown in two columns Year and Period number (1 to 12).
View 4 Replies
View Related
Jul 10, 2013
Excel formula to calculate period between multiple dates.
Column A has first arrival
Column B has first departure
Column C has second arrival
Column D has second departure
Column E has third arrival
Column F has third departure
Column G has forth arrival
Column H has forth departure
Column I has fifth arrival
I need total period stay from all these columns.
View 3 Replies
View Related
Aug 2, 2014
My software is Excel for Mac 2011 version 14.4.3 (140616).
I am using the present value formula =PV(rate, nper, pmt, [fv], [type]), with the pmt expressed as a negative number, to determine the present value of a lump sum that would generate specific, equal, regular annual payments, exhausting itself in the process. I fill it in this way: rate is an annual rate, nper is the number of years the payments run, pmt is the annual amount paid each year, fv =0, type =1
I would like to be able to have a similar formula in Excel that would do the same thing except that it would take into account a time period where no payment is made, ie a "delay".
For example using the PV formula I know that if I have $49,019.96 invested at 1%, it will generate $10,000 per year for 5 years, leaving a net investment of 0. I would like to know the formula that would tell me how much I would need to invest at 1% to yield $10,000 per year for 5 years, again exhausting itself completely in the process, with the first $10,000 payment starting 3 years from now. I know it would be less because I would have the full amount earning interest for 3 years at 1% before any payments need to be made.
View 3 Replies
View Related
Aug 19, 2012
How to create the formula for dates formatted with periods.
Dates are as follows:
01.07.12 - should return as 1-Jul
01.08.12 - should return as 1-Aug
02.08.12 - should return as 2-Aug
View 4 Replies
View Related
Mar 27, 2014
I am writing a formula that will sum data for a 12 month period that is not based on a calendar year. For example may have data starting in June 2011 running to date, but not every month. If I set a start date for Year 1, say April 2012, I need to see Year 0 numbers (anything prior to April 2012), Year 1 numbers (April 2012 to March 2013), Year 2 numbers (April 2013 to March 2014), and so on. Date format is currently mmm-yy.
If this could be performed via a macro which references the database (spreadsheet), then even better. The database will contain multiple columns, of which two will contain the date and corresponding number respectively.
View 12 Replies
View Related
Jun 16, 2009
Need the formula to multiply monthly values with a maximum value in any one period? The sample file attached explains it better.
View 2 Replies
View Related
Aug 9, 2012
How to create a formula to determine the longer period of time between two date calculations and enter the longer period of time in the cell.
My Spreadsheet:
Cell M2: Birthdate (entered in cell as 11/1/2004)
Cell J2: Last date of service (entered in cell as 10/31/2011)
Cell G2: Calculation to enter the longer period of time between (M2 (year) + 21) and (J2 (year) + 7)
Example using information from above:
2004 + 21 = 2025
2011 + 7 = 2018
2025 is the result I want added to G2
If there is any way to include the month/year in G2 that would be ideal.
View 6 Replies
View Related
Jan 24, 2010
I'm trying to total data only up to the current period so I presume the answer lies in a =sum and index but I can't get it to work. The attached worksheet explains it better.
View 4 Replies
View Related
Jun 7, 2014
I am a flight instructor and legally we cannot work more than 8 hours in any consecutive 24 hour period. I'm trying to create a spreadsheet that will calculate the totals from that 24 hour period for me.
Right now I have something that sort of works, but not the way I would like it. I have a column for "time" that has the date and ending time of the flight and I am using that as if the total flight occurred at one moment (the ending time).
So, for instance let's say I did these flights
1: 8AM-10AM (2 hours, clocked at 10AM)
2: 11AM - 2 PM (2 hours, clocked at 2PM)
3: 7AM-9AM the following day (2 hours, clocked at 9AM)
If I have my formula calculate the time for 9AM the following day (totaling the past 24 hours) the first flight won't be included in the calculation since the hours from that flight is only imputed at 10AM. The formula would read 4 hours rather than the (actual) 5 hours.
Here is my workbook : 8 hour calculator sample.xlsx
Here are the formulas I am using
The time is formulated at date and time, with time being the ending flight time
The start time for the calculation is
[Code]....
end time is just =NOW()
Total calculation is
[Code] .....
All I'm trying to do is use the totals under "flight start" and "flight end" instead of the end flight time I had to put in under the date column.
View 9 Replies
View Related
Jan 18, 2014
I need to repeat the following two actions one after another therefore I cannot use F4 key
The actions are :
1) select some cells in two rows and colour them yellow.
2) select the last two cells of the rows ans merge them.
these are one after another where F4 will repeat only the 2nd step but I need the 1st step of colouring.
Are there any short cut keys or method or recording to repeat the above steps when necessary.
View 1 Replies
View Related
Jul 17, 2009
I have a list of petroleum accumulations with three types of data: Reservoir depth, Net Pay and Gas-oil ratio. for each accumulation, the number of reservoirs within each can vary. So I may have a accumulation with only one set of those stats, or an accumulation with 20.
I need the program to go down an alphabetized list (8000 entries long) and after every unique accumulation name average the values of the stats(which are in three separate columns) then put it in one row perhaps beginning in Column M or another sheet. So that I have a list of accumulations with the average of those stats, one entry per accumulation name.
View 5 Replies
View Related
Jul 3, 2014
I need to assign two actions to a one button.
1. action: Copy Column A, paste to Column C
2. Write time&date into G5
I am only capable of doing one button for each action using the macro recorder and simple code:
[Code] .....
View 2 Replies
View Related
Jul 15, 2014
I am working on trying to make a macro I wrote run faster, and I understand that one way to do this is to stop certain actions from occurring. However, I am having a hard time understanding what stops what, specifically among these:
[Code] ......
View 2 Replies
View Related
Sep 10, 2012
This Coding is correct for CheckBox49. This code Changes the Color of one Cell from Black to white and the cell below it from white to black...(its a dipswitch) when the check box is checked... When its unchecked it does the opposite....
Code:
' ACM 1 Switch 1
Private Sub CheckBox49_Click()
If CheckBox49.Value = True Then
Range("AC24").Select
With Selection.Interior
.Pattern = xlSolid
[Code] ........
Now what needs to happen is this.... I'd Like to have this Happen if checkx49 is checked...
Code:
Range("A1,K50,K51,R50,R51").Select
Range("R51").Activate
With Selection.Interior
.Pattern = xlSolid
[Code] .......
If Checkbox49 is unchecked do this... Put in D26 Reader Name? in Italics.
Code:
Range("K50,K51,R50,R51").Select
Range("R51").Activate
With Selection.Interior
.Pattern = xlNone
[Code] .........
Also...what ever information is entered in D23.
Put that in F50 with RDR at the end...
Whats in D23 Put in F51
Whats in D23 Put in M50 and concatenate with a space from cell U49
Whats in D23 Put in M51 and concatenate with a space from cell Y49
Lastly code to select K50, K51, R50, and R51...=Len whats in F50, F51, M50, and M51 when the box is checked...and dont len when the box is unchecked.
View 6 Replies
View Related
Feb 7, 2014
I am currently using a product formula in a cell and was wondering if I could add a round up/down action to numbers containing decimals? For example, let's say that my cell values are 300, 327.6 and 355.2 after using the product formula. Is it possible for those values to reflect 300, 328 and 355, respectively?
View 5 Replies
View Related
Oct 4, 2009
I need to insert code into an existing macro that does each of these two similar actions:
If a specified word is in the heading (row 1 cell) of a sheet, DELETE that column
If a specified word is in the heading (row 1 cell) of a sheet, BOLD that column.
View 9 Replies
View Related
Sep 20, 2007
Is there a structure inside of Excel which keeps track of all the actions taken by a user (something that would presumably be used to allow for an undo sequence)? If so, is there a way to get access to it?
View 2 Replies
View Related
Dec 30, 2009
I have a series of macros altering various workbooks and sheets. They're numbered Step1, Step2, etc. In my Step5 I have a series of Case statements in a macro, and I don't know how to get it to do what I want next. I have NOT tried running this code yet, and I'm sure I have something(s) wrong in it.
1) If the selection in DstWbk, sheet "Steps", is "01DSP" through "11DSP" the macro needs to delete specific columns in the SrcWbk, and then move to the next step (6).
2) If the selection in DstWbk, sheet "Steps", is "*DSP" the macro needs to go directly to the next step (6)
3) If the selection in DstWbk, sheet "Steps", is anything else the macro needs to flash a generic "No Data found" message and move on to Step7.
The part of the code that's throwing me begins at 'Select only the specific regional data' and ends at the "Case Else MsgBox"
View 3 Replies
View Related
Sep 26, 2013
I'm using a Private Sub Worksheet_Change(ByVal target As Range) macro on Worksheets(2) to perform certain actions when a selection from Worksheets(1) is pasted to Worksheets(2). Before ending the Worksheet_Change sub I'd like it to deselect the copied selection on Worksheets(1). I've tried to do this by selecting Worksheets(1) and moving the cursor, but VB ignores the "With Application.Worksheets(1)" instruction. Removing "Private" from the sub heading makes no difference.
Is it possible do this with a Worksheet_Change routine? If so, how?
View 7 Replies
View Related
Apr 28, 2009
I am trying to use following codes for a add-in utility so that user can enable or disable logging activity for a given workbook.
My problem is to how to add the following code to a new workbook so that "Loginfo" function could be activated. I have tried some application... based commands but it do not seem to be working.
View 6 Replies
View Related
May 2, 2009
I have made an class and created a file to log when user change value or insert formula in a sheet get recorded in a file C:Logme.csv. The problem is it is recording the value and formula at random i.e in some instances it records the value and in some instances it is not recording the value and formula in logme.csv . I am unable to figure out why this is happening?
View 3 Replies
View Related
Jun 15, 2009
Macro: the system monitors changes to the spreadsheet and then performs actions accordingly. Example: If the value of column c = Bug, then it sets the value of G to Celeste and Column H to Kewill.
Could this macro be changed so that instead of having to enter "Celeste" in this code, it could set the value of column G to the value found in H5 on the sheet?
I tried replacing "Celeste" in the code with H5 but it did not work.
Private Sub Worksheet_Change(ByVal Target As Range)
'Declare variable
Dim iCol As Integer
'Look at the column number of the changed cell (Target)
Select Case Target.Column
'Column C
Case 3
Select Case Target.Value
'if "Bug" set iCol to 3 (Red)and change value of column G to "Celeste" and Column H to "Kewill"
Case "Bug": iCol = 3
Target.Offset(, 4).Value = H5
Target.Offset(, 5).Value = "KWL"................
View 9 Replies
View Related
Jun 16, 2006
I wish to perform different actions depending on whether certain errors are present in a cell and I can't figure out how to do it.
Attempt (within some For loop):
othCell = ActiveCell.Offset(-95 - counter, 0)
If othCell = CVErr(xlErrNum) Then conditioncount = 0
This generates a "type mismatch" error. I also tried othCell.value in place of othCell on the second line; I don't really follow the distinction in usage for "value". I've also attempted this with Error 2036 in place of CVErr(xlErrNum). I don't know much at all about VBA!
View 2 Replies
View Related
Dec 8, 2006
I have written a macro which references to several different sheets and cells therein. The macro is assigned to a command button on 'Sheet 1'. When I click the command button, the screen flickers and the user can see the macro running all the commands I have written. Is there a way of stopping this - maybe replacing it with a static screen view whilst the macro runs?
View 3 Replies
View Related
Dec 23, 2008
I m trying to write a formula for my financial model. If anyone can take a stab at a solution. I'm trying to write a formula that will equally distribute revenue either over the next 1 month, 2 month or 3 month period depending on size of the deal.
Details:
Sales will fit in 1 of 3 categories. Less than 25k; between 25k & 100k; greater than 100k.
- if under $25K, recognize in next month (month N+ 1)
- $25K-100K, recognize in two equal parts in months N + 1 and N + 2
- over $100K, recognize in three equal parts over 3 months
N + 1, N + 2, N + 3 ...
View 4 Replies
View Related
Jul 10, 2014
I want to return a value based on once off time related data which is captured at 4 time periods throughout a day. I have another set of data which does not line up with this data but I want it to return the value closest earliest value.
Given this data:
27-6-14 3:00 12
27-6-14 7:00 18
27-6-14 11:00 19
If I have a time like 27-6-14 5:00 I want to return a value of 12 (Previous time). How would this be possible?
View 5 Replies
View Related