Excel formula to calculate period between multiple dates.
Column A has first arrival
Column B has first departure
Column C has second arrival
Column D has second departure
Column E has third arrival
Column F has third departure
Column G has forth arrival
Column H has forth departure
Column I has fifth arrival
I need total period stay from all these columns.
View 3 Replies
ADVERTISEMENT
Mar 8, 2013
I need also to calculate difference between dates(dd-mm-aaaa hh:mm) in workhours ( hh:mm):
The work period is 9-18 with lunch interval 13-14 The startdate and end date could be out of the work hours and i can't include the extra hours. I can have several days (workdays) at the difference, but i should maintain the format hh:mm.
Ex1:
Startdate 05-03-2013 18:34 ( date to calculation should be 05-03-2013 18:00)
end date 06-03-2013 10:30
Time Difference 1:30 ( from 9 to 10:30 of 06-03-2013 )
will be equal to:
Startdate 06-03-2013 8:34 ( date to calculation sould be 06-03-2013 9:00 )
end date 06-03-2013 10:30
Time Difference 1:30 ( from 9 to 10:30 of 06-03-2013 )
Ex2:
Startdate 06-03-2013 12:01
End date 06-03-2013 14:28
Time Difference 01:29
View 3 Replies
View Related
Sep 11, 2009
I need to determine a formula which will allow me to calculate a future date based upon a current date with varying time periods.
For example:
I have a bill which is paid on the 15th and last business day of each month. I would like to be able to see the next due date regardless of what day of the week it is.
I have a bill which is paid every other Tuesday. I would like to know the next due date without having to enter +14 for every due date in the future. In other words, it is preferable to be able to open the spreadsheet and automatically see the next due date, not use autofill to repeatedly add +14 to a previous date which would limit the # of future due dates that could be calculated.
I have a bill which is paid on the last business day of each month, not the last Friday of each month. I would need excel to return a value for the last day of the month which = Monday-Friday, regardless of what day of the week it may be as long as it isn't Saturday or Sunday(holiday exclusion would be nice but not required).
View 14 Replies
View Related
Aug 19, 2012
How to create the formula for dates formatted with periods.
Dates are as follows:
01.07.12 - should return as 1-Jul
01.08.12 - should return as 1-Aug
02.08.12 - should return as 2-Aug
View 4 Replies
View Related
Oct 7, 2008
I have a logbook which already uses a number of SUMIF formulas but have been trying to create one so that totals the number of hours flown in the above mentioned periods. I am attempting to copy the formula and then modify for the relevant column in this case: =SUM(IF(FlightDates<(TODAY()-90), 0, FlightLength))
FlightDates is the named range of the calender date in column A and FlightLength is the named range for total flying in column Z. However even though this forumla works in another situation e.g. tracking number of landings in the last 90 days, it comes up with an error.
View 3 Replies
View Related
Apr 28, 2009
how i would calculate the number of sickness days and occaisions in the previous 26 week period from todays date.
I've attached the spreadsheet.
So in C4 i want to have the total number of times(occasions) the person has been absent in the previous 26 weeks.
and in E4 i want to have the Total number of Days (taken from E7:E20) the person has been sick in the past 26 weeks
View 2 Replies
View Related
Aug 11, 2014
Is there a way to calculate an age based on Date of birth and current date?
View 3 Replies
View Related
Oct 18, 2013
Calculate dates as The Number Of Days, Months Or Years Between Two Dates
The two formulas I tried below show the wrong output when trying to figure the days between 12/8/2011 to 1/2/2012. It should show 0 years, 0 months, 24 days, not 138 days.
I did notice when the day of the month on the start date is before the day of the month of the end date, the formula seems to work. Ref. the second dates on the first example.
Example 1
Start End
12/8/2011 1/2/2012 = 0 years, 0 months, 138 days
Wrong display. should show 0 years, 0 months, 24 days
Start End
12/1/2011 1/2/2012 = 0 years, 1 months, 1 days
Note that when the start date "day", (1), is before the end date "day", (2) the formula seems to work.
First formula used above:
=DATEDIF(B3,C3-(MOD(B3,1)>MOD(C3,1)),"y")&" years, "&DATEDIF(B3,C3-(MOD(B3,1)>MOD(C3,1)),"ym")&" months, "&DATEDIF(B3,C3-(MOD(B3,1)>MOD(C3,1)),"md")&" days"
Example 2
Start End
12/8/2011 1/2/2012 = 0 years, 0 months, 138 days
Should show 0 years, 0 months, 24 days
Second formula tried above:
=DATEDIF(B10,C10,"y") & " years, " & DATEDIF(B10,C10,"ym") & " months, " & DATEDIF(B10,C10,"md") & " days"
View 2 Replies
View Related
Dec 6, 2006
I need to calculate a pay back period for a certain investment. Excel has options for NPV and IRR but not for the Pay back period. (PBP). I've tried finding a solution using google discussion groups and some books but nothing helped me out. attached you'll find an example of my sheet. I need the PBP to be calculated in e.g. 5,3 years. but when the figures change it should automaticly recalculate the PBP.
View 2 Replies
View Related
Jan 13, 2014
find the formula to calculate how many weeks between two dates for example. I how many weeks between
December 23, 2013
January 5, 2014 = 2w
January 6, 2014
January 19, 2014 =2w
January 20, 2014
February 2, 2014
View 2 Replies
View Related
Aug 1, 2013
I have a sheet i am working on at the moment, i basically have in Column A (named Interview Date) a date and in column Q (named Date Cleared) another date.
What i want is so when i enter a date in column Q if the date is 14 days or more after the date in column A it will highlight Blue and if the date is upto 14 days after the date in Column A it will highlght green.
View 2 Replies
View Related
Oct 7, 2009
i need a formula for which calculate all cell (calculating years months and days formula). FIND ATTACHED .xls file i need a answer in cell highlited in yellow color.
View 3 Replies
View Related
Mar 5, 2013
I am looking to calculate compound interest over a period of 10 years.
I am looking at putting a lump sum in at the beginning and contribute in monthly installments for the entire 10 years. How would I go about this.. I know there are formulas there, however I'm not a financial person at all..
View 9 Replies
View Related
Aug 7, 2007
attached is an example of a timesheet we use.
now after lengthy discussions the comany say its not 'in their interest' to use acess so i'm stuck with excel on this one.
I need to sum a column on many critiera, which i feel maybe a job for the trusty old =SUMPRODUCT. But thing is i need to sum a column based on a date range, Rate, Day.
I have manually typed in the number i think it should produce but as far as formulas go
1st off need to calcualte date range, which is situated on the top of the spreadsheet.
2nd some how tell the formula that Normal overtime is either classed as rate 1 Saturdays classed as 1.5 and sundays and bank holidays classed as 2.
View 3 Replies
View Related
May 14, 2009
I am creating a timesheet using excel 2003 users enter their shift start/finish time and a break start/finish time. Emplyee's can work night shifts (ie across midnight).
There are penalty rates which apply at different times. I need to be able to work out the amount of worked time that fits into a certain time period. eg. 10pm-7.30am, 7.30am-10pm.
I have a solution based on A clever formula from Daniel Maher that will calculate time within a period. But it doesn't work when the shift goes over two days.
I have attached a spreadsheet to help show the problem .......
View 12 Replies
View Related
Mar 6, 2014
I am trying to calculate the average start time for a machine over a period. However the machine start time varies from 10:00 pm to past midnight. I have tried reviewing past posts but cannot seem to find a similar query.
View 13 Replies
View Related
Jan 4, 2013
I have a Training Matrix with "Main", "Leavers" and "Reports" sheets. (can email it but can't upload it here; it's 534kb and I can't make it smaller)
In the "Reports" sheet I need to fill "Site Procedural Training" - "Number of people trained in period".
The periods are :
25/12/11 - 31/03/12
01/04/12 - 30/06/12
01/07/12 - 29/09/12
30/09/12 - 29/12/12
The source of data will be the "Main" and "Leavers". The data are dates in these sheets; each date = 1
The formula needs to look in to "Main" and "Leavers" and if it finds a date which fits in the required period in "Reports" then return it as 1. If it finds 300 dates then returns 300.
View 9 Replies
View Related
Mar 19, 2014
I have two date columns, a start date and end date. Another columns tells me the number of days between these two columns. It may return 45 days which actually straddle 3 different months.
My aim is to identify between this date range how many days in Apr 14. Then in the next column howmany days in May 14 etc
So on the spreadsheet Id have 12 columns for each month of the year. in Apr 14 for each row between the given date range I want it to tell me how many days are actually in April. Id then copy that formula into the May 14 column.
View 1 Replies
View Related
Jan 28, 2009
I'm trying to make a formula to calculate the difference in a date between two dates. For exaple, in my business we have a due day for something. So the due date could be Feb 10, we need to know if it was done on time, late, or early. So I've gotten it to display late by doing this: =IF(B2>A2, "Late", (A2-B2)) But then I can't figure out how to incorporate this: =IF(B2=A2, "On Time") or =IF(B2<A2, "Early").
I would like to displaly this all in one cell. So if the due date is Feb 10 and it's turned in Feb 8 it's early, turned in Feb 10 it says on time, turned in Feb 11 it's late. I also tried this but it didn't work: =OR(IF(B2>A2,"Late")*IF(B2=A2,"On Time")*IF(B2<A2,"Early"))
View 3 Replies
View Related
Nov 22, 2011
I'm using Excel 2003 & Windows XP Professional.
I have two sets of data tables. One contains Number, Name & Date. The other contains amounts which those people have paid in 2007, 2008, 2009 & 2010. So in the below Jones has paid a total of $580 over those years, Smith has paid a total of $650 over those dates & so on.
The amounts in 2007, 2008 etc are full year amounts. I'm after a formula that can calculate the amounts for part years based on the dates from C1 to C11 by number (or name).
I've got what I think the results should be (I think with some rounding problems), but my real data has much more data.
View 3 Replies
View Related
Feb 9, 2007
I currently have an Excel payroll extract that populates a start date and end date via the calender control 11 user form.
What I have found out is I need to inject some sanity to this application. I can not have users select days that are outside of a pay period.
The users should only be able to select the first or the 16th of the month for a pay period start. Then they can only select the 15th or the 28th/31st for the pay period end.
What I am trying to do is have them select the month and the pay period start date, then the end date would automaticly be selected. But I don't want to have to create a bunch of loops to counter for the differing month end dates or leap years.
View 9 Replies
View Related
May 4, 2007
Column A is the COB Date Column B through N are various stock data. I would like to calculate the trend of correlations over a 4 year period. I can't seem to figure out how to manipulate the data analysis tool pak to do this.
View 3 Replies
View Related
Aug 6, 2014
I've got a spreadsheet where the start date is amendable and this is what I wanted. E.g. start date is Jun-14 and I want the formula to to calculate annual salary divided by 12 in each month from June onwards until Mar-15 (Financial year is April to Mar) and the same way to not show anything in April or May as they started in June... How can i achieve this please as I tried IF statements and it doesn't recognise dates and years...
Link: [URL] ....
View 1 Replies
View Related
Jul 5, 2007
I'm trying to calculate the number of days between dates in column A and B. I've looked at the examples in this site and thought I used the formula correctly, but the cell returns an error message when I type: =DATEDIF(A1,B1,"D")
View 7 Replies
View Related
Jul 11, 2014
I have a hotel room schedule of up to 1,000 rows. Each row is a different room, each column representing a different day of the year. Each cell in a row either has the surname of a guest for that particular day, or the word "Available" to indicate no guest is occupying that room on that day.
analysing each room's occupancy and availability periods over the year. i.e.
- what day(s) a guest occupied and vacated a room,
- what day(s) a another guest then occupied and vacated that room, or
- what day(s) it was then "Available" from
The dates of occupancy are needed in case the guest queries the period.
Parameters
- All 365 days of the year are used - irrespective of holidays/ weekends - the room will either be occupied or available - The day after a guest leaves, it will automatically become available until unless another guest occupies it - The same guest may use a room more than once in a year. This will need to be shown as a unique occurrence, not accumulative
Design
- A1:A1000 is a list of room numbers
- B1:NB1 are all 365 days of the year regardless of weekends/ holidays
- Every cell has either the surname of the guest or the word "Available"
- The results of the analysis can be on another worksheet
Sample I have attached a scaled down sample of what I'm after. Row 1 has the dates starting from 30 April 2013 to 23 May 2013. Room numbers in Column A. C10:D26 are samples for the analysis I'm after. I've randomly chosen Room 100 and Room 500. Room 500 has Mr Mathews staying 4 times.
View 5 Replies
View Related
Oct 1, 2006
I have a long list or work items that I track on a log on daily basis.Some work items are repeated twice or trice to input a certain comment.Therefore, when I try to calculate the total number of work items for the day using counta formula, if results in an inaccurate total since certain work items are repeated twice or trice. The work items consist of a 8 digit number.Example 8876098.
View 4 Replies
View Related
Jan 15, 2014
I want know the formula for below issue. I have number of of actions done for each day for a month or more.
If I select a particular period for example 01jan14 to 10jan14 i want to get all actions done in this period.
View 2 Replies
View Related
Oct 9, 2011
I am trying to determine a formula to know a period time for example i started to test a unit at 10:20 am of 10/02/2011 and i would like to add 52 hours of test and i would like to know when and at what time will finish the test?
View 3 Replies
View Related
Dec 11, 2013
I'm exporting data from an access database into an Excel document and want to use the Sumifs formula to add up weights between a defined period (we have to show tonnages on a weekly basis).
The data and calculations are on a separate worksheets. The data looks like this:
[URL]
I'm trying to sum the data in column E based on the date range in column A and my formula is
=SUMIFS('Site CR'!E$5:E$5000,'Site CR'!A$5:A$5000,">01/11/2013",'Site CR'!A$5:A$5000,A5)
For some reason, my formula always returns 0 and I can't see why.
[URL]
View 4 Replies
View Related
May 18, 2012
Users copy and paste source data from a report into worksheet 1 each month. Data from last month is deleted and data for the current month copied into worksheet 1.
I am trying to write a formula within worksheet 1 to check that data for the current reporting period only is in worksheet 1. For example all data from last month's reporting period has been removed and the only data in worksheet 1 is the current reporting period.
Reporting period is shown in two columns Year and Period number (1 to 12).
View 4 Replies