Generate Workdays For 1996 And Forward

Jul 11, 2009

i am trying to determine how to use the workday function to generate only workdays for 1996 and forward. Each year is listed in a separate column.

View 9 Replies


ADVERTISEMENT

How To Carry Last Entry Forward

Apr 30, 2012

below fig 1 is a part of a worksheet we are using for Stock. The idea is to track stock write downs on a yearly basis. Where I am struggling is a formula to carry the stock balance and value forward if there has been no movement in a given year.

The enteries in green (fig1) colums "Stk Forw" & "Car Fwr" represent how I would like the info to look.

Is there a formula that could look for the last entry in "Stk In/Out" if the column "YTD to date" is empty and carry that value forward to the next row.

I Would also need a formula to sum the Total & Car Fwr colums as one total.

Fig 2 Shows the formula I am currenlty using.

View 1 Replies View Related

VB Backward & Forward Loop

Dec 17, 2008

I'm writing a VB macro that will find the start time and finish time of a job and then work out the time it took to run.

So for example:
D E
09:53 wsp285A 09:53 wsp285A 09:53 wsp285A 09:53 wsp285A 09:53 wsp285A 09:59 wsp285A 09:59 wsp285A 10:06 wsp285A 10:06 wsp285A 10:13 wsp285A 10:13 wsp285A 10:20 wsp285A 10:20 wsp285A 10:26 wsp285A 10:26 wsp470a 10:29 wsp470A 10:29 wsp470A10:29 wsp470A 10:29 wsp470A 10:29 wsp470A 10:29 wsp470A

In the above I want to work our how long job 285A takes, I will need to find the first instance of the job by looping forwards through the data, and the last instance by looping backwards, then taking the last time away from the first.

The only problem is, I have no idea how to write this in VB!!

The job name is always in column E
The time is always in column D
I want to paste the time taken in for arguments sake in cell E1 of the current worksheet

View 9 Replies View Related

Carry Forward Balance In Excel Using Template

Mar 12, 2013

I want to make a template in excel. Lets assume I have Opening Balance in A1 and closing balance in B1. How do I make template make new sheet and every time I make new sheets it should take the closing balance of the previous sheet as the opening balance and so on and so forth. But the very first sheet needs to have the opening balance as unlocked cell but the rest of them needs to be locked.

View 7 Replies View Related

Pull Forward The Dates By 3 Or 5 Working Days

Apr 15, 2009

I have a spreadsheet stating a date that my company will deliver a product by but due to a set of certain circumstances we need to pull forward the dates by 3 or 5 working days. Basically it needs to show the dates below but minus 3 days unless this includes non-working days (i.e. weekends)

01/01/10
02/01/10
03/01/10
04/01/10
05/01/10
06/01/10
07/01/10
08/01/10
09/01/10
10/01/10

View 3 Replies View Related

Format To Bring Decimal Point Forward

Aug 22, 2008

Is there anyway to be able to bring decimal point forward without affecting the numbers using any formatting, which will still be there even after refreshing the query.

For example, 0.0531 to 53.1

View 9 Replies View Related

Roll Sequential Numbers Back & Forward

Jan 28, 2008

I am running a worksheet that runs through 4 week periods.

Example: 10.1 10.2 10.3 10.4 11.1 11.2 11.3 etc.

I wish to insert a formula that will roll forward or back this data when required.

I have no problem rolling whole numbers & dates.

Iam using Excel 2000.

View 7 Replies View Related

Formula To Extract All Characters After A Certain Number Of Forward Slashes From The Right?

Apr 9, 2014

I'm working with a large list of items of varying length. A sample worksheet is attached. I need to do the following:

1) If the characters after the final forward slash from the right are of the pattern "tttxxx" (where "t" is text and "x" is a number/digit), then return all characters to the right of the final slash, including the slash itself:

Y:/Series/hun/hun109 ----> /hun109

2) if the characters after the final slash from the right are not of the pattern "tttxxx", then return all characters after the second slash from the right, including the slash:

Z:/Series/crd/crd409/editorial ----> /crd409/editorial

3) if there are less than 3 backslashes in the item, return a blank.

View 3 Replies View Related

ListBox: Insert New Columns List Moves Forward

Feb 2, 2009

I have 2 Listbox in Sheet3 & lists in Sheet1 & Sheet2 in columns A:A. When I delete columns in this Sheets or insert new columns List moves forward i.e. But I need The ListBox show allways List in the Columns A:A.

View 4 Replies View Related

Calculating Current Cover Based On Forward Requirements

Nov 17, 2007

I have drawn up a simple summary to show what I am trying to achieve: ...

View 9 Replies View Related

Running VB Code: Sheets Flicking Backward And Forward Many Times

May 8, 2007

when I run the code, because I have used many "Sheets("SheetNameHere").Select", the user will see the sheets flicking backward and forward many times and to avoid confusion, I don't want them to think "what the hell!"

Is there a way where I can still activate the sheets needed, but to somehow run all of "the code" in the background so all the user see's is maybe a status box or something which says "Please wait..."

View 9 Replies View Related

How To Subtract / Add Days / Months Using Borrow / Carry Forward To Previous Cells

Dec 8, 2013

I have subtracted two dates from B2 & B1 using DATEDIF() Function and the results are available in (B5) Year, (C5) Month and (D5) Days respectively. Now the problem is how to Subtract, Add days & Months using borrow, Carry forward to the previous cells (I need formula, function for the above). I have to take 30 days from month ie in C5 if the days (D5

View 1 Replies View Related

Formula To Change Ie 1995 - 1997 To 1995, 1996, 1997

Feb 19, 2010

I have 4000 lines with car make, model, year as the column headings in MS Excel. The years are formatted as 1995 - 1997 (for example). But my website CMS requires the years to be formatted as 1995, 1996, 1997 in order to properly upload. Each of the lines has a different year period.

Is there a function that I can apply to these 4000 lines to change the format? I have a feeling concatenate is involved but can't figure out how to create a formula that knows when to stop after it has reached the final year.

View 11 Replies View Related

VBA To Add Workdays To Datetxtbox

Mar 26, 2014

I have a userform that captures dates and records them to another excel workbook so we can analyse the data. I have one last part to finalise; When a date is added to the "daterecievedtxtbox" I would like a formula to be offset to the end of the spreadsheet, that will take this date and add 3 working days to it. Then I can add in some formulas later to flag them when the date passes the 3 working days.

At the moment I have this:

[Code] ....

Which adds 3 days to this txtbox and writes it to the sheet that I have defined. I would like to know if there is a function that I can use to add 3 WORKING days to this, excluding saturday and sunday.

View 4 Replies View Related

Workdays In A Month

Oct 28, 2009

I would like to know how to get the number of working days in a month based on the date in B4 which is formatted as "mmmm".
So if B4 was October the result would be 22 regardless of the actual date in B4.

I also have a named range "Holidays" for UK bank holidays (ready for December) that I would like included within the formula.

View 9 Replies View Related

Calculate The Number Of Workdays?

Jan 2, 2014

I need a way to calculate the number of workdays, Saturdays and Sundays in a month.

In my model, the client can choose to work on Saturdays and/or Sundays.I need someway to show that a given month (e.g. June 2014) has some # of workdays, and some # of Saturdays and some # of Sundays.I can do this on three separate rows.
eg.

Row 1: Month
Row 2: Wordays
Row 3: Saturdays
Row 4: Sundays

Still i need some way of determining that a given month (June 2014) has 22 work days, 4 Saturdays and 5 Sundays,... et cetera

View 4 Replies View Related

Subtracting Workdays From A Set Date

May 13, 2009

I am using excel 2003 and I am trying to subtract 20 days from the date in cell A3 in order to give me a date for me to order materials. However all I get is #NAME? in the cell.

View 4 Replies View Related

Filter For Workdays Returns Nothing

Jul 9, 2014

I am looking to find a way to filter a list for the next twenty business days.

View 7 Replies View Related

Net Workdays Cycle Time?

Dec 3, 2013

So I have a cycle time formula; Start Date to Completion Date, if the task is not complete the completion date field is blank. In this case the cycle time is listed as a negative 5 digit value. The networkdays formula takes into consideration weekends and holidays.How can this field be left blank rather than the negative value?

=NETWORKDAYS(I2,P2,Sheet3!$A$2:$A$10)

View 6 Replies View Related

Add Workdays To Date And Time

Jul 3, 2014

I have data in column C which is the date and time

Data is: 16/06/2014 09:47:14
Cells are formatted as dd/mm/yyyy" "hh:mm:ss

Column H has another date and time based on service level agreements

Data is 17/06/2014 09:47:14
Cells are formatted as dd/mm/yyyy" "hh:mm:ss

I need to add 3 workdays to the 1st value so it returns 19/06/2014 09:47:14

I've used the following formula =WORKDAY(C2,3) and it returns the correct date but time shows as 00:00:00. Is there way I can pick up the time from Cell C2?

View 2 Replies View Related

Display How Many Workdays There Are In A Month

Oct 18, 2007

What formula would I use to display how many workdays there are in a month.

The month is displayed in cell A1

View 9 Replies View Related

Conditional Formatting With Workdays

Sep 7, 2008

I have an excel file I am working on with a due date column. I have already created 2 conditional formatting.

1. if cell value is less than today's date then format the cell red
2. if cell value equals today's date then format the cell orange

I need to create two more conditional format....one where it looks at today's date and if the due date date cell is within 1-3 business days from today's date then I want the cell format to turn yellow and I need a last conditional format to look at today's date again and if the due date cell is within 4 -5 business days from today's date then I want the cell format to turn green. Can these two additional conditional formats be done?

View 9 Replies View Related

Calculate Workdays Between Dates

Nov 2, 2006

I am trying to map the total networkdays across the months of the year for a list of contracts with variable start and end dates.

Example of the results I'm after:

Contract StartDate EndDate January February March etc.
Contract1 15 Jan 07 13 Jul 07 13 20 20
Contract2 5 Feb 07 2 Mar 07 0 18 2


I assume that the add-in NETWORKDAYS function is involved (and I'm ordinarily comfortable with using this function with only two dates and my named range of holiday dates), but I can't seem to figure out how to use it in this more complicated way. My own extensive struggles with it have led to ridiculously long and nested formulas that even I didn't understand after a few days away from them. I've searched the posts and seen questions similar to mine, but not close enough to give me a solution.

View 4 Replies View Related

Difference Between 2 Dates In Workdays Only

Mar 4, 2008

I need to calculate the difference between two work days to understand how many days late we missed a due date. The NETWORKDAYS formula gives me the COUNT of the workdays, but I need the difference.

Example 1:
Expected Due date: 3/3/08
Actual Due date: 3/3/08

NETWORKDAYS for the dates above gives me the value of 1, but for my needs I need the resulting value to be zero.

Example 2:
Expected Due date: 3/3/08
Actual Due date: 3/5/08

NETWORKDAYS for example 2 provides a value of -3 (days late), but in reality it's only -2 (days late)

View 7 Replies View Related

Subtract Number Of Workdays From A Date

Feb 26, 2014

I am looking for a formula which substract a number of workdays defined in a cell from a date defined i nanother cell. For example I have a date in cell B2: 10.08.2014 - this is the due date for service delivery. In cell C2 there is a number of workdays: 84 - this is the duration for the delivery process. I would like to have a formula calculating in cell D2 the date when the delivery process has to start. The tricky point is that B2 is basicly a range of merged cells B2:B6. As an example I am attaching an exmple sheet.

View 10 Replies View Related

Count Workdays Between 2 Date Cells

Sep 4, 2009

I would require a formula to count the amount of workdays between cell a1 and cell a2. Assume formula is in celll a3 and both a1 and a2 are date formated.

View 2 Replies View Related

Calculate Workdays - Completion Date

Dec 26, 2012

I have the following function:

=IF(G13="",IF(H13>1,1,IF(G13>1,workdays(H13,G13,Holidays))))

The intent is to calculate the completion date against the assigned date as follows:

G13 - Typically the assign date but sometimes can be blank because someone forgets or doesn't bother to insert

For this example, let's say: 12/17/12

H13 - Completion date

For this example, let's say: 12/20/12

I'm expecting a result of '3' for 3 days

The first half of the function is intended to calculate 1 day if G13 is blank or not defined. However, when I have dates in both cells, I'm getting a "false" answer instead of a numerical value that I'm expecting.

In our workplace, we do work weekends & sometimes 7 days a week.

View 11 Replies View Related

VBA Function For Abbreviated Workdays In Cell?

Dec 6, 2013

I need a VBA Function, I have a start dates in column A and end dates in column B what I need in column C is the abbreviated days excluding the weekends. For example if I have 11/11/13 in A1 and 11/20/13 in B1 then in C1 I need (including start and end date) Wed, Thu, Fri, Mon, Tue, Wed, Thu, Fri. Another example If I have 11/29/13 in A1and 12/3/13 in B1 then in C1 I need Fri, Mon, Tue.

View 4 Replies View Related

Calculating Number Of Workdays In A Month

Jan 13, 2014

In cell A1 I have a date 1/1/14

I need to get the number of business days for the month that is entered in the cell. I tried NETWORKDAY formula but needs a start and end date.

View 3 Replies View Related

Workdays Function & Logical IF OR Formula

Aug 8, 2007

what was wrong with this formula, an error message comes up saying VALUE, im trying to get the formula to say that - If 2 dates are different then subtract one from the other to get a number of working days, but if the dates are both the same then to -1 from the value as for some reason the value is coming back as 2 when it should be 0?

=IF(OR(M17>0,N17>0),NETWORKDAYS(M17,N17,holidays)+1+Q17,IF(OR(M17=N17),NETWORKDAYS(M17,N17,holidays)-1,0))

View 9 Replies View Related







Copyrights 2005-15 www.BigResource.com, All rights reserved