NET WORK DAYS Between 1 Fixed And 1 Variable Date

Apr 7, 2008

Im wanting to calculate then no of days between 2 dates. The first one is variable.

Date 1: (Contract start date) Either the date entered in a cell A1, or 01/04/2008 - whichever is later

Date 2: (Contract end date) Date entered in cell A2.

example 1:

Date 1 = 1/1/8
Date 2 = 31/12/8

In the above example i would want the calculation to work out the n o. of working days between 1/4/8 and 31/12/8

example 2:

Date 1 = 1/5/8
Date 2 = 31/12/8

In the above example i would want the calculation to work out the n o. of working days between 1/5/8 and 31/12/8


This will allow me to calculate the number of contract days in this financial year, even if date 1 was in last financial year.

View 10 Replies


ADVERTISEMENT

Difference Between 2 Dates, Incl Weekends, With Variable Work Days

Jul 11, 2006

I am creating a problem report spreadsheet for work. In col C I have a date/time that the problem started, eg, 23-Jun-2006 15:20 and in col D I have a date/time for when the problem was resolved, eg, 26-Jun-2006 15:40. I need to calculate the amount of hours that we were not available for use (due to the problem). This is based on a list of available hours. Eg, on Mondays we are available 19.5 hrs, T-F 22.5 hrs, Sa 14.5 hrs, and Sun 0 hrs.

If I do a straight subtraction, it uses 24 hrs for each day - not taking into account our available hrs. If I do NETWORKDAYS it automatically doesn't consider Sat or Sun - and i need it to - and it does have a DayEnd and DayStart but it assumes they are constants. I found the day corresponding to the date and thought I could determine the series of days between it, e.g., if the start day was Friday & the end day Monday, the series in between is Sat & Sun. Then I could do a lookup on all 4 days in a table & add them all together. But I can't figure out how to do this!

View 4 Replies View Related

Date In Cell - Adding Work Days

Nov 11, 2011

I have a date in A2 7th Nov 2011

Column B is number weeks until next appointment - 4.
Column C is the answer Friday 2nd December if the normal result is a Saturday or Sunday then use Friday.

View 9 Replies View Related

Subtact X Days From Date Variable & Retain Leading Zero

Jan 12, 2008

I am trying to insert a leading zero for single digits. A3 contains a date, i.e. 01/10/08


d = Range("A3")
dDay = Format(d, "dd")
'The result is '10'

dPrevDay = dDay - 1
'The result is '9'

dPrevDay = Format(dDay - 1, "dd")
'I anticipated the result of this to be '09', but it is '08'

How do I get the result of '09'?

View 7 Replies View Related

Calculate End Date Using Start Date And Number Of Days Excluding Specific Days

Nov 22, 2013

I want to calculate the end date of my German courses. This is how it works:

A course consists of 60 LU*. The course can occur i. e. three times a week: Monday, Wednesday and Friday. In each day the course lasts 2 LU, which means 6 LU each week. There is no course on Tuesday, Thursday, Saturday, Sunday and on holidays. Therefore this type of course that begins on 18-Nov-2013 will end on 03-Feb-2014.

Another course which occurs Tuesday, Thursday and Saturday, and respectively has 2 LU on Tuesday, 2 LU on Thursday and 3 LU on Saturday and starts on 03-Dec-2013 will end on 06-Feb-2014.

Therefore I want to create a worksheet where I set the start date, choose the days and respectively the LU amount on those days. The end date shall be calculated according to these criteria.

The workday function on excel cannot do this and I do not have any programming skills to work with VBA.

Legend:
*LU = lesson units; 1 LU is 45 minutes

Holidays:
28-Nov-13
29-Nov-13
08-Dec-13
09-Dec-13
25-Dec-13
31-Dec-13
01-Jan-14

[Code] ...........

View 7 Replies View Related

Switch Between Variable & Fixed Spreadsheets

Jul 20, 2007

Trying to copy certain cells from a spreadsheet (this varies) to a fixed spreadsheet.

I copy 3 values plus a range of cells from the variable spreadsheet to a fixed one.

I have done one big macro that runs 5 smaller macros (using code from this brilliant forum).

as follows: ....

View 6 Replies View Related

VBA Count File Which Modified Date Matches Fixed Date

Jan 9, 2014

I've written a Function which will count the number of files in a folder which the modified date equals a fixed date

For example, here, I want the file count which modified date = 01.01.2014

Code:
Function FileCountDate(Path As String, FileType As String) As Long

Dim strTemp As String
Dim lngCount As Long

Application.Volatile
strTemp = Dir(Path & FileType)
Do While strTemp ""

[Code] ......

However I got a #VALUE! error message with this formula:

=FileCountDate("C:Usersjohn.doeDesktopTEST","*")

In the TEST folder there are 4 pdf files so it should return the value of 4.

View 2 Replies View Related

Fixed Date: Lock The Date To The Initial Date

Oct 13, 2009

i would like to use the formula "now()" to establish a date in a document. is it possible to lock this date to the initial date? (so when the document is created the date won't change the next day)

View 2 Replies View Related

Count How Many Days Coming Due Within 90 Days Of Each Date Based On Today Function

May 27, 2012

There are dates in column C and I need to count how many days are coming due within 90 days of each date based on the today() function but do not exceed the 90 days.

Countif Today()+90

View 5 Replies View Related

Excel 2007 :: Count Number Of Days Between Two Date Where Off Days Are Friday / Saturday And Holiday

Mar 14, 2014

I am making process TAT(Turn Around Time) which required following information. In Excel 2007.

1-Count number of days between two dates where working days are (Sun to Thursday). So required to exclude (Friday,Sat + Holidays)

A1-Start Date Mar/01/2014
B1-End Date Mar/31/2014
C1-No Of Days 22
D1-Days between two dates 21
E1 To E10-Holidays

2-Count number of days between two dates where working days are (Sat to Thursday). So required to exclude (Friday + Holidays)

A1-Start Date Mar/01/2014
B1-End Date Mar/31/2014
C1-No Of Days 27
D1-Days between two dates 26
E1 To E10-Holidays

Note : Any weekend (off days) dates listed in holidays should not effect the query.

View 9 Replies View Related

Count No Of Work Days In A Month

Oct 10, 2007

How do i count no of days in a month; excluding saturday & sunday.

View 14 Replies View Related

Calculate Work Days Between 2 Dates

Sep 14, 2006

i have a few fields with dates in my excel sheet. I also have a field, where i want to automatically insert the business day between two other date-fields! Business date means days without the weekend and public holiday! Is it possible to do that? how?

View 9 Replies View Related

Days Since Count To Work Correcty

May 27, 2007

I'm having trouble getting the days since count to work correcty. It works fine when only counting the number of days that have elpases between a number being drawn in a lottery draw (Main numbers Only), and it being drawn again as a main number. However if I try to include the bonus ball into this count, it just returns an error. I've tried altering the old code, but I can't get it right. I've included 2 old codes as an example. Sorry I can't include the full programme as it's huge, way to big for this forum.

View 3 Replies View Related

Determine Work Days Between 2 Dates

Mar 13, 2008

My workday function doesnt seem to be working correctly, it is including weekends.

My Spreadsheet is like this
A1= 01/01/2008 ( Date)
A2= 30
A3= =WORKDAY(A1+A2,0)

I am expecting the result to be 11/02/2008, but i am getting 31/01/2008.

View 3 Replies View Related

Get The Date Filtered From A Fixed Date Until Today()

Feb 3, 2009

Im trying to get the date filtered from a fixed date until Today(), but Im struggling to incorp it into the vba code....

View 9 Replies View Related

Calulate Next 4 Work Days Not Weekends/holidays

Jun 21, 2006

I have a date in a cell and need a formula that will calulate the next 4 days excluding weekends and holidays. I have search and found where one can do more complex items but not just a simple formula. I have attached an example.

View 2 Replies View Related

Work Days And Hours Between Two Dates & Times

Apr 7, 2008

I am creating a 'HelpDesk Issue Logger' and I am trying to calculate the Network Days and Network Hours between two dates with times. I want to know how many business days and hours are between the two days to give me a TURE 'Response Time.'

I have been to several sites and forums looking for the answer, but I have not been able to find a solutions that works for me. Please find attached a 'stripped' down version of my project.

Variables:
- 'Date Received' (H11)
- 'Date Actioned.' (I11)
-'Response Time' (K11)

Constants:
Work Days = Monday to Friday
Work Hrs = 8:30 AM to 5:30 PM (no lunch break)
Public Holidays = (AC13:AC30)

Formats:
Date Received: dd/mm/yyyy hh:mm AM/PM
Date Actioned: dd/mm/yyyy hh:mm AM/PM
Response Time: d - hh:mm

If there is someone out there wiling to put me out of my missery with this one, you will have a friend for life.

View 9 Replies View Related

Displaying Work Days Excl. Public Holidays

Jan 2, 2008

way to get a worksheet to display workdays that exclude public holidays? I have used the Workday() function, but this keeps displaying the date over xmas. Is there an easy way to do this?

View 9 Replies View Related

Subtract Two Dates To Get Number Of Week Days - Networkdays Does Not Work

Dec 10, 2013

I am trying to find a formula that will return the number of week days between two dates. My specific situation is that my job sets up work orders (WO) to be completed by our staff. We have 3 dates - the date the WO was created, the date the WO is due to be completed, and the date the WO was actually completed.

I would like to subtract the Complete date from the Due date. Generally, this should always equal zero because our staff should be completing WOs on the due date! But obviously that doesn't always happen. There are times that they complete them late, and times they complete them early (yay!).

The problem with NETWORKDAYS is that even when they are completed on time, the result is 1. This formula counts instead of subtracts. I adjusted the formula to =NETWORKDAYS(A3,A4)-1 which works fine for those WOs completed on time or completed late. But for those completed early, it adds (or subtracts, really) 2 days. So for a WO completed a day early, instead of it showing -1, it shows -3. I've attached an example of WOs and the NETWORKDAYS formula I've used so you can see.

Subtract Days.xls

I'm really looking for something that will subtract week days, not count them.

View 3 Replies View Related

Work Schedule: Insert The Numbers 1-6 Into The Spreadsheet Throughout The 14 Days For Each Employee

Oct 7, 2009

I developed a 14-day work schedule and I assigned each different job position a number. The different job positions are numbered 1-6 and are as follows: #1=5:30am-1:30pm, #2=6:00am-2:00pm, #3=9:30am-1:30pm, #4=12:00pm-8:00pm, #5=1:00pm-8:00pm & #6=6:00pm-8:00pm. Numbers 1,2,4,5 clock-out for a 30 minute lunch break, while the other numbers do not.

My goal is to insert the numbers 1-6 into the spreadsheet throughout the 14 days for each employee, and have Excel calculate the total number of hours for each employee in the far right column. I would also like "V" & "H" to equal 7.5 hours. This would save a lot of time instead of going through and adding up the hours with a calculator

View 3 Replies View Related

Convert Dates To One Fixed Date?

Jul 16, 2013

i have messed up column A which has only dates and i have different date formats like 03/07/2013 and 07/03/2013 i need to have a fixed date for all in B like 03 July 2013

View 2 Replies View Related

Formula Result Which Is Fixed After A Certain Date/time

May 21, 2007

way to get a formula result to freeze or remain unchanged AFTER a certain time?

I tried using a macro which runs when the file is opened and does a crude 'copy/paste values' operation and replaces the Formula results with their values, but its is not very 'nice'!

I need a table to change a pattern of values but not in the past, but still to remember what that value was....!

View 9 Replies View Related

How To Auto-Populate Date Range (working Days Only) From Start Date And End Date

May 25, 2014

I am now trying to create a excel macro to auto populate all the dates with reference to a start date and end date. The catch is that only working days are required in the range. My reference cells (start and end date) are in Sheet 1 while the destination cell range are in Sheet 2. The reason for creating a macro instead of a function is that the intervals between the start date and end date changes frequently (annual, semi-annual and quarterly) Best case scenario would be a button which I can just press after i input the dates to generate the range of dates in another sheet.

View 1 Replies View Related

Public Variable Not Work

Feb 17, 2007

I read the Excel VBA Variables Scope and Lifetime info, but I still don't understand b/c of the statement "It's value is retained unless the Workbook closes or the End Statement is used." Which "End Statement"?

I want to fill an array in a form module, then later use those values in a different form module. If I declare the public variable in a standard module, I know any of the modules can access it, but will it retain its value after form1 is no longer running?

If not, do I need to involve a class somehow? I know nothing about classes except that their variables retain their values as long as any of the members is running.

View 9 Replies View Related

Date Countdown: Results Of The Number Of Days Between Today And A Future Date

Apr 8, 2009

I am trying to get the results of the number of days between today and a future date. I am using ="cell containing futuredate"-today() and it gets me the correct number of days. The problem comes in when I have yet to populate the future dates. I am getting -39991 (numeric value between today and jan 01 01) and because I am also using conditional formatting this is even more of a problem. Is there a way get excel to display nothing if it is a negative number? or to give a specified resut if the number becomes negative such as Expired or something of that nature?

View 3 Replies View Related

Calculate The Number Of Days From A Date Entered Into Cell A1 To Today's Date

May 19, 2009

I need a formula that will calculate the number of days from a date entered into cell A1 to today's date. Whether it's before or after todays date. Example:

5/10/2009 to today is -9

5/22/2009 to today is 3

View 2 Replies View Related

Counting Days Positive Or Negative Between Date (inserted Value) To System Date?

Mar 19, 2012

how can i count the positive days to a inserted date value or the past days (negative value) to the system date (today).

View 5 Replies View Related

Macro To Alert If Today's Date Is Within 5 Days Of Expected Delivery Date

Sep 18, 2008

I have a worksheet that has a sent date and expected delivery date I need create a macro that will alert me if today's date is within 5 days of expected delivery date.

View 14 Replies View Related

Calculate Number Of Days Between Two Date Within A Current Month Including End Date

Apr 2, 2009

I have two columns of dates, leave start and end dates (when people start leave i.e. annual leave). Would need to introduce column(s) to calculate how many days fell within the month including the end date and excludes weekends.

For example, if the staff on leave from 31st March to 6 April, i need to show that the number of leave taken as 1 day in March and 4 days in April.

View 9 Replies View Related

How To Auto Populate Date Range (working Days Only) From Start And End Date

May 26, 2014

i am trying to create a excel macro to auto populate all the dates with reference to a start date and end date. The catch is that only working days are required in the range. My reference cells (start and end date) are in Sheet 1 while the destination cell range are in Sheet 2. The reason for creating a macro instead of a function is that the intervals between the start date and end date changes frequently (annual, semi-annual and quarterly) Best case scenario would be a button which I can just press after i input the dates to generate the range of dates in another sheet.

View 4 Replies View Related