Count No Of Work Days In A Month

Oct 10, 2007

How do i count no of days in a month; excluding saturday & sunday.

View 14 Replies


ADVERTISEMENT

Days Since Count To Work Correcty

May 27, 2007

I'm having trouble getting the days since count to work correcty. It works fine when only counting the number of days that have elpases between a number being drawn in a lottery draw (Main numbers Only), and it being drawn again as a main number. However if I try to include the bonus ball into this count, it just returns an error. I've tried altering the old code, but I can't get it right. I've included 2 old codes as an example. Sorry I can't include the full programme as it's huge, way to big for this forum.

View 3 Replies View Related

Count How Many In A Month Days

Jun 27, 2007

I need to count how many in a month per day X number is =. I originally used Countif -

=COUNTIF(B3,">25252525=36")+COUNTIF(V3,">=36")+COUNTIF(X3,">=36")+COUNTIF(Z3,">=36")

The formula above works, but i end up with several long strings of Countif. I'd like to know if there is a way wherein i can use a shorter formula.

View 9 Replies View Related

Count Days In Specified Month

Jul 27, 2007

I am using the following array to determine the total dollar of contracts reviewed in one month.

=SUMPRODUCT(($C$5:$C$3002>$H18)*($C$5:$C$3002<$I18)*(D$5:D$3002))

Column C has the actual Date
Column H the beginning of the month
Column I the end of the month and
Column D the dollar amount

Now I would like to count the number of contracts that fall in the following categories in a given month. The minimum number is in Column N and the maximum in Column O.
1-499,999
500,000-2,499,999
2,500,000-4,999,999
5,000,000-12,499,999
12,500,000-24,999,999
25,000,000-64,999,999
65,000,000+

I can get the count for each category but am having difficulty with the count in the specific month. Does any one have any suggestions - other than a pivot table?

I am attaching a small sample.

View 4 Replies View Related

Count Number Of Days From List Fall Within Certain Month

Jan 29, 2013

My problem is , I have a date range 21-Feb-2013 till 07-Mar-2013 (Col C2, Col D2 respectively) which is holiday list for a person.

I am trying to pull out the number of working days for that person in the month of Feb which should exclude weekends.

To get the total no. of working days for the month of Feb, I have used the below formula.

=NETWORKDAYS(DATE(YEAR(C2),MONTH(C2),1),EOMONTH(C2,0))

This gives me a value of 20 which is correct.

Now I need to find no. of days which fall under the month of FEB from the date range 21-Feb-2013 till 07-Mar-2013 (Col C2, Col D2) which are working days. so that I can subtract that from no. of working days for that month (FEB) to get the no. of working days which the person has actually worked.

View 3 Replies View Related

Various Lookups And Counts: Count The Number Of Days An Item Has Been Out With One Of The Companies Per Month

Oct 8, 2009

I have three companies in column A, In Column B I have a date of when an item was sent to them, in Column C I have the amount of days this item has been out with that company. Is there a formula that will count the number of days an item has been out with one of the companies per month, and find an average if more than 1 item has been sent per month. Two items have been sent to company A in Sep 09, one item has been there 10 days the other 20 days, the answer I would be looking for is 15.

View 4 Replies View Related

Formula To Count Number Of Days In Date Range - Split Per Month

Jan 23, 2012

I have a large spreadsheet which holds lots of data with date ranges that i need to performs different actions to. Any way to identify the number of days, per calender month, that falls in a date range.

sample data...

Start Date
End Date
Old Value
New Value

08/03/2010
18/06/2010
16758.2
16758.1

[Code] .......

I need to break down the total number of days per month

Jan
Feb
Mar
Apr
May
Jun
Jul
Aug
Sep
Oct
Nov
Dec

24
30
31
18

[Code] ......

As you can see this also laps into a new year, which poses my next problem, ill probably just add more columns on to the end of the table for that though...

I will later apply different calculations to these cells but in short need to get a calculation for the number of days per month first.

(in short spreading the new value out accross the year then multiplying it by the days... i also need to apply a further daily volume cal to it).

View 8 Replies View Related

Auto Populate Calendar Days Based On Month / Year And Auto Insert Work Based On Dates / Name

Jul 31, 2013

I am trying to auto generate a calendar based on two drop down menus - Month and Year.

Once the month and year is selected I want to import all work orders onto the calendar based first on the "Labor Name" found in the list of work tab, then assign each work order for that labor name to the respective date on the calendar for the month.

August PM Schedule Demo.xlsx

View 2 Replies View Related

Function To Fill All Days Of Month To End Of Month Based On Workdays

May 1, 2006

I would like to create a monthly inventory, based on workdays (Monday - Friday)Myrna Larson has a formula that I would like to use with the workday function, but I don't know how to combine them.

=IF(A1="",A1,IF(MONTH(A1+1)=MONTH(A1),A1+1,""))+ = workday

to fit on the page, I need the dates to be from the 1st to the 15th, and 16th to the 31st. I am not sure how to write this either.

View 11 Replies View Related

Function To Fill All Days Of Month To End Of Month

Oct 2, 2005

function in a spreadsheet that will list all of the days in
a given month automaticaly with the entry of the 1st of the month only.

Ex;
10/01/05 entered dated
10/02/05 auto fill
10/03/05 "
. "
. "
10/31/05 end of auto fill

I would like the function to stop filling dates at end of the month even for shorted months such as Feb.

View 10 Replies View Related

Count How Many Days Coming Due Within 90 Days Of Each Date Based On Today Function

May 27, 2012

There are dates in column C and I need to count how many days are coming due within 90 days of each date based on the today() function but do not exceed the 90 days.

Countif Today()+90

View 5 Replies View Related

Excel 2007 :: Count Number Of Days Between Two Date Where Off Days Are Friday / Saturday And Holiday

Mar 14, 2014

I am making process TAT(Turn Around Time) which required following information. In Excel 2007.

1-Count number of days between two dates where working days are (Sun to Thursday). So required to exclude (Friday,Sat + Holidays)

A1-Start Date Mar/01/2014
B1-End Date Mar/31/2014
C1-No Of Days 22
D1-Days between two dates 21
E1 To E10-Holidays

2-Count number of days between two dates where working days are (Sat to Thursday). So required to exclude (Friday + Holidays)

A1-Start Date Mar/01/2014
B1-End Date Mar/31/2014
C1-No Of Days 27
D1-Days between two dates 26
E1 To E10-Holidays

Note : Any weekend (off days) dates listed in holidays should not effect the query.

View 9 Replies View Related

Days Between Two Dates Separated Into Days Per Month For Multiple Dates - Excel

Feb 13, 2013

I wanted to determine the number of days between two dates. Specifically, if the initial date is in one month, and the second is in a different month and an output would result a number of days in each month until the final date. BUT I have a large amount of data to do this for in a list view, way to put a formula in excel and just drag down the entire list to get the required information. see below for an example.

The result I'm looking for is the separate the months and only show the relevant months between the two dates in one cell or the adjacent. Something similar to the table outlined below.

Input Data
Result
Start Date

[Code]....

View 3 Replies View Related

Calculate Work Days Between 2 Dates

Sep 14, 2006

i have a few fields with dates in my excel sheet. I also have a field, where i want to automatically insert the business day between two other date-fields! Business date means days without the weekend and public holiday! Is it possible to do that? how?

View 9 Replies View Related

Determine Work Days Between 2 Dates

Mar 13, 2008

My workday function doesnt seem to be working correctly, it is including weekends.

My Spreadsheet is like this
A1= 01/01/2008 ( Date)
A2= 30
A3= =WORKDAY(A1+A2,0)

I am expecting the result to be 11/02/2008, but i am getting 31/01/2008.

View 3 Replies View Related

Count Days HH:MM Using Network Days

Sep 28, 2011

I need a formula to count how many days hours & mins between 2 dates but included in the formula need to ensure it only counts business days.

Column A 02/09/2011 13:00

Column AO 02/09/2011 13:02

I need in Column AP to show 0 00:02

The formula I have tried using is - =IF(AO3="","",AO3-A3) which doesnt work as instead of showing 0 00:02 it shows 1 00:02. I dont want it to count as 1 day just 2 mins.

Once that has been worked out I need to include WORKDAYS formula to only count working days. I have created the list on 'Controls' Tab Column A10:A47.

merge these together to create the one formula?

View 6 Replies View Related

NET WORK DAYS Between 1 Fixed And 1 Variable Date

Apr 7, 2008

Im wanting to calculate then no of days between 2 dates. The first one is variable.

Date 1: (Contract start date) Either the date entered in a cell A1, or 01/04/2008 - whichever is later

Date 2: (Contract end date) Date entered in cell A2.

example 1:

Date 1 = 1/1/8
Date 2 = 31/12/8

In the above example i would want the calculation to work out the n o. of working days between 1/4/8 and 31/12/8

example 2:

Date 1 = 1/5/8
Date 2 = 31/12/8

In the above example i would want the calculation to work out the n o. of working days between 1/5/8 and 31/12/8


This will allow me to calculate the number of contract days in this financial year, even if date 1 was in last financial year.

View 10 Replies View Related

Date In Cell - Adding Work Days

Nov 11, 2011

I have a date in A2 7th Nov 2011

Column B is number weeks until next appointment - 4.
Column C is the answer Friday 2nd December if the normal result is a Saturday or Sunday then use Friday.

View 9 Replies View Related

Calulate Next 4 Work Days Not Weekends/holidays

Jun 21, 2006

I have a date in a cell and need a formula that will calulate the next 4 days excluding weekends and holidays. I have search and found where one can do more complex items but not just a simple formula. I have attached an example.

View 2 Replies View Related

Work Days And Hours Between Two Dates & Times

Apr 7, 2008

I am creating a 'HelpDesk Issue Logger' and I am trying to calculate the Network Days and Network Hours between two dates with times. I want to know how many business days and hours are between the two days to give me a TURE 'Response Time.'

I have been to several sites and forums looking for the answer, but I have not been able to find a solutions that works for me. Please find attached a 'stripped' down version of my project.

Variables:
- 'Date Received' (H11)
- 'Date Actioned.' (I11)
-'Response Time' (K11)

Constants:
Work Days = Monday to Friday
Work Hrs = 8:30 AM to 5:30 PM (no lunch break)
Public Holidays = (AC13:AC30)

Formats:
Date Received: dd/mm/yyyy hh:mm AM/PM
Date Actioned: dd/mm/yyyy hh:mm AM/PM
Response Time: d - hh:mm

If there is someone out there wiling to put me out of my missery with this one, you will have a friend for life.

View 9 Replies View Related

Displaying Work Days Excl. Public Holidays

Jan 2, 2008

way to get a worksheet to display workdays that exclude public holidays? I have used the Workday() function, but this keeps displaying the date over xmas. Is there an easy way to do this?

View 9 Replies View Related

Subtract Two Dates To Get Number Of Week Days - Networkdays Does Not Work

Dec 10, 2013

I am trying to find a formula that will return the number of week days between two dates. My specific situation is that my job sets up work orders (WO) to be completed by our staff. We have 3 dates - the date the WO was created, the date the WO is due to be completed, and the date the WO was actually completed.

I would like to subtract the Complete date from the Due date. Generally, this should always equal zero because our staff should be completing WOs on the due date! But obviously that doesn't always happen. There are times that they complete them late, and times they complete them early (yay!).

The problem with NETWORKDAYS is that even when they are completed on time, the result is 1. This formula counts instead of subtracts. I adjusted the formula to =NETWORKDAYS(A3,A4)-1 which works fine for those WOs completed on time or completed late. But for those completed early, it adds (or subtracts, really) 2 days. So for a WO completed a day early, instead of it showing -1, it shows -3. I've attached an example of WOs and the NETWORKDAYS formula I've used so you can see.

Subtract Days.xls

I'm really looking for something that will subtract week days, not count them.

View 3 Replies View Related

Work Schedule: Insert The Numbers 1-6 Into The Spreadsheet Throughout The 14 Days For Each Employee

Oct 7, 2009

I developed a 14-day work schedule and I assigned each different job position a number. The different job positions are numbered 1-6 and are as follows: #1=5:30am-1:30pm, #2=6:00am-2:00pm, #3=9:30am-1:30pm, #4=12:00pm-8:00pm, #5=1:00pm-8:00pm & #6=6:00pm-8:00pm. Numbers 1,2,4,5 clock-out for a 30 minute lunch break, while the other numbers do not.

My goal is to insert the numbers 1-6 into the spreadsheet throughout the 14 days for each employee, and have Excel calculate the total number of hours for each employee in the far right column. I would also like "V" & "H" to equal 7.5 hours. This would save a lot of time instead of going through and adding up the hours with a calculator

View 3 Replies View Related

Difference Between 2 Dates, Incl Weekends, With Variable Work Days

Jul 11, 2006

I am creating a problem report spreadsheet for work. In col C I have a date/time that the problem started, eg, 23-Jun-2006 15:20 and in col D I have a date/time for when the problem was resolved, eg, 26-Jun-2006 15:40. I need to calculate the amount of hours that we were not available for use (due to the problem). This is based on a list of available hours. Eg, on Mondays we are available 19.5 hrs, T-F 22.5 hrs, Sa 14.5 hrs, and Sun 0 hrs.

If I do a straight subtraction, it uses 24 hrs for each day - not taking into account our available hrs. If I do NETWORKDAYS it automatically doesn't consider Sat or Sun - and i need it to - and it does have a DayEnd and DayStart but it assumes they are constants. I found the day corresponding to the date and thought I could determine the series of days between it, e.g., if the start day was Friday & the end day Monday, the series in between is Sat & Sun. Then I could do a lookup on all 4 days in a table & add them all together. But I can't figure out how to do this!

View 4 Replies View Related

Convert Month Into Days

Mar 16, 2014

I want to convert Months into days

E.g. - in my Data F2 = Oct.13 and I want 31 days in F3.

View 3 Replies View Related

No Of Days In Month Query

Oct 2, 2008

I need to calculate the number of days chargeable in a given month for a tenancy as follows:

eg Current Month 30 Sep 2008

Begin End No of Days in Month
Tenancy 1 01 Jul 2008 31 Jul 08
Tenancy 2 01 Jul 2008 24 Sep 08
Tenancy 1 01 Jul 2008 31 Oct 08
Tenancy 1 01 Sep 2008 30 Sep 08
Tenancy 1 01 Sep 2008 31 Oct 08
Tenancy 1 01 Oct 2008 31 Dec 08

View 11 Replies View Related

Getting All Days Of Month From Inputbox?

Aug 13, 2009

Need a way to get/calculate ALL of the days of the months from a date range entered into an inputbox in which a user may enter any day of a month? In other words, the user enters 9/14/2009 in the first inputbox then 10/8/2012 in the second and code would calculate the number of days as 9/1/2009 - 10/31/2012.

Here is the current code I'm using that calculates only the exact days:

View 3 Replies View Related

Break Down How Many Days In Each Month

Mar 3, 2009

I have is a start rent date and an end rent date. They want to break down how many days in each month the item was on rent so they have a column for each month. For example say an item was rented on 12/14/08 and returned on 1/12/09. It was rented for a total of 30days 18 days in December and 12 days in January. So I would need a function in each column that would return a 14 in the December Column and a 12 in the January Column. there are over 350 rows and they are doing the process manually right now and taking several days.

Also I just noticed that the date range is currently entered as a text in the format 2008-12-14 so YYYY-MM-DD. Don't know if the text will be a problem.

Just attached an expample. In it I am trying to find a function to fill in the green cells.

View 5 Replies View Related

Month Following 90 Days From Date

Apr 21, 2009

I have 5 columns: Employee Name, Start Date, Probation Time, Probation Ends, Benefits Start.

I want the Benefits Start column to populate the name of the month that follows the Probation Ends date.

For example Employee A starts on March 16. Probation time is 90 days. Probation Ends is 6/14/09. The Benefits start date is 7/1/09, however I want this column to just say July.

View 12 Replies View Related

How To Calculate (first Of The Month After 60 Days)

Apr 17, 2013

I am having trouble creating a formula to capture the "first of the month after 60 days" from the Hire Date.

Example, Hire Date is 01/15/2013, should return 04/01/2013. Would the ROUNDUP function be useful here?

View 8 Replies View Related