I'm having trouble getting the days since count to work correcty. It works fine when only counting the number of days that have elpases between a number being drawn in a lottery draw (Main numbers Only), and it being drawn again as a main number. However if I try to include the bonus ball into this count, it just returns an error. I've tried altering the old code, but I can't get it right. I've included 2 old codes as an example. Sorry I can't include the full programme as it's huge, way to big for this forum.

View 3 Replies


ADVERTISEMENT

Count No Of Work Days In A Month

Oct 10, 2007

How do i count no of days in a month; excluding saturday & sunday.

View 14 Replies View Related

Count How Many Days Coming Due Within 90 Days Of Each Date Based On Today Function

May 27, 2012

There are dates in column C and I need to count how many days are coming due within 90 days of each date based on the today() function but do not exceed the 90 days.

Countif Today()+90

View 5 Replies View Related

Excel 2007 :: Count Number Of Days Between Two Date Where Off Days Are Friday / Saturday And Holiday

Mar 14, 2014

I am making process TAT(Turn Around Time) which required following information. In Excel 2007.

1-Count number of days between two dates where working days are (Sun to Thursday). So required to exclude (Friday,Sat + Holidays)

A1-Start Date Mar/01/2014
B1-End Date Mar/31/2014
C1-No Of Days 22
D1-Days between two dates 21
E1 To E10-Holidays

2-Count number of days between two dates where working days are (Sat to Thursday). So required to exclude (Friday + Holidays)

A1-Start Date Mar/01/2014
B1-End Date Mar/31/2014
C1-No Of Days 27
D1-Days between two dates 26
E1 To E10-Holidays

Note : Any weekend (off days) dates listed in holidays should not effect the query.

View 9 Replies View Related

Calculate Work Days Between 2 Dates

Sep 14, 2006

i have a few fields with dates in my excel sheet. I also have a field, where i want to automatically insert the business day between two other date-fields! Business date means days without the weekend and public holiday! Is it possible to do that? how?

View 9 Replies View Related

Determine Work Days Between 2 Dates

Mar 13, 2008

My workday function doesnt seem to be working correctly, it is including weekends.

My Spreadsheet is like this
A1= 01/01/2008 ( Date)
A2= 30
A3= =WORKDAY(A1+A2,0)

I am expecting the result to be 11/02/2008, but i am getting 31/01/2008.

View 3 Replies View Related

Count Days HH:MM Using Network Days

Sep 28, 2011

I need a formula to count how many days hours & mins between 2 dates but included in the formula need to ensure it only counts business days.

Column A 02/09/2011 13:00

Column AO 02/09/2011 13:02

I need in Column AP to show 0 00:02

The formula I have tried using is - =IF(AO3="","",AO3-A3) which doesnt work as instead of showing 0 00:02 it shows 1 00:02. I dont want it to count as 1 day just 2 mins.

Once that has been worked out I need to include WORKDAYS formula to only count working days. I have created the list on 'Controls' Tab Column A10:A47.

merge these together to create the one formula?

View 6 Replies View Related

NET WORK DAYS Between 1 Fixed And 1 Variable Date

Apr 7, 2008

Im wanting to calculate then no of days between 2 dates. The first one is variable.

Date 1: (Contract start date) Either the date entered in a cell A1, or 01/04/2008 - whichever is later

Date 2: (Contract end date) Date entered in cell A2.

example 1:

Date 1 = 1/1/8
Date 2 = 31/12/8

In the above example i would want the calculation to work out the n o. of working days between 1/4/8 and 31/12/8

example 2:

Date 1 = 1/5/8
Date 2 = 31/12/8

In the above example i would want the calculation to work out the n o. of working days between 1/5/8 and 31/12/8


This will allow me to calculate the number of contract days in this financial year, even if date 1 was in last financial year.

View 10 Replies View Related

Date In Cell - Adding Work Days

Nov 11, 2011

I have a date in A2 7th Nov 2011

Column B is number weeks until next appointment - 4.
Column C is the answer Friday 2nd December if the normal result is a Saturday or Sunday then use Friday.

View 9 Replies View Related

Calulate Next 4 Work Days Not Weekends/holidays

Jun 21, 2006

I have a date in a cell and need a formula that will calulate the next 4 days excluding weekends and holidays. I have search and found where one can do more complex items but not just a simple formula. I have attached an example.

View 2 Replies View Related

Work Days And Hours Between Two Dates & Times

Apr 7, 2008

I am creating a 'HelpDesk Issue Logger' and I am trying to calculate the Network Days and Network Hours between two dates with times. I want to know how many business days and hours are between the two days to give me a TURE 'Response Time.'

I have been to several sites and forums looking for the answer, but I have not been able to find a solutions that works for me. Please find attached a 'stripped' down version of my project.

Variables:
- 'Date Received' (H11)
- 'Date Actioned.' (I11)
-'Response Time' (K11)

Constants:
Work Days = Monday to Friday
Work Hrs = 8:30 AM to 5:30 PM (no lunch break)
Public Holidays = (AC13:AC30)

Formats:
Date Received: dd/mm/yyyy hh:mm AM/PM
Date Actioned: dd/mm/yyyy hh:mm AM/PM
Response Time: d - hh:mm

If there is someone out there wiling to put me out of my missery with this one, you will have a friend for life.

View 9 Replies View Related

Displaying Work Days Excl. Public Holidays

Jan 2, 2008

way to get a worksheet to display workdays that exclude public holidays? I have used the Workday() function, but this keeps displaying the date over xmas. Is there an easy way to do this?

View 9 Replies View Related

Subtract Two Dates To Get Number Of Week Days - Networkdays Does Not Work

Dec 10, 2013

I am trying to find a formula that will return the number of week days between two dates. My specific situation is that my job sets up work orders (WO) to be completed by our staff. We have 3 dates - the date the WO was created, the date the WO is due to be completed, and the date the WO was actually completed.

I would like to subtract the Complete date from the Due date. Generally, this should always equal zero because our staff should be completing WOs on the due date! But obviously that doesn't always happen. There are times that they complete them late, and times they complete them early (yay!).

The problem with NETWORKDAYS is that even when they are completed on time, the result is 1. This formula counts instead of subtracts. I adjusted the formula to =NETWORKDAYS(A3,A4)-1 which works fine for those WOs completed on time or completed late. But for those completed early, it adds (or subtracts, really) 2 days. So for a WO completed a day early, instead of it showing -1, it shows -3. I've attached an example of WOs and the NETWORKDAYS formula I've used so you can see.

Subtract Days.xls

I'm really looking for something that will subtract week days, not count them.

View 3 Replies View Related

Work Schedule: Insert The Numbers 1-6 Into The Spreadsheet Throughout The 14 Days For Each Employee

Oct 7, 2009

I developed a 14-day work schedule and I assigned each different job position a number. The different job positions are numbered 1-6 and are as follows: #1=5:30am-1:30pm, #2=6:00am-2:00pm, #3=9:30am-1:30pm, #4=12:00pm-8:00pm, #5=1:00pm-8:00pm & #6=6:00pm-8:00pm. Numbers 1,2,4,5 clock-out for a 30 minute lunch break, while the other numbers do not.

My goal is to insert the numbers 1-6 into the spreadsheet throughout the 14 days for each employee, and have Excel calculate the total number of hours for each employee in the far right column. I would also like "V" & "H" to equal 7.5 hours. This would save a lot of time instead of going through and adding up the hours with a calculator

View 3 Replies View Related

Difference Between 2 Dates, Incl Weekends, With Variable Work Days

Jul 11, 2006

I am creating a problem report spreadsheet for work. In col C I have a date/time that the problem started, eg, 23-Jun-2006 15:20 and in col D I have a date/time for when the problem was resolved, eg, 26-Jun-2006 15:40. I need to calculate the amount of hours that we were not available for use (due to the problem). This is based on a list of available hours. Eg, on Mondays we are available 19.5 hrs, T-F 22.5 hrs, Sa 14.5 hrs, and Sun 0 hrs.

If I do a straight subtraction, it uses 24 hrs for each day - not taking into account our available hrs. If I do NETWORKDAYS it automatically doesn't consider Sat or Sun - and i need it to - and it does have a DayEnd and DayStart but it assumes they are constants. I found the day corresponding to the date and thought I could determine the series of days between it, e.g., if the start day was Friday & the end day Monday, the series in between is Sat & Sun. Then I could do a lookup on all 4 days in a table & add them all together. But I can't figure out how to do this!

View 4 Replies View Related

Count Last 10 Days

Sep 22, 2006

I have a spreadsheet with a list in column A, and starting from column D in row 1 are daily dates e.g. 01/10/06, 02/10/06, 03/10/06. On a daily basis an x is added manually to the spreadsheet where the list criteria matches the specific date e.g

A B C D E F
1 01/10/06 02/10/06 03/10/06
2 M123 x x
3 M456 x x
4 M789 x x

What i would like to do in column C is to measure how many x's are in the last 10 days for each row. I have used formulas in the past to do something similar but I can't find them. Sorry I can't upload a sample but firewall won't allow.

View 8 Replies View Related

Count Closed Work Orders

Sep 11, 2009

I need to count the amount of work orders that my employees have completed.

Review example.
How many work orders did chuck complete? (Column D)
How many work orders did brian complete?

View 2 Replies View Related

How To Count Amount Of Days

Sep 1, 2008

Is there a formula to count the amount of days, for example.....a1=8/1/08 b2=8/10/08 then c1=9 days....

View 4 Replies View Related

Count Days Not At Site

May 8, 2014

I have the vacation sheet so I can track my vacation hours used and available. The last thing I need is a way to count the number of days I'm not at my site. It doesn't matter why (Training, Holiday, Travel or Vacation) I need to track total days of site.

View 4 Replies View Related

Count Days Formula

Dec 31, 2006

I would like to have a formula in a spreadsheet of personal bills that counts down the number of days until each one is due each month.

In one column, I have a digit in each cell to represent the day of the month each month that the bill is due. Someone helped me with a formula that can count down days to a date that is a higher number than the present day of the month, but can I get a formula to count the days from, say, December (or any month) 28th to a due date of the 6th (of the next month)?

View 9 Replies View Related

Count How Many In A Month Days

Jun 27, 2007

I need to count how many in a month per day X number is =. I originally used Countif -

=COUNTIF(B3,">25252525=36")+COUNTIF(V3,">=36")+COUNTIF(X3,">=36")+COUNTIF(Z3,">=36")

The formula above works, but i end up with several long strings of Countif. I'd like to know if there is a way wherein i can use a shorter formula.

View 9 Replies View Related

How Can I Count Workable Days

Jan 15, 2009

when I try to calculate the worked days between two dates using the formula "Networkdays" in excel, the result just count the days from Monday to Friday.

Example:

If I want to calculate the workable days from 12/1/08 (Start_date in cell A1) to 1/14/09 (End_date in cell A2) by using the formula: =NETWORKDAYS(A1,A2)

the result will be 33 days, but due to fact that I also need to count Saturdays, the result that I need must be 39 days.

View 9 Replies View Related

Days Count From Specified Date

Jan 14, 2007

The union has instated a new policy here and new hires now have a 120 working day probationary period. That comes out to about 6 months. ( 168 days minus the 48 days off) . what I’m looking for is a formula that will calculate each date that has passed as one starting at a –48 … also adding in to the equation that every day sick counts against that 120 and everyday of OT counts as positive brining them closer to the 120 they need.

I can figure out the math part of adding and subtracting the days. But what I can’t figure out is how do I get it to read each date as one starting from the date in cell b3

Example cell b3 has 9/25/06 cell b4 has 3/12/07 all the days that have passed count as one.

The total starts as a –48( due to the days off) with the verabial, d8 is a negative and d9 is a positive. To be added in to the total.

View 5 Replies View Related

Count Days Between Two Dates

Apr 13, 2007

vba excel?

I wish to calculate the days between the starting date (column A) and ending date (column B). For the first 7 days are excluding all the holiday and weekend and the rest of it until the ending date are counted.

View 9 Replies View Related

Count Days In Specified Month

Jul 27, 2007

I am using the following array to determine the total dollar of contracts reviewed in one month.

=SUMPRODUCT(($C$5:$C$3002>$H18)*($C$5:$C$3002<$I18)*(D$5:D$3002))

Column C has the actual Date
Column H the beginning of the month
Column I the end of the month and
Column D the dollar amount

Now I would like to count the number of contracts that fall in the following categories in a given month. The minimum number is in Column N and the maximum in Column O.
1-499,999
500,000-2,499,999
2,500,000-4,999,999
5,000,000-12,499,999
12,500,000-24,999,999
25,000,000-64,999,999
65,000,000+

I can get the count for each category but am having difficulty with the count in the specific month. Does any one have any suggestions - other than a pivot table?

I am attaching a small sample.

View 4 Replies View Related

Count Dates Within Last X Days

Sep 6, 2007

I am trying to count the number of dates in a column that are within the last 180 days. I tried using COUNTIF and it did not work. Formula which I thought should work: =COUNTIF(A3:A32,>(A40)). My workaround is shown in Column B, but this method adds one column for each participant.

View 5 Replies View Related

To Work Out A "days Since Last Accident" Formula

Sep 25, 2009

I am trying to work out a "days since last accident" formula - for example if unit has had 10 accidents, all different dates, I want excel to select the most recent date and then calculate the days between this date and today's date -

View 9 Replies View Related

Count Days Excluding Only Sunday?

Jun 5, 2014

how to count days excluding only sundays in a calender period.

"weekdays" excludes both saturdays and sundays.

View 3 Replies View Related

Count Number Of Days Between 2 Dates

Mar 17, 2009

I have a question, does anyone now how to count between dates, for exemple :

01-02-2009
15-02-2009
22-02-2009
25-02-2009
03-03-2009
11-03-2009

And i wont only to count between 01-02-2009 / 28-02-2009, the result it will be 4.

View 14 Replies View Related

Count Number Of Working Days

Nov 26, 2013

Create a formula to count number of days an employee work (in 25 working days and 5 Friday as rest day month):

Example:

If employee works 25 days during weekdays he will get counted as = 30 days
If employee works only 22 days during weekdays with 3 absences during weekdays he will get counted as = 27 days.
If employee works from 1st to 24th and 25th to 30th absence he will get counted as = 24 days.

Other examples and output desired I attached here: Sample.xlsx