Displaying Work Days Excl. Public Holidays
Jan 2, 2008
way to get a worksheet to display workdays that exclude public holidays? I have used the Workday() function, but this keeps displaying the date over xmas. Is there an easy way to do this?
View 9 Replies
ADVERTISEMENT
Jun 21, 2006
I have a date in a cell and need a formula that will calulate the next 4 days excluding weekends and holidays. I have search and found where one can do more complex items but not just a simple formula. I have attached an example.
View 2 Replies
View Related
Sep 25, 2009
I am using this formula to calculate a set of PH(Public Holidays) that have passed from a period of 1/4/2009 to 31/3/2010.
=IF(TODAY()>='Team Schedule'!D5,1.5,0)+IF(TODAY()>='Team Schedule'!D6,1.5,0)+IF(TODAY()>='Team Schedule'!D7,1.5,0)+IF(TODAY()>='Team Schedule'!D8,1.5,0)+IF(TODAY()>='Team Schedule'!D9,1.5,0)+IF(TODAY()>='Team Schedule'!D10,1.5,0)+IF(TODAY()>='Team Schedule'!D11,1.5,0)+IF(TODAY()>='Team Schedule'!D12,1.5,0)+IF(TODAY()>='Team Schedule'!H2,1.5,0)+IF(TODAY()>='Team Schedule'!H3,1.5,0)+IF(TODAY()>='Team Schedule'!H4,1.5,0)-4.5
From what u can see here, its a massive formula.... but I am pretty sure that there is a shorter way to key in the formula
*Note*
'Team Schedule'!D5-D12 and 'Team Schedule'!H2-H4 are PH. disregard the 4.5 that is in the formula as it is used for other purposes. Every PH that has passed will credit a 1.5 into the cell.
View 2 Replies
View Related
Mar 16, 2009
I would like to find out if a job took more than 24 hour cycle time (eg. 6:00 am to 5:59:59 AM next day). data:
A1 = received date & time (format "m/d/yyyy h:mm")
B1 = completed date & time (format "m/d/yyyy h:mm")
my formula is '=if(B1-A1>"24:00"+0,"Yes","No"). The problem with the formula is that it doesnt exclude weekends nor public holidays. I couldnt formulate a solution using networkdays function......
View 3 Replies
View Related
Feb 17, 2007
I read the Excel VBA Variables Scope and Lifetime info, but I still don't understand b/c of the statement "It's value is retained unless the Workbook closes or the End Statement is used." Which "End Statement"?
I want to fill an array in a form module, then later use those values in a different form module. If I declare the public variable in a standard module, I know any of the modules can access it, but will it retain its value after form1 is no longer running?
If not, do I need to involve a class somehow? I know nothing about classes except that their variables retain their values as long as any of the members is running.
View 9 Replies
View Related
May 13, 2014
1. Find the working days between 15th Nov 09 to 28th
2. Add a column that shows the date after a number of months from today date. The number of months from todays date for each of the country is mentioned in column No. of Months after which revised.
3. Find the date our training will end using excel considering the fact that SAT and SUN are holidays. (Use the date when your training started)
View 2 Replies
View Related
Aug 8, 2014
I want a formula that counts all days of a month "listed in a column" but excluding sunday.
View 14 Replies
View Related
Oct 7, 2011
I need to calculate the number of days between 2 dates including holidays and weekends. That means I cant use NETWORKDAYS as it excludes weekend.
View 9 Replies
View Related
Jul 6, 2012
I'm trying to count the total days between to dates but minus the fed holidays. I have a list of holidays I can ref. I like how the NETWORKDAYS function works but I need to include the weekends.
View 2 Replies
View Related
Dec 29, 2013
I am working on a sheet right now where I want to put the day a certain number of days in the future but I want to skip only Holidays, or days in a list on another part of the sheet, but count the weekend days.
All the formulas and post I have read is about someone wanting to skip weekends too. I did find a workdays formula where you and pick what you want to be considered as the weekend but I just want to skip holidays.
Example:
Day is Dec-31-2013 7 days in the future is Jan-7-2014
I want it to be since Jan 1 is a Holiday the answer will be Jan-8-2014
View 4 Replies
View Related
Oct 6, 2007
I have a calender with days in the columns and months in the rows. However I have 3 rows for each month. I'm using text and values combinations in the cells to record data
Example First Sheet
Feb Rows, 11,12&13
Columns C,G Dates 1st to 5th
Therefore 1st of Feb has 3 cells to enter data, ie Basic Hours, Sickness, Holiday
Currently I'm defining a name range for each month, ie DFeb. Currently I'm recording each of the rows into columns in another sheet and the date in the row, by using a Hlookup on the date and a vlookup on the month
ie Second Sheet...............
View 5 Replies
View Related
Jun 25, 2008
Please see attached spreadsheet on what I am trying to achieve.
In the data tab I have my base data, which is dates across the top and names down the side. I have information in the middle such as 'H8' which means that the person was on holiday for 8 hours on that particular day, and 'S8' which means they were sick for 8 hours on that day.
I want a macro that will rearrange the information in the table and put it into the report format which is in the report sheet.
If you see the spreadsheet you will probably get a better idea of what I am trying to achieve.
View 5 Replies
View Related
Oct 28, 2009
From another thread I got this formula placed on B5:
=NETWORKDAYS(EOMONTH(B4,-1)+1,EOMONTH(B4,0),Holidays)
his generates the number of working days for that month (regardless of the date on B4) that exclude Holidays listed under the range "Holidays".
I also got this code (Credits to XXXX)
View 4 Replies
View Related
Jun 19, 2014
I would like to display a number as weeks and days. For example the number 8 needs to be displayed as "1w 1d" or the number 14 as "2w 0d"
I am able to use a formula such as =INT((C3)/7)&"w "&(((C3)/7)-INT(((C3)/7)))*7&"d" but I wish to preserve the formatting of a number so that I can add 2 or more numbers together.
I am hoping that there is a way of doing what I want using the Custom Category in the Format Cells dialogue box.
View 4 Replies
View Related
Oct 10, 2007
How do i count no of days in a month; excluding saturday & sunday.
View 14 Replies
View Related
Sep 14, 2006
i have a few fields with dates in my excel sheet. I also have a field, where i want to automatically insert the business day between two other date-fields! Business date means days without the weekend and public holiday! Is it possible to do that? how?
View 9 Replies
View Related
May 27, 2007
I'm having trouble getting the days since count to work correcty. It works fine when only counting the number of days that have elpases between a number being drawn in a lottery draw (Main numbers Only), and it being drawn again as a main number. However if I try to include the bonus ball into this count, it just returns an error. I've tried altering the old code, but I can't get it right. I've included 2 old codes as an example. Sorry I can't include the full programme as it's huge, way to big for this forum.
View 3 Replies
View Related
Mar 13, 2008
My workday function doesnt seem to be working correctly, it is including weekends.
My Spreadsheet is like this
A1= 01/01/2008 ( Date)
A2= 30
A3= =WORKDAY(A1+A2,0)
I am expecting the result to be 11/02/2008, but i am getting 31/01/2008.
View 3 Replies
View Related
Apr 7, 2008
Im wanting to calculate then no of days between 2 dates. The first one is variable.
Date 1: (Contract start date) Either the date entered in a cell A1, or 01/04/2008 - whichever is later
Date 2: (Contract end date) Date entered in cell A2.
example 1:
Date 1 = 1/1/8
Date 2 = 31/12/8
In the above example i would want the calculation to work out the n o. of working days between 1/4/8 and 31/12/8
example 2:
Date 1 = 1/5/8
Date 2 = 31/12/8
In the above example i would want the calculation to work out the n o. of working days between 1/5/8 and 31/12/8
This will allow me to calculate the number of contract days in this financial year, even if date 1 was in last financial year.
View 10 Replies
View Related
Nov 11, 2011
I have a date in A2 7th Nov 2011
Column B is number weeks until next appointment - 4.
Column C is the answer Friday 2nd December if the normal result is a Saturday or Sunday then use Friday.
View 9 Replies
View Related
Apr 7, 2008
I am creating a 'HelpDesk Issue Logger' and I am trying to calculate the Network Days and Network Hours between two dates with times. I want to know how many business days and hours are between the two days to give me a TURE 'Response Time.'
I have been to several sites and forums looking for the answer, but I have not been able to find a solutions that works for me. Please find attached a 'stripped' down version of my project.
Variables:
- 'Date Received' (H11)
- 'Date Actioned.' (I11)
-'Response Time' (K11)
Constants:
Work Days = Monday to Friday
Work Hrs = 8:30 AM to 5:30 PM (no lunch break)
Public Holidays = (AC13:AC30)
Formats:
Date Received: dd/mm/yyyy hh:mm AM/PM
Date Actioned: dd/mm/yyyy hh:mm AM/PM
Response Time: d - hh:mm
If there is someone out there wiling to put me out of my missery with this one, you will have a friend for life.
View 9 Replies
View Related
Aug 14, 2012
I am trying to bring up a form after clicking the "ok" button on another form. Both forms are defined in my public sub, so basically, the module creates both forms, calls the first form, and hides the second form. Then the first form hides itself and shows the second form. However, when second form is defined using "dim", the first form can't find it to show it, and when I make the second form "public" in my public sub, I get the error that it is an invalid attribute or function.
Here is the code from my sub that applies to this error:
Code:
Public Sub PutInEngine()
Dim InputForm As New FrmInputs
InputForm.Show
[Code].....
View 3 Replies
View Related
Feb 20, 2009
Is there a way to count the total number of rows with data (excluding title row at top and Auto-Sum row at bottom) and put the result in L2?
View 14 Replies
View Related
Dec 10, 2013
I am trying to find a formula that will return the number of week days between two dates. My specific situation is that my job sets up work orders (WO) to be completed by our staff. We have 3 dates - the date the WO was created, the date the WO is due to be completed, and the date the WO was actually completed.
I would like to subtract the Complete date from the Due date. Generally, this should always equal zero because our staff should be completing WOs on the due date! But obviously that doesn't always happen. There are times that they complete them late, and times they complete them early (yay!).
The problem with NETWORKDAYS is that even when they are completed on time, the result is 1. This formula counts instead of subtracts. I adjusted the formula to =NETWORKDAYS(A3,A4)-1 which works fine for those WOs completed on time or completed late. But for those completed early, it adds (or subtracts, really) 2 days. So for a WO completed a day early, instead of it showing -1, it shows -3. I've attached an example of WOs and the NETWORKDAYS formula I've used so you can see.
Subtract Days.xls
I'm really looking for something that will subtract week days, not count them.
View 3 Replies
View Related
Oct 7, 2009
I developed a 14-day work schedule and I assigned each different job position a number. The different job positions are numbered 1-6 and are as follows: #1=5:30am-1:30pm, #2=6:00am-2:00pm, #3=9:30am-1:30pm, #4=12:00pm-8:00pm, #5=1:00pm-8:00pm & #6=6:00pm-8:00pm. Numbers 1,2,4,5 clock-out for a 30 minute lunch break, while the other numbers do not.
My goal is to insert the numbers 1-6 into the spreadsheet throughout the 14 days for each employee, and have Excel calculate the total number of hours for each employee in the far right column. I would also like "V" & "H" to equal 7.5 hours. This would save a lot of time instead of going through and adding up the hours with a calculator
View 3 Replies
View Related
Jul 11, 2006
I am creating a problem report spreadsheet for work. In col C I have a date/time that the problem started, eg, 23-Jun-2006 15:20 and in col D I have a date/time for when the problem was resolved, eg, 26-Jun-2006 15:40. I need to calculate the amount of hours that we were not available for use (due to the problem). This is based on a list of available hours. Eg, on Mondays we are available 19.5 hrs, T-F 22.5 hrs, Sa 14.5 hrs, and Sun 0 hrs.
If I do a straight subtraction, it uses 24 hrs for each day - not taking into account our available hrs. If I do NETWORKDAYS it automatically doesn't consider Sat or Sun - and i need it to - and it does have a DayEnd and DayStart but it assumes they are constants. I found the day corresponding to the date and thought I could determine the series of days between it, e.g., if the start day was Friday & the end day Monday, the series in between is Sat & Sun. Then I could do a lookup on all 4 days in a table & add them all together. But I can't figure out how to do this!
View 4 Replies
View Related
Sep 25, 2009
I am trying to work out a "days since last accident" formula - for example if unit has had 10 accidents, all different dates, I want excel to select the most recent date and then calculate the days between this date and today's date -
View 9 Replies
View Related
Dec 19, 2008
I have a series of data that acts upon a traffic light system, i.e. Green, Amber and Red. These variables are posted along row 1 for example and there are 10 columns. Per column I have a tick and cross to answer a question. How can I find out how many ticks were on green days, amber days and red days? I have attached an example.
View 4 Replies
View Related
Jul 31, 2013
I am trying to auto generate a calendar based on two drop down menus - Month and Year.
Once the month and year is selected I want to import all work orders onto the calendar based first on the "Labor Name" found in the list of work tab, then assign each work order for that labor name to the respective date on the calendar for the month.
August PM Schedule Demo.xlsx
View 2 Replies
View Related
Jan 11, 2009
i need to work out a formula for my spreadsheet which I use to work out cutting lists for timber frames. I need it to work out if the width of a job is for eg 2400mm i need to work out how many timber studs I need so the space between each stud is between 400mm and 500mm and this will need to work for a range of different sizes of frames. I have it written at the moment and it just devides the width by 400 and gives me a amount of studs but it would work much better if it could space them between 400 & 500.
View 4 Replies
View Related