Past Days Calculation

Feb 6, 2008

I would like to calculate how many days past since the special Cell have been filled with data.

For exampl:

If Cell A1 filled with the data in Cell B1 I need to show the day number, if I close the file and open it next day it will show number 1 as a one day past.

View 9 Replies


ADVERTISEMENT

Due Dates To Days Past Due

Aug 20, 2007

I am trying to create a spread sheet in excel that will show a number of days past due counting from the due dates. see the attached xls file for details.

View 5 Replies View Related

Average For The Past X Days

Feb 7, 2008

I want to keep track of housekeeping attendants' average productivity of rooms cleaned per day/shift for the last 10 days worked.

I need a formula which will give me an average of the 10 most recent cells with a value (0 should be counted).

I also want to have each month in a separate tab, and for the formula described above to average between two tabs should the 10 days cross-over.

View 4 Replies View Related

Highlight Cell If X Days Past Today

Aug 11, 2007

I want to take a timestamp and make a condition. that condition would be if that timestamp is greater then 30 days from entered then highlight that cell field. Can some one shed some light on how they would be written.

EXample ( todays date) 30days later

View 7 Replies View Related

Color Cells Past Current Date Plus X Days

Mar 2, 2008

I currently have a sheet that shows monthly tasks and their due dates. There is also a control that when clicked, resets the due date to the following month of the same day.

What I would like to do is setup some type of reminder such as either flash the due date cell if possible or change the fill color. It should do this when the system date is = to or 4 days before the due date.

The only way I can see doing this is using VBA, which I do not know very well.

View 3 Replies View Related

Conditionally Format Entire Row For Dates 15 Days Past Today Date?

Jun 11, 2014

I have spent too many hours Googling and trial with mostly error in attempting this. I formatted the very first cell A1 for today's date =TODAY(); this is also dirrectly above the column with all the dates in it. I just want an entire row's contents to turn red if it is 15 days old or older. This =$A1<TODAY()-15 somewhat works, but it only turns the date cell red, not the whole row. It also makes blank cells turns red, which I would like to remain blank (another formula is needed I imagine).

View 3 Replies View Related

Excel 2010 :: Highlight Number When It Exceeds Past 30 Days Average

Jan 20, 2012

Excel 2010 Higher than past average formula?

Im using Excel 2010 and want to make a formula that will High light the number when it exceeds the past 30 days average. My information is listed vertically in row F..

View 3 Replies View Related

Days Calculation Between Two Date

Jul 22, 2007

If Invoice date is : 17.06.2007 & payment due date is 02.08.2007

In above please confirm formula of days calculation between above two date.

View 12 Replies View Related

Tat Calculation Only For Business Days

Dec 4, 2008

I am not able to calculate TAT(Turn around Time) between two dates without taking Off days. Plz help me on this.. File is attatched as per example..

View 6 Replies View Related

Hours To Days Calculation?

Feb 5, 2013

I am trying to figure out the calculation of cycle time from my worksheet. I have 1419 hrs equals 59 days 03 hrs.

If A2=1419

I tried this formula

=INT(A2/24)&" days " &MOD(A2,24)&" hrs"

Which gave me an answer of 59 days 3 hrs.

I was wondering how they got "03 hrs"?

View 9 Replies View Related

Days On Hand Calculation

Jan 29, 2009

I'm looking to create an inventory days on hand calculation (DOH), but I'm not quite
sure what formula will do the trick. Here is an example:


DOH......FG Inv......1/29/2009......1/30/2009......2/2/2009......2/3/2009......2/4/2009
X..........80.............20................20.................20..............20..............20


I'm trying to solve for 'X'. My finished good inventory (FG Inv) is 80pcs.
That will cover customer demand out to 2/3/2009. Therefore, I have 4 DOH
of inventory.

I'm looking for a formula to determine the 'DOH'.

View 9 Replies View Related

Calculation That Uses Number Of Days Of Previous Month?

Jul 1, 2014

I have to do a calculation that uses the number of days of the previous month. Thought this would work but it doesn't.

[Code].....

View 12 Replies View Related

Excel 2010 :: Calculation Of Leave Days?

Jan 5, 2013

Working on Excel 2010

Need a formula to calculate the number of leave days.

C3 - Start Date, e.g. 01/07/2011
D3 - Calculation date, e.g. 31/12/2012
E3 - Number of months - ??????? Forumal need from 01/07/2011 to 31/12/2012
F3 - Days per month, e.g. 1.25
G3 - E3*F3

View 6 Replies View Related

Year,month,week,days Calculation

Aug 3, 2006

What I am trying to to is calculate the number of Years, Months, Weeks, and Days from one date to another. So far I can calculate years and months accuretly but I'm having trouble with the days and can't seem to figure out how to do the weeks.

I'm using the formula: =DATEDIF(B1,B2,"y")&" Year(s), "&MOD(DATEDIF(B1,B2,"m"),12)&" Month(s), and "&(MOD(DATEDIF(B1,B2,"d"),365))&" day(s)"

B1 is the current days date
B2 is the entered date

What I am getting when I enter the date 9/14/09 with the current date (8/3/06) is 3 years, 1 month and 43 days. when it shoud only be 3 years 1 month and 11 days. Any date I enter the days are not right. I can't seem to figure out what I am doing wrong. Also I'd like to get the weeks to come up also. Such as Start date 8/3/06 Entered date 10/19/09. What I want to see: 3 year(s), 2 month(s), 2 week(s), 2 day(s).

View 3 Replies View Related

Dynamic Dropdown List And Calculation Number Of Working Days / Weeks Remaining

Oct 30, 2013

I'm currently trying to set up a sheet ...

When setting up a Direct Debit There are 3 options, the 7th, 17th and 27th. I've put these into a drop down list. I need this list to be slightly dynamic. I must allow 10 working days from the date of the arrangment before I can apply the DD.

To explain further. If someone were to want to set up a DD and spoke to me today. If they then requested the DD be taken on the 7th, I wouldn't be able to set it up until the 7th of December as 10 working days are required. I'd like the list to reflect this. I can do it in OO with a simple if / switch but excel is a strange creature and I'm not sure how to approach the problem.

From that I think I also need to calculate the number of weeks remaining in the current financial year. I think I should be able to do this by using the Today() function and some maths.

View 1 Replies View Related

Find Out How Many Ticks Were On Green Days, Amber Days And Red Days

Dec 19, 2008

I have a series of data that acts upon a traffic light system, i.e. Green, Amber and Red. These variables are posted along row 1 for example and there are 10 columns. Per column I have a tick and cross to answer a question. How can I find out how many ticks were on green days, amber days and red days? I have attached an example.

View 4 Replies View Related

Count How Many Days Coming Due Within 90 Days Of Each Date Based On Today Function

May 27, 2012

There are dates in column C and I need to count how many days are coming due within 90 days of each date based on the today() function but do not exceed the 90 days.

Countif Today()+90

View 5 Replies View Related

Excel 2007 :: Count Number Of Days Between Two Date Where Off Days Are Friday / Saturday And Holiday

Mar 14, 2014

I am making process TAT(Turn Around Time) which required following information. In Excel 2007.

1-Count number of days between two dates where working days are (Sun to Thursday). So required to exclude (Friday,Sat + Holidays)

A1-Start Date Mar/01/2014
B1-End Date Mar/31/2014
C1-No Of Days 22
D1-Days between two dates 21
E1 To E10-Holidays

2-Count number of days between two dates where working days are (Sat to Thursday). So required to exclude (Friday + Holidays)

A1-Start Date Mar/01/2014
B1-End Date Mar/31/2014
C1-No Of Days 27
D1-Days between two dates 26
E1 To E10-Holidays

Note : Any weekend (off days) dates listed in holidays should not effect the query.

View 9 Replies View Related

Counting The Days Worked And Days Remaining On A Schedule Automatically

Sep 1, 2007

I'm basically looking for a forumla that will count each employees total scheduled work days for the month inserted and then depening upon the day it is will show how many days the employee has left to work for the month.

View 9 Replies View Related

Add Formula To One Past The Last Row

May 17, 2013

I need this code to also add the formula to one past the last Row

Now it goes down column A and if its not null it puts a formula in column D. I need it to also put the formula in column D one row past the LastRow of Column A.

Dim A As Long
Dim lastrowA As Long
With Sheets("Children")

[Code].....

View 1 Replies View Related

Figure Out How To Do An If For The Over 30,60,90 Past Due

Apr 28, 2009

Here is what my table is im working with. The tite "todays date starts in Cell A1 and B1 is =Today().

I need to figure out how to do an if for the over 30,60,90 past due. Here the logic I need to figure out:

in the Over 30 column, the logic of the statement is as follows: If the difference between today's date and the date of the invoice is greater than 30 and equal to or less than 60, the amount goes into this column.(over 30 E3) To get the amount(the ammount in C3) into the Current column, the difference between the two dates must be less than 30. To get into the over 90 column, the difference between the two dates must be greater than 90. You can figure out the over sixty column. And this needs to be copied to the remaining colums

Today’s date: =TODAY() Shop Invoice Date Invoice Amount Current Over 30 Over 60 Over 90 Ludwig's Landromat =TODAY()-72 $432.78 Willie's Washing =TODAY()-107 $565.11 Wash It Here =TODAY()-80 $308.47 Spiffy Wash and Dry =TODAY()-58 $725.37 Water Soap & Hot Air =TODAY()-30 $427.95 Wash it & Dry it =TODAY()-90 $603.91 Acme Wash & Dry =TODAY()-60 $332.35 Totals

View 9 Replies View Related

Converting Days To Years,months,days

Jan 23, 2009

How can I convert the number of days for example 366 days to years, months, days 366=1year, 0 months, 1 day

View 3 Replies View Related

Rolling 7 Days, Extract The 3 Previous Days

Oct 19, 2009

I have a spreadsheet in 2007. Days across the top for an entire year. So 365 columns. I need a macro to extract the 3 previous days , today's column, and the 3 next days and load to a different worksheet.

HTML worksheet A:
1/1/09, 1/2/09..... 10/17/09, 10/18/09, 10/19/09, 10/20/09, 10/21/09 .... 12/31/09
10 11 ... 14 15 17 12 22 ... 28
a g ... g c d d a ... a

the macro would create a worksheet B(if run on 10/19/09):
10/17/09, 10/18/09, 10/19/09, 10/20/09, 10/21/09
14 15 17 12 22
g c d d a

View 6 Replies View Related

Change Days Added To Working Days

Jul 31, 2014

I've got the below so far, but where it says V2>=(Q2+5) , I would like it to add 5 working days instead, is this possible?

Code:

=IF(AND(T2="Awaiting",V2>=(Q2+5)),"Overdue","Raised within 5 Days")

It would also be great if there is a way to say that if T2="Not Required, then put "Not Required" in W2 (where the IF statement is)

View 4 Replies View Related

If Functions And Date :: When Something Is Past Due

Sep 30, 2009

I am trying to create a function that will tell me when something is past due.

I have a excel document for my office's accounts payable, it has a master sheet where all of the companies that we pay are listed, and they are linked so that you can click on the name and it will take you right to the page to see a more detailed breakdown.

I am trying to figure out how to make something on the master page to tell me when something is due, even if it just makes an X when it is past due.

There are about 73 worksheets in this document and each worksheet contains many dates.

Is this even possible for me to do something like this? If not does anyone have any suggestions?

View 10 Replies View Related

Hide Row With Past Date?

Sep 1, 2013

My rows are sorted by date. How do I automatically hide the old ones, but view them when desired?

View 1 Replies View Related

Calcualting Past Due From Dates

Jul 29, 2008

I want to take a date (ex. May 25, 08 is in cell A2) and calculate 30 days (A2+30)June 24, 08(A6) and what i am trying to due is calculate if it is past due.

I used the if command but it does not seem to be calcualting the date plus thirty, it is only taking the date that is listed. (ex. instead of calculating =IF("A2+30"

View 9 Replies View Related

Reminder: Past Due Date

Nov 15, 2006

I want to create an Excel file, which would create alerts/reminders based on dates specified in certain cells. I want to create a database of various events (for ex. Invested in XYZ stock at $10 per share) and put a date in one of the column of each record. I want excel to remind me to take a look at that record after, say, 30 days.

View 3 Replies View Related

Flag Past Due Dates

Aug 18, 2007

to set a conditional format and include a function code in it as well?

I want a spreadsheet to change the color/font of a cell/column based on a comparison of a "start date" cell and a "due date" cell. This is to automate the process of highlighting items that have gone past the due date in the second cell. I was trying to do this by looking at the "now()" function and comparing it to the due date.

View 9 Replies View Related

Loop Macro Goes Past While / Until Parameter

Aug 2, 2012

I am running a macro to loop through a list of codes which takes the unique code, goes to a different spreadsheet, finds related data based on that code and if it meets certain criteria, and retursn the same code if it works. Pretty much a filtering process, but I have it returning the code because I do not want to do the calculations in the Macro itself.

Here is the code:

VB:
On Error Goto Label1
Do
Windows("Byron_MonthlyPDPWellList.xlsx").Activate
Range("A" & I).Select

[Code] .....

"I" begins at 2 and counts up until it reaches Count, which is the number of total rows in the column.

However, when I step through the code, it continues to loop through the code where "I > Count".

I have tried "Until I > Count", "Until I = Count", "While I <= Count". And none of them seem to work. It gets stuck in an endless loop cycle.

View 6 Replies View Related







Copyrights 2005-15 www.BigResource.com, All rights reserved