Plot Bin Average On Histogram
Apr 19, 2012
On Histogram, is it possible to plot Bin averages?
In my data there are two columns, 1) File Size 2) Months and then I have created Bin(months) like 0,6,12,18,24
I want to plot average file size in those Bins. For example I would like to plot what was the average file size in past 6 months, past 6-12 months so on.
View 1 Replies
ADVERTISEMENT
Aug 28, 2002
I would like to create a histogram from experimental data with the normal distribution curve overlaying the histogram.
View 7 Replies
View Related
May 9, 2009
I have been searching to see if it's possible to create a histogram with non-numerical data and it doesn't seem like it's possible. Is there something similar where I can. Count number of occurrences of a string and organize them from most frequent to less frequent? There are about 60 possible strings.
e.g.
ABCDEFGHIJ
1ddhykygghd
2jlqqwertya
3ukhghjklzx
4tukyuuiioa
5xypyjkkadh
Then output the counts of each of the strings (letters in this case) present. I was thinking of just putting them in the same row or column and manually counting, but it doesn't seem like it would be that difficult have it automated.
View 4 Replies
View Related
Apr 25, 2006
I am writing a macro that finds the prime numbers between to numbers chosen by the user. I want to create a histogram showing the distribution of the primes. I was going to use the Histogram tool in the Data Analysis add-in. My problem is in setting the input range. I do not know how many entries there will be in the input range. How can I write the argument so that it can be "dynamic" I can determine how many entries there are after I determine the prime numbers but I am not sure how to put that info into the Histogram argument.
View 4 Replies
View Related
Oct 5, 2006
I'm trying to make a histogram with the data analysis tool. The problem is that whenever I make a chart it doesnt show my intervals correctly. It puts them under the bars instead of between them.
View 3 Replies
View Related
Oct 6, 2006
I'm making use of a histogram to visualize my data. The only problem is that 90% of the data has a value which lies close to eachother but 10% is very different.
For example:
Interval-----Frequency
0-10------5
10-20-----7
20-30-----6
30-40-----0
40-50-----0
50-60-----0
60-70-----0
70-80-----0
80-90-----0
90-100----0
100-110---2
Now the histogram I will obtain won't look very good. Is there a way I can have an interval like 40 - ... which resembles everything above 40?
View 4 Replies
View Related
Jan 12, 2010
I'm trying to use the 2007 histogram tool (or frequency) to show me the frequency of data, but my data is in a different form than required for either of these tools. Let me use the following simple case -- to show the frequency of student grades both tools assume I have a list of student's test grades. What if I instead have more than one column, e.g., "grade" and "number students with that grade"??
My application is actually different, but it's still 2 columns, a numeric property and a weighting factor (e.g., fraction of the total).
View 13 Replies
View Related
Jun 11, 2009
I've been trying to make this work with Chart Wizard and can't. I gave out 331 surveys and the data in each column is the answer selections for each question on the survey - A,B,C,D,E. I'd like to do a histogram for each column simply with the percentage of people that chose each answer selection.
View 9 Replies
View Related
Oct 27, 2006
I have a large table (20,000 plus entries) and I need a way to pull out data that matches criteria in buckets.
For example:
April data (column B) that is from 0 to 30 (column C)
April data (column B) that is from 31 to 45 (column C)
... 46 to 60
... 61 to 75
... 75 to infiniti
Then do it again for May, June, July, etc. I have used DCOUNTs to pull this type of data, but it's a bit cumbersome. Any other ways to pull this type of data from the table?
View 3 Replies
View Related
Jul 11, 2007
I am looking for an formula to calculate the bin width for a histogram chart.
I am thinking of creating 50 bins for the chart. The range (max - min) of the data can be from £10 to £5,000,000.
A straighforward formula will be (max - min)/ 50. But I don't want decimal point in the bin numbers.
I am thinking of using Floor/Ceiling function, to round the bin-width to whole numbers, but 10/50, 100/50, 1000/50,..., 1000000/50 all need to round up/down to different scales! for example, I want 100/50 round to 5, 1000/50 round to 50 etc.....I was wondering is there a formula I can use to calculate the bin-width based on the criteria above or similar?
View 4 Replies
View Related
Nov 30, 2009
Those "False, False, False, False" parameters to run a histogram, whatever do they mean? Application.Run "ATPVBAEN.XLAM!Histogram", Range("Inputs"), Hist.Offset(0, 3), Worksheets("OutputSheet").Range("Outputs"), False, False, False, False
Through recorded code, I've seen that to create a histogram, the third False is a "True"... but let's say I've already got the blank histogram created. I'm running a simulation (where the inputs range is being updated with every run), and I want the histogram to be filled in at the end of all the runs. What do these parameters have to do with it? Having them all as false, like I've been told, isn't working.
View 4 Replies
View Related
Mar 25, 2012
We were working on a set of stock returns using histogram option from the analysis tools. We have not been able to figure out why we have produced two different sets of frequencies over same set of data and one predefined bin range.
Only a few classes present different counts. Can this be due to two different versions of excel were used?
View 1 Replies
View Related
Jul 2, 2014
I'm trying to come up with a histogram chart that adjusts Bin Size based on user input. I've come up with the formulas for Bins and Frequency, but am struggling when it comes to charting the data to dynamically update when the user changes Bin Size. How to make the x-axis dynamically adjust with the number of Bins.
View 5 Replies
View Related
Nov 21, 2006
i m given 12 max value of my 292 cells. now im asked to find number of cells that falls within each of these max values?? im asked t use histogram. how will i do it?
View 3 Replies
View Related
Apr 19, 2006
In the attached sheet I have data in column F and G which I am plotting using the following
Sub evmplot()
Dim i As Integer
ThisWorkbook.Worksheets("sheet1").Activate
ActiveSheet.ChartObjects("EVM").Activate
ActiveChart.ChartArea.Select
For i = 1 To 15
ActiveChart.SeriesCollection.NewSeries
ActiveChart.SeriesCollection(i).XValues = "=sheet1!R[" & 5 + (i - 1) * 13 & "]C6:R[" & 17 + (i - 1) * 13 & "]C6"
ActiveChart.SeriesCollection(i).Values = "=sheet1!R[" & 5 + (i - 1) * 13 & "]C7:R[" & 17 + (i - 1) * 13 & "]C7"
Next i
End Sub
when I =1 , the sereis should be from R5c6:R17C6. But the first series in the plot is from R6C6:R18c6. Same is the case with other series also.
View 2 Replies
View Related
Sep 29, 2006
This may sound like a dumb question, but hang with me. I have two series in an xy plot. One is a line (withOUT markers) and one series is just markers (no line).
The line without markers is created in a way such that it forms a box and whiskers plot. The other series, are trial values that go into the box and whiskers.
I have desperately tried to get the second series (just points) to plot BEHIND the first series (line, no markers). Changing the series order does not work unless both series have lines. I have tried this in a variety of ways (including writing a macro which draws the markers first, and then the lines), but that doesn't work either!
View 7 Replies
View Related
Jun 14, 2013
E11 through E24 contains numbers and a few errors (#N/A) that need to persist (the errors need to show).
E10 needs to show the average of the numbers that are in E11 through E24, and just ignore the errors.
I have many columns like that - where the errors need to show and I need to show an average of the number/values that do appear, ignoring the errors.
View 14 Replies
View Related
Jun 9, 2014
How to plot a step graph?
I have attached a drawing by illustrating the graph that I wish to plot.
Attached Image : jpg Capture.JPG‎
View 9 Replies
View Related
Mar 30, 2014
I am planning on creating a map of a badminton court. I am hoping to record each hit of the shuttlecock with a dot on the map. Of course I want this to be inputted by data rather than manually inserting a circle shape and placing it in the correct location each time.
is there any way to do this in excel?
View 14 Replies
View Related
Jun 3, 2014
I have a pareto for a manufacturing facility that has a list of nonconformists and their occurrences in columns K and L. My issue is since it is a running total for the year at certain times the values are 0 for the number of occurrences. This calculates fine, but the graph is very large and the failures are all located on one side instead of being evenly distributed. I am trying to get it to only plot for what has occurred and not have a bunch of blank values. To make it a little more complex I'm trying to avoid macros.. I can get them to show up blank just can't get the bar graph to resize itself to fill the chart.
View 3 Replies
View Related
Jul 9, 2014
I would like to make a histogram using excel. I have successfully made the bins and frequency functions. Once I want to add the x values, I get an error. There are many examples online, but I can't get it to work.
[Code] .....
View 1 Replies
View Related
Mar 15, 2012
I have data that starts from say, 17:50 hours. However, I would like the chart to start from 00:00 to 00:00 so it is a full 24-hour period. So up to 00:00 to 17:50 hours, it would be blank then the data will be plotted from 17:50. How do I do this? If I select the existing data from 17:50 and ask Excel to create a chart, the x axis starts from 17:50 (not 00:00).
View 4 Replies
View Related
Mar 20, 2014
I have a column, call it column1, with thousands of numbers in it.
What I would like to do is get the min of this range, get the max of this range, and plot in a new column all numbers from the min to the max.
For Example
Column1
1
4
9
3
4
4
5
9
2
2
1 is the min, and 9 is the max
I want a new column, say columnNEW
1
2
3
4
5
6
7
8
9
Any clever way of doing this in VBA?
View 7 Replies
View Related
Aug 17, 2008
I have an Excel file with a sheet that has the following columns: Name, Activity, Start Date,
End Date. What I would like to do: I would like to create summary sheet with a calendar-like
matrix, with the names as rows, and dates as columns. I would then like to plot the activity in
the corresponding dates (based on the start and end date). Note: If there are schedule
conflicts, the conflict should show up in another row
- Is this even possible to do in Excel?
Source:
Name Activity StartDate EndDate
PersonA Vacation Jan1 Jan3
PersonA Office Jan4 Jan5
PersonA Field Jan6 Jan7
PersonB Vacation Jan1 Jan3
PersonB Field Jan4 Jan7
PersonB Office Jan5 Jan5
Summary:
Name Jan1 Jan2 Jan3 Jan4 Jan5 Jan6 Jan7
PersonA Vacation Vacation Vacation Office Office Field Field
PersonB Vacation Vacation Vacation Field Field Field Field
PersonB Office
View 9 Replies
View Related
Aug 1, 2006
on a macro or vb code that can search a date and shows everything related to the date? My problem is when i select a certain week for example first week of july. I need a macro of VB code that can find all the dates (or days) in an array of dates and data, which are arranged randomly, that falls in that week and copy them to another worksheet. I have attached the file with this message.
View 9 Replies
View Related
Dec 6, 2006
I have some weekly data that I need to produce a graph from (100% Stacked Column). Each time I create the graph using the dates as the x axis i only get a thin line which looks like it represents one day, the other space looks like it is for the other 6 days of the week. I know that you could add an apostrophe to the beginning of the date but this is to be an automated report.
View 9 Replies
View Related
Oct 8, 2007
I have a set of data which indicates readings taken at different dates/times at varying intervals.
I want to create a chart where time is the X-axis but the usual charting feature would spread the data points at regular intervals. I want the data is spread out across the X-axis according to the actual timings.
I have a sample data in the file attached to this posting. There I showed the type of chart I want to see (which I achieved only by modifying the original set, Table 1. The modified set of data is in Table 2)
how to achieve this with the original table of data, Table 1.
View 9 Replies
View Related
Jan 1, 2008
I am trying to figure out the best way to plot this data -- For each region, I want to plot December 2006 snowfall against December 2007 snowfall. So starting on row 12 to row 41 (in the attached file). First challenge: the dates are not aligned because it is using the retail calendar where 12/3/2006 is compared against 12/2/2007. How can I plot the snow depth for the Northeast for example? I can't just use a dual axis chart because there are also dual dates...
View 3 Replies
View Related
Feb 2, 2008
I got the following table and it generates a random number either 1 or 0 (win or loss)
trade win/loss Account value
0 10,000
rand() 1 0 9,800
rand() 2 1 11,000
rand() 3 1 12,000
rand() 4 0 11,500
Each time I press F9, the Account value changes because the win/loss is generated randomly. Assuming, I press F9 100 times, how do I create a scatter plot chart with a best line fit for all the account values. I know how to create the scatter plot but how do I save all the values everytime I press F9.
View 9 Replies
View Related
Mar 27, 2014
I'm stuck at a point in a graph that I am creating. Attached is as far as I have gone and now i'm having a gap on how to take the 2006, 2007 which is already in graph and add in how these years compare to guidelines visually in the same graph?
for instance ratings 1-9 are grouped in guidelines 1-4, 5-7 etc. How do i add in the 3 guides against each point? I have thought about adding a secondary axis but not how best to demonstrate the range of 1-4 to appear behind or above those points?
View 1 Replies
View Related