Rolling Time Formula - Possible To Fill In Gaps
Jul 30, 2014
I have attached a work sheet where I have part of a formula working.
Although what I am trying to achieve is in the example in column B.
It is possible to fill in the gaps as in column B with the task between the time frames.?
View 2 Replies
ADVERTISEMENT
Mar 21, 2007
I have a sheet of over 40000 rows, I attach a sample. Column a is called dam and column b is called damsire. Each dam has only one 1 damsire. Both column a and column b are sorted ascending. Unfortunately there are big gaps in column b. some of these can be filled in as we have the information e.g. b38 and b39 should be Manila..as the row 37 tells you the correct damsire. Similiarly b49 could be filled in as shernazar. I want to create a new column which contains a formula to fill in these blanks. of course some of the blanks cant be filled in as the information is not there e.g. b23 to b28.
View 3 Replies
View Related
Mar 29, 2012
I get given a csv file on a monthly basis which contains consumption data per day for the specified period. This sounds simple but on occasion (more often than not) the data has missing days. This can cause me problem later on in my analysis.
I can happily total the monthly consumption using the date and month text. What i want to do however is to sort the csv file into daily consumption and highlight the missing days i.e. have a range of the days in the month and allocate the daily data to the correct date. I currently do this manually but know that there must be a better, automated approach... searching for matching dates for example?
In my head i'm thinking the following approach but lack the coding skills to do it.
1. Define the start and end dates. Perhaps count the number of days between the two dates and autofill the start date down the appropriate number of days in column A?
2. Paste the csv file into a different sheet and, starting from the top, cut and paste the csv data to the correct date created in step 1. Do this for each row based on the csv data.
View 1 Replies
View Related
Dec 21, 2006
I have been browsing here off and on, and have found many excellent answers. I use Excel to process data on time series, as an adjunct to consultancy work on statistical analysis of industrial data . Usually the data has irregular gaps, e.g., daily data might have 2-10 day gaps. If I want to take, say, 7-day averages, SKIPPING OVER gaps longer than 2 days(say), is there an easy way to do this (I don't really know VBA,and it is not worth my time to try and write long code for this, which will eventually be done by some professional programmers)!
View 9 Replies
View Related
Jan 21, 2009
I get sheets, sometimes 10 records, sometimes 1,000 records. And there is a time column. It's formatted as: hh:mm:ssam (09:12:36am). Now what I need to do is find a way to highlight any record that has a large gap between itself and the record before it. This gap amount can be variable, but for the explanation lets say, I need to highlight any record that has a gap of 5 minutes greater than the time before it.
I've tried a formula I found elsewhere:
=F3-F2> 1/24/60*5
But it just returns "#VALUE!".
I'm completely stumped, and since about last week, 1 of my daily responsibilites will be analysing anywhere from 10 - 50 sheets a day.
The guy before me would open the sheet and manually find it by literally looking from record to record. This was this 1 guy's full time job. From what I'm reading around there are ways to have excel do this for me with a simple formula and conditional formatting.
View 9 Replies
View Related
Aug 18, 2009
Whenever I add new data I need two cells of the old data to not be counted. This should continue until old data isn’t being counted anymore.
EXAMPLE:
New Data entered Cell C36:E36 (148, 147, 214)
Old data shouldn’t be counted anymore from Cell C67:E68 (137, 152, 156, 94, 117, 158)
Total before New data Entered: 14066
After New data Entered: 13761
This formula is required for a total of 16 weeks or until all the old data isn't being calculated anymore in my rolling total.
I only need one total the three examples are just showing what the total should be calculated.
Sheet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xamples140661376113305Excel 2007
View 9 Replies
View Related
Jun 25, 2014
formula to input to excel to get the dates rolling down in A cell i want it to go A1(1/1/2014) A2(1/1/2014) then a3(2/1/2014) a4(2/1/2014) a5(3/1/2014) a6(3/1/2014) i have a lot of these dates to put into excel
View 5 Replies
View Related
Jan 24, 2014
I am trying to create a formula that looks for the last populated cell, counts 12 cells back and returns an average for all of the cells in that range. I know I have done this before with some combination of INDEX and COUNT, but I can't seem to remember how I did it and my experimenting is not proving fruitful.
Attached is a simplified version of the layout I am working with
View 1 Replies
View Related
Dec 3, 2008
I am trying to do is create a total of only the last 90 days of entries from a list of $ amounts. Attached is an example. We are going to start keeping track of our cashiers variances but at the top of the sheet we only want to know what their last 90 days of entries equal.
This would be considered a rolling 90 days, so older variances drop off after 90 days, they would still be left on screen but would not effect the main total.
View 4 Replies
View Related
Mar 16, 2010
See Attached.
The YTD 10 column is fine that will change everytime you update each month. I was wondering if there was a formula I could use for the Rolling 12 month Column.
At the moment it is averging from Mar 09-Feb10 which is correct but when it comes to putting in data for Mar 10, the Rolling 12 month column will obviously not change.
Is there a way of moving the formula along one each time you input data into a new month. So when Mar 10 has been entered the rolling 12 month column will pick up Apr-09-Mar-10 then when Apr 10 has been entered the formula will change again to May-09-APr-10?
View 6 Replies
View Related
Jul 25, 2014
I have a column of values (E4:E87). I'm adding 1 value to this column manually each day...so tomorrow (July 24th) I will have E4:E88...and so forth. Each day is a new row.
In column Z (i.e. cell Z87) I have the formula =(SUM(O53:O87))/(SUM(E53:E87)). Z88 will have
=(SUM(somevalue:O88))/(SUM(somevalue:E88)). This gives me a resulting percentage for a rolling period of time.
I need an automated way to populate "O53" and "E53" ("somevalue") in the formula so that the SUM of the current row's cell (i.e. E88) through [whatever] is 50 or greater. (The sum of the values should be as small as possible, but at least 50, and should not include any older values than absolutely necessary for it to equal at least 50.)
An image of my spreadsheet can be viewed here: [URL]
View 3 Replies
View Related
Mar 2, 2009
I've got a "Date" Column which has every day of every month, and next to that several columns with different types of data to correspond to a particular date.
To simplify this (because there are TONS of dates), I've made another "Date" column that displays only every 5th day. Now what I'd like to do of course is average the corresponding data over five days.
I don't know how to write a single formula that I can copy down that will do this.
I've attached a sample spreadsheet with only one month's data, the stuff I need a formula / code for is in red
View 2 Replies
View Related
May 13, 2006
I'm having a problem with a list that I've created. The list is in cell A1, the base data for the list is in the range B1:B50. The problem is that data in this range is dynamic, i.e. it has formulas and depending on the result of these formulae the cells in the range either have a value or the cell is left blank. The problem this causes is that the list ends up having gaps in it because it uses blank cells as well. And this is despite me specifcally ticking " Ignore Blank " in the Data Validation menu where I'm creating the list.
View 2 Replies
View Related
Jan 24, 2009
I have 2 cell, A1 and B1. When any data is entered into A1, B1 will display the time corresponding to when the data was entered.
I was thinking about function for B1 would be "=IF(A1="","",now()) ". It worked such that it will display the time, however the value in B1 will automatically update itself if I were to randomly input any data in any other cell too.
For example, I input "testing" in A1. B1 display "11:20PM". Ten minutes later, I input "hello" in A2. B1 now display "11:30PM".
Anyone know a way to stop B1 from updating? or only update when new data is entered into A1 only?
View 10 Replies
View Related
May 13, 2009
Is there a way to have a drop-down list fill two columns (actually, two adjacent cells) when a selection is made from the drop-down list? Maybe using an array in the source formula?
For instance, let's say I pick a doctor from the drop down list, I would like the doctor's practice to automatically fill the cell next it so that the two always go together correctly. In the lists example below, when I select Dr. Elmer in column A, then I want Internal Medecine Associates to go in column B.
MD Practice
Dr. BartholomewCentral Endocrine Specialists
Dr. Elmer Internal Medicine Associates
Dr. StamfordCardiology Associates
View 5 Replies
View Related
Aug 9, 2008
i have a time series of data at one hour interval ( from 6:00 hrs to 18:00 hrs ) each day and again from 6:00 to 18:00 hrs next day and so on for several years. in this series many data are missing. i ve to fill in these missing data in such a manner so that the new values becomes the linearly interpolated values in between the data given at any two hours. no rows are allowed to be inserted in between 18:00 hrs of the previous day to 6:00 hrs on the next day. pl see the attatchment.
View 2 Replies
View Related
Nov 10, 2007
I have a column in which I enter a date, and an adjacent column which automatically enters a sequential number, using ...
View 10 Replies
View Related
Feb 29, 2012
I have around 2368 rows for in each column and I have around 8 columns and what I need to do is to remove any gaps. I do not know how to attach picture here, but I can explaining it in words.
A1: 0.9
A2:
A3:
A4:
A5: -0.09
A6:
A7: 0.4
Is there a way to eliminate those gaps (A2, A3, A4, A6...) in one go?
View 9 Replies
View Related
Feb 7, 2014
I have a problem ranking a large dataset(more than 30000 rows, 16 different columns need to be ranked). My problem is that I dont want the ranks to have gaps when there are ties.
See how it should be in table below.
Ext P$
Rank
Should be
2,128.34
1
1
[Code]...
I do have a working solution with an array formula similar to this, but it slows down my macro (30 minutes instead of 10 seconds) as I need it to calculate 16 times
Code:
=SUM(1/COUNTIF(A$2:A$35000;A$2:A$35000)*(A$2:A$35000>A2))+1
I was thinking of using a for next loop to rank sorted columns but I dont know how to set it up properly.
View 3 Replies
View Related
Mar 13, 2014
I'm wanting to do is drag a formula down and it drop to the next cell rather than the same row number I'm on. For example I'm trying to concatenate a list of phrases whilst changing the main word. Here's an example of the excel sheet
Base Terms
Phrase
Result
car
red
van
blue
bus
red
blue
There is meant to be a space after the second red and blue enabling me to make (in order), red car, blue car, car red, car blue
How can I make it so I've done the relevant concatenate formulas for A2 with the B column and simply drag it down and Excel will switch from A2 to A3 and so on when I've dragged out the 4 formulas?
View 5 Replies
View Related
Dec 31, 2008
I have a file that contains addresses in column C. I need to find any gaps in addresses.
Ex:
211 Corbin Dr
213 Corbin Drive
214 Corbin Drive
123 Apple Drive
124 Apple Dr
124 Apple Dr
127 Apple Drive
I want to identify that there is a gap between 211 Corbin and 213 Corbin and 124 and 127 Apple Drive.
Currently the address including house number are in column c. However, I split the house number into a separate column and the street address in yet another column. There are also duplicates which I have identified by using conditional formatting to highlight the duplicates.
View 9 Replies
View Related
Jul 17, 2007
how I can format this timeline better (it was a to,e;ome template created by someone smart on this forum) - so that there isn't a huge gap between 1892 and then 1977... and then so the rest of the data isn't scrunched together.
View 4 Replies
View Related
Jul 20, 2012
I am having trouble getting a VBA code to do the following:
2012/05/01 00:00:00
2012/05/01 00:03:00
2012/05/01 00:06:00
2012/05/01 00:15:00
2012/05/01 00:18:00
From this above to this below
2012/05/01 00:00:00
2012/05/01 00:03:00
2012/05/01 00:06:00
2012/05/01 00:09:00
2012/05/01 00:12:00
2012/05/01 00:15:00
2012/05/01 00:18:00
There are data entries next to these time stamps. I am able to create just the time stamps starting at the beginning and ending at the end of the month but I need it to fill in missing entries in a data set. The code below works but only some of the time. I have tried a few different things but nothing works.
Code:
Sub Insert_missing_3min()
'Inserts a row with the date and time where the missing date and time stamp is and a zero next to the date added.
Dim min3 As Date
Dim CurTime As Date
Dim CurCell As Date
Dim NextCell As Date
min3 = 3 / 24 / 60
[Code] ........
View 1 Replies
View Related
Jul 20, 2009
I have a load of postcodes over 8 different tabs, the problem is the format of the postcode is wrong. I basically need to delete the first gap of each cell to make the postcode valid -
DL 7 9
DL 8 1
DL 8 2
DL 8 4
DL 8 5
DL 9 3
DL 9 4
DL 10 4
DL 10 5
DL 10 6
DL 10 7
DL 11 7
You see I need to have it like DL7 9, or DL10 7, but i'm not sure how, I've attached the file so you can have a look.
View 5 Replies
View Related
Nov 13, 2009
I'm doing some simple data extraction, e.g.
A B
1 bob 3
2 mandy 4
3 charlie 6
4 dave 1
5 steve 5
So I had in c1 to c5 = =if(b1 > 3, a1,"") autofilled, which works fine, but I end up with,
gap
mandy
charlie
gap
steve
how would I get,
mandy
charlie
steve
also is it possible to have an if statement in 1 cell change the value of another cell?
e.g.
in a1
if(b1>5, c1="yes",c1="no"), can't seem to get it to work
View 14 Replies
View Related
Feb 1, 2012
Is there a formula to count gaps? If you see the sheet below, I want to count maximum gaps in range A1:J12 and put that count in column L.
******** ******************** ************************************************************************>Microsoft Excel - Book2___Running: 11.0 : OS = Windows XP (F)ile (E)dit (V)iew (I)nsert (O)ptions (T)ools (D)ata (W)indow (H)elp (A)boutL12=ABCDEFGHIJKL1X XX XXX 22X X X 33 X X 64X X 85X X X X 26 X X 47 X X 48 X X 59 X X 610 1011 X X X X X 112X 9Sheet1 [HtmlMaker 2.42]
To see the formula in the cells just click on the cells hyperlink or click the Name box. DO NOT QUOTE THIS TABLE IMAGE ON SAME PAGE! OTHEWISE, ERROR OF JavaScript OCCUR.
View 9 Replies
View Related
Nov 20, 2006
I am trying to get two shapes to butt up to each other. Unfortunately the shapes either leave a small gap or a slight overlay. I have tried using Ctrl + arrow key to move in small increments, but that didn't work. I have also tried adjusting the width of the rows, but the rows jump backwards or forwards to a number instead of staying with the number I entered. I want to create a seamless shape out of many different shapes.
View 6 Replies
View Related
Jan 2, 2008
I have what is probably a simple problem for most, but can't figure out what to do.
In the sample sheet attached, I have times in column E, and an action describing what has happened in column G. What I want to do is calculate the length of time between an opening action and closing one, but don't know how to go about it, as there can be an empty cell(and sometimes more) between each open and close.
View 9 Replies
View Related
Apr 17, 2007
Let's say I have column C blank, but every time it's filled in with something I want column A to be today's date and B to be current time. Unfortunately, the functions NOW() and TODAY() don't give me what I want. They get recalculated every time that I update the spreadsheet.
Another thing that I can do is just press ctrl+shift+; to generate a non changing date/time, but I want it to happen automatically (being super lazy).
View 9 Replies
View Related
Jul 17, 2014
The solution can be either in VBA or conditional formatting, if possible.I have product names on column A and weeks as from column B where I have the quantity sold. So, every week I'll have an additional column.
A B C D E ...
Product Week1 Week2 Week3 Week4...
What I need:
If the cell is filled, highlight it in green.
If the gap (empty cells) between weeks is =1, highlight it in yellow
If the gap (empty cells) between weeks is >1 but <2, highlight it in orange
If the gap (empty cells) between weeks is >2, highlight it in red
The attached example better illustrates the needs : Example.xlsx‎
View 4 Replies
View Related