Show Late & On Time Based On Dates
Dec 14, 2007
I'm working with data as displayed below. My objective is to create a table by Model with summed quantitiies in two columns representing On-Time and Late. On-Time is achieved when Date Shipped is on or before the Promised Date. I have included the required format to be achieved in the second example. I'm willing to work with macros or VBA for the solution. I just need guidance to learn how to accomplish this task.
CREATE TABLES LIKE BELOW?
----B---- -----C------ --D-- ----E-----
6 Promised Date Shipped Inspection
7 Date Mod #
8 11/30/07 11/01/07 780 15216
9 10/10/07 11/01/07 230 15174
10 11/20/07 11/07/07 665 16314
11 9/13/07 11/07/07 230 15008
12 12/10/07 11/08/07 780 14452
13 11/15/07 11/08/07 780 15233
14 12/18/07 11/12/07 665 15219
15 12/3/07 11/12/07 780 15224
16 10/14/07 11/12/07 230 15011
CREATE TABLES LIKE BELOW?
-N-- ---O--- -P--
7 Mod On Time Late
8 225
9 230
10 335
11 555
12 665
13 780
14 1120
View 2 Replies
ADVERTISEMENT
May 13, 2014
All i want is to give solution for this time in and out.how to deduct late minutes to the salary of staff.
Date IN OUT
Thu 4/3/20149:1418:39
Sat 4/5/20149:0117:56
Sun 4/6/20148:5817:58
Mon 4/7/20149:1217:50
Tue 4/8/20149:1618:00
Wed 4/9/20149:0216:06
Thu 4/10/20149:1017:54
View 5 Replies
View Related
Jul 2, 2014
I am putting together a simple table to display current week's data vs previous weeks. The current week's data is drawn from a status chart which changes frequently. The constant change is fine for 'Current' as I only want the current data displayed.
The problem I am having is calculating the number of late jobs that existed during the previous week.
The status log has a due date which is compared to the current date to determine 'on time' status for the current week.
Due dates are reissued regularly so I can't use
=COUNTIF(RANGE,WEEKNUM(NOW()-1)) to return data about last week from my status chart.
I have available a 'Movement Log' (in the workbook but a separate worksheet) which tracks the changes in the due date field, but I'm not sure how to integrate that data to calculate the # of jobs that were running late from the last week.
My thought is that I need to perform a count of the # of late based on a comparison of 'due date' to 'date of the last day of last week' with a way to insert the "old due date" from the movement log to replace what is shown in the status log if necessary.
Movement Log.JPG
Status Chart.JPG
View 1 Replies
View Related
May 11, 2009
I have a column filled with dates in DD/MM/YYYY format. They go back to 2006.
I want to filter all dates from last monday onwards how do you do this?
View 10 Replies
View Related
Aug 17, 2008
I want to a create a formula that reviews a series of start dates and end date, then sums the number of days (if the end and start date are withing a yearly period). i.e.
Column A = Room No
Column B = Start dates
Column C = End dates
Column A references a list of rooms (Room List)
If Column A = Room123
If start date is equal to or greater than 31/12/2007
If end date is less than or equal to 31/12/2008
Calculate the number of days used.
View 4 Replies
View Related
Mar 19, 2009
I am trying to write a formula that will have the cell display todays date if it is after 2:00PM, and if it is before 2:00PM I need the cell to display Today()-1. I have tried several iterations and I'm stumped.
View 5 Replies
View Related
Apr 27, 2014
Formula to calculate time allotted minus time used and show the difference in hour and minute.
View 1 Replies
View Related
Jul 31, 2014
So I have two dates:
Opening Date: 29/07/2014 13:27
Closing Date: 29/07/2014 14:42
These are formatted in DD/MM/YYYY and HH/MM
I need to subtract the dates and find the time taken from the opening and closing time.
View 3 Replies
View Related
Jul 15, 2014
I have 4 distinct columns.
Adm Date Adm Time Trans Date Trans Time
1/16/2014 937 1/16/2014 1045
1/1/2014 121 1/1/2014 121
1/14/2014 800 1/11/2014 735
1/30/2014 100 1/30/2014 205
1/13/2014 800 1/12/2014 1202
I would like to calculate the difference (# hours spanned from the dates shown). Unfortunately when we transfer the data the COLON is dropped from MILITARY TIME so I am having problems in the calculation. This is also made more difficult as some of the calculates span over two dates.
View 5 Replies
View Related
Jan 10, 2014
time variation between 2 dates including time (Exclude weekends and holidays), but include the worked time of weekend, if the end date and time falls under weekend or holiday.
Eg., A issues reported on 01Jan2014 12:00:00 PM and Resolved on 11Jan2014 12:00:00 PM
There are 3 weekends in the above mentinoned date - 5th, 6th and 11th
I can eliminate the weekends using the networkdays formula, but however in this case I need to eliminate 04th and 5th Jan (weekends), but Consider 12 hours from 11Jan2014(which is also a weekend), as the issue got resolved on Saturday afternoon, assuming for critical cases team works irrespective of holidays.
View 1 Replies
View Related
Mar 6, 2014
I have a row with dates in row 4 Every fourth of the month a payment must go out, so I would like to see this date date in row 5.
I made an example with a manual solution, as you can see there are dates noted in cell E5 and in cell AJ5 I would like to automate it.
View 1 Replies
View Related
Dec 20, 2012
I have created a user form where I have two Dates fields. Date Leave (three comboxes, CmbDay, CmbMonth and CmbYear) and then I have written the following code
Private Sub Label4_Click()
If CmbDay.ListIndex -1 And CmbMonth.ListIndex -1 And CmbYear.ListIndex -1 Then
If IsDate(CmbDay & " " & CmbMonth & " " & CmbYear) Then
MsgBox "You selected " & Format(CmbDay & " " & CmbMonth & " " & CmbYear, "dd/mm/yyyy"), , "Date selected"
[Code]....
I have got the code from there.
But I want the show the same date field in another field as Date Join. I have changed the names of Combo Boxes but it is not working.
I want to show the same combo boxes in another field. How do I do that?
View 2 Replies
View Related
Jul 20, 2006
I have a spreadsheet that shows when individuals completed different events. The events are on top and the names are down the side. There are dates in the middle. I would like to know if it's possible to show a percentage of dates that are current- so take the number of fields with current dates and divide them by total number of fields. I would also like to find a percentag of events complete by each individual.
View 5 Replies
View Related
Feb 7, 2014
I want to late coming and early going of employees. eg. office incoming time is 9 am and 5 mints late coming is allowed 9.05am . and outgoing time is 6pm i am not able to calculate late coming if outgoing is 5.30pm and if put formula =IF(E3>=6,0,6-E3) not working properly.
View 1 Replies
View Related
Nov 2, 2009
See the attached spreadsheet and the comment boxes inserted containing my questions.
View 10 Replies
View Related
Dec 30, 2006
I have a very large spreadsheet with the following columns: WO# (number field); Start date (date format MM/DD/YYYY); Frequency (text); and craft (number). I am trying to have code that checks the frequency and if is "Monthly" or "Weekly" it just goes on to the next row; if it is "Annual", it adds 163 to the start date (start date needs to changed to a numeric field); if it is "Semi-annual", it adds 82 to the start date; if it is "Quarterly", it adds 45 to the start date; and so on, there about 20m different frequencies. After it adds the above value to the start date, I need to check if that number is less than today's date (the day I run the code). If it is, it needs to flagged as "LATE" and the whole row of info copied to another worksheet with LATE as the title and all the column headings and info copied to the worksheet. I hope this makes sense to someone because I am a beginner in Excel and even less informed when it comes to VBA. Any help would be greatly appreciated.
The way the process must work is that I need to check the frequency and if it is "Weekly" or "Monthly" , it is ignored and goes on to the next row. All other frequencies are cut in half, i.e., "Annual" is 183 days, "Semi-annual is 92 days", "Quarterly" is 45 days, "2-Year" is 365 days, and so on. This number needs to added to the scheduled start date (now formatted as a number, not a date, and checked to see if it is smaller than today's date (also a number). If it is, it is reported on the second worksheet (titled Late).
View 11 Replies
View Related
Mar 10, 2006
I cannot figure out the syntax for the life of me.
This should work...
Dim DatObj as Object
Set DatObj = CreateObject("MSFORMS.DataObject")
...but it does not.
Also, if it is not possible to late bind to this class,
View 9 Replies
View Related
Dec 7, 2006
I’m developing an application that will be distributed amongst several clients all running different versions of Excel.
I am trying to employ Late Binding, but am runing into an issue with some string functions (like Mid, Right and UCase) and am getting a ‘Can’t find project or library’ error.
These functions work as expected in a blank project.
View 3 Replies
View Related
Feb 5, 2009
I need to calculate the time spent replying to my inquiries: I log the time I receive my inquiry as: 06/02/2009 09:23:00 in column A. I log the time I send my reply as: 07/02/2009 07:23 in column B. In column C, I need to put the Formula that will return the following result: 0 days 22.0 hours.
View 5 Replies
View Related
Dec 31, 2006
I have a very large Excel spreadsheet that is generated through an Oracle application at least once a month at work. I would like some code (either a worksheet function or a VBA) to check and report the following. If the frequency in column C is "Monthly" or "Weekly" just go to the next row. If the frequency in column C is "Annual", add 183 days to the date in column B; if it is "Semi-Annual", add 92 days to date in column B; if it is "Quarterly" , add 46 days to the date in column B; if the frequency in column C is "2-Year", add 365 days to the date in column B. Once the check has been made; I need the new total or date that was calculated checked against the date the report is being run (system clock date). If the date or total days is less than today, a new worksheet, titled "Late" needs to contain that row of data. If the date or total days is greater than today's date, just go on to the next row. I've attached an example worksheet.
View 9 Replies
View Related
Nov 4, 2008
I am creating a register and have got a worksheet with everyone name and dates across the top, the dates are automatically created by entering one date, the dates are weekly. But i want to show when we are on holiday, could i do this by using conditional formatting and if yes, how and if no how else can i do this.
View 3 Replies
View Related
May 8, 2012
i'd like a formula to change a date to month and year
Column E
11 May 201123 November 201108 July 201103 September 201111 March 201224 December 2011
I've used =Text(e1,"MMM") to pull the month through but would like to include the year too.
View 3 Replies
View Related
Dec 12, 2008
I want to use conditional formatting to show when to or more dates in a row of cells are the same.
i.e. A B C D E
16 Dec 29 Jun 16 Dec 20 Apr 15 Dec Etc
How do i do it anyone so that it automaticaly changes as the dates change when new data is added?
View 9 Replies
View Related
Jul 1, 2014
So I have a date in cell A1 for example.
Now if cell B1 is either blank, or more than 6 days from the date in cell A1 I want it to turn red.
View 3 Replies
View Related
Mar 7, 2014
Tried with index & Match formula but it throws errors in few cases becoz Cell value are either stored in general or H:mm formats
For ex.
Cell value "05:07" has a custom format applied (hh:mm), and in the formula bar it is displayed as "05:07:00" which is not what we want. When I change the format to 'General' Excel converts the 'time' to decimal, eg "0.213194444444444".
When I manually enter 05:07 the problem is nearly resolved as it changes to 'general' without turning to decimal, but displays as 05:07:00. The formula converts it to decimal where it throws error.
View 2 Replies
View Related
Oct 1, 2008
I have a formula in Excel2003 that is working fine except for when D12 is blank. When D12 is blank I want the result to equal either zero or blank.
=IF(ISBLANK(E12),NOW()-D12,E12-D12)
View 2 Replies
View Related
Jan 27, 2014
I have in column A the units, and in B and C the date changes. I want, when I pick a month from the box, that it only picks the IN and OUT date that applies to the month that I picked (per unit). For ex: if I choose Month march, it should show only for unit 19902506 for example: A2 and A5. And not A7 and A11. As March falls in between the Start and End Date. Is that passible? Something with OFFSET? I managed to find the latest known date with the formula =lookup (Column M:N) but Im not sure
View 2 Replies
View Related
Apr 15, 2013
I have 3 columns (Name, Pass Date, Fail Date) Each name will only have 1 date in either column B or C.
I want a formula that will say "if there is a date in the pass column (B) then this name is a pass, if there is a date in the Fail column (C) then this name is a Fail"
View 3 Replies
View Related
May 11, 2006
I'm trying to get an excel custom number format to show the difference in two dates as 0 years and 0 months...for e.g.
Cell a1 = commencement date = 1/1/05
cell a2 = expiration date = 12/31/10
Then cell a3 = Lease Term = 6 years 0 months.
View 2 Replies
View Related
Dec 26, 2013
I'm having trouble at getting the overall fastest time to show up. There are tree racers in two heats. Also the times are set up like 0;00.000 because i cant get it to work like MM:SS:MS .
Daytona GTR34.xlsx
View 5 Replies
View Related