Calculate The Time Between 2 Dates And Time
Feb 5, 2009
I need to calculate the time spent replying to my inquiries: I log the time I receive my inquiry as: 06/02/2009 09:23:00 in column A. I log the time I send my reply as: 07/02/2009 07:23 in column B. In column C, I need to put the Formula that will return the following result: 0 days 22.0 hours.
View 5 Replies
ADVERTISEMENT
May 23, 2007
I thought this would be simple but I can't figure it out. I need to subtract the time between two cells. For example:
Cell A1: 6/6/2007 3:00:00 PM
Cell A2: 6/7/2007 2:00:00 PM
Result would be either 0:23 or 23 as in hours.
View 2 Replies
View Related
Aug 21, 2006
I have two Rows of data. Each row contains a unique Name column and separate columns for Date, Hour and Minute. I would like to calculate the Time difference in Days, Hours and Minutes between the two Dates. I’m not sure if the way I’ve set it up is the most practical. I’ll attach the spreadsheet to better explain.
View 4 Replies
View Related
Apr 3, 2014
I have been trying to get excel to calculate elapsed time between two dates using mostly what I've read from other elapsed time posts. But I am clearly missing a step. I'm trying to streamline my process for taxes.
I want to take a time in the format of " yy/mm/dd hhmm " example: 1
3/04/24 2245 ( note its a 24hr clock) 13/04/24 2245 would represent 2013 April the 24th at 10:45PM.
------- A --------------- B -------------------- C
13/04/24 2245 ------13/05/24 0900 ---------[display hrs elapsed] <-- currently get #name?
I have custom formatted A and B to yy/mm/dd hhmm and formatted c to [h]:mm
When you enter b-a in column c you get #name?
If its easier to have the date and time into separate columns I can give that a shot, I was just trying to make it as streamlined as possible for copy past.
View 11 Replies
View Related
Aug 7, 2007
attached is an example of a timesheet we use.
now after lengthy discussions the comany say its not 'in their interest' to use acess so i'm stuck with excel on this one.
I need to sum a column on many critiera, which i feel maybe a job for the trusty old =SUMPRODUCT. But thing is i need to sum a column based on a date range, Rate, Day.
I have manually typed in the number i think it should produce but as far as formulas go
1st off need to calcualte date range, which is situated on the top of the spreadsheet.
2nd some how tell the formula that Normal overtime is either classed as rate 1 Saturdays classed as 1.5 and sundays and bank holidays classed as 2.
View 3 Replies
View Related
Dec 13, 2013
test.xlsx
I need to calculate the time elapsed between start and finish dates. I've figured the TODAY function, as explained here but I'm referring solely to dates in cells. How to?
View 1 Replies
View Related
Sep 11, 2009
I need to determine a formula which will allow me to calculate a future date based upon a current date with varying time periods.
For example:
I have a bill which is paid on the 15th and last business day of each month. I would like to be able to see the next due date regardless of what day of the week it is.
I have a bill which is paid every other Tuesday. I would like to know the next due date without having to enter +14 for every due date in the future. In other words, it is preferable to be able to open the spreadsheet and automatically see the next due date, not use autofill to repeatedly add +14 to a previous date which would limit the # of future due dates that could be calculated.
I have a bill which is paid on the last business day of each month, not the last Friday of each month. I would need excel to return a value for the last day of the month which = Monday-Friday, regardless of what day of the week it may be as long as it isn't Saturday or Sunday(holiday exclusion would be nice but not required).
View 14 Replies
View Related
Mar 8, 2014
production01.png
I am trying to figure a way to search for a cell that has a specific date and time range. There are several cell titles pending on the activity. I want to find a cell that has a time ** 7:30-15:30 , 15:31-17:30, 17:31-20:30. The end result is to calculate the activity between those time periods based on the data cells.
Example
If the date searched time field ** the activity ranges is 1635 I need to split the time and credit the activity time in the 730-1530 time and the rest on the 15:31-17:30 time
I have been able to do it on a single labor group based on time alone, but when I try to add the DATE to it my numbers go null. Eventually i will need to add 11 labor groups daily for weeks at a time .
Excel 2007
View 3 Replies
View Related
Apr 27, 2014
Formula to calculate time allotted minus time used and show the difference in hour and minute.
View 1 Replies
View Related
Feb 7, 2014
the vendor has a 21 hr working window; start from 7am and goes until 4am; Mon to Fri.
Here is a scenario:
- i request for a product information from a vendor on 3-Feb-14 8:00am (Monday)
- he replies with all of the product info on 6-Feb-14 12:00pm (Thursday)
can you find the time in above scenario consideration the working window?
Here is another scenario:
- i request for a product information from a vendor on 6-Feb-14 8:00am (Thursday)
- he replies with all of the product info on 11-Feb-14 12:00pm (Tuesday)
- Sat & Sun are days off but keep in mind that my Friday shift ends on sat at 4am so the networdays formula wont work.
View 2 Replies
View Related
Aug 28, 2009
I am wanting to calculate the the processing time for an order that takes place within normal business hours and workweek. A normal day is from 8:00 to 5:00 If a task is started at 2:00 PM Monday and finished at 10:00 AM Tuesday then the result should be 5 hours as I do not want to include any time outside of normal hours. I can figure out how to subtract dates and times but not how to bridge a day(s). My data is somewhat flexible as I have not started the project yet. I can use separate cells for the times and dates or have two cells that use both incorporate the date and time (8/27/09 2:00 PM) for start and end time or any other idea.
View 6 Replies
View Related
Jul 1, 2012
I have a problem here:
Eg.
A B C D E F G H I
1 8 pm 9 pm 10 pm 11 pm 12 am 1 am 2 am
2 8 pm 11 pm
3 8 pm 2 am
I typed a formula : =if(and(c$1>=$a2,d$1
View 4 Replies
View Related
Jun 19, 2014
I have a userform that time stamps on my userform as soon as i open the form, is there a way that when I submit, that the amount of time that I was on the call to be put in my column on my worksheet as minutes?
View 2 Replies
View Related
Jul 31, 2014
So I have two dates:
Opening Date: 29/07/2014 13:27
Closing Date: 29/07/2014 14:42
These are formatted in DD/MM/YYYY and HH/MM
I need to subtract the dates and find the time taken from the opening and closing time.
View 3 Replies
View Related
Jul 15, 2014
I have 4 distinct columns.
Adm Date Adm Time Trans Date Trans Time
1/16/2014 937 1/16/2014 1045
1/1/2014 121 1/1/2014 121
1/14/2014 800 1/11/2014 735
1/30/2014 100 1/30/2014 205
1/13/2014 800 1/12/2014 1202
I would like to calculate the difference (# hours spanned from the dates shown). Unfortunately when we transfer the data the COLON is dropped from MILITARY TIME so I am having problems in the calculation. This is also made more difficult as some of the calculates span over two dates.
View 5 Replies
View Related
May 17, 2014
I found this formula similar to other formula
NETWORKDAYS(D1,F1)-1)*"18:00"-"9:00")+IF(NETWORKDAYS(F1,F1),MEDIAN(G1,"9:00","18:00"),"18:00")-MEDIAN(NETWORKDAYS(D1,D1)*E1,"9:00","18:00")
By the way ....D1 = start Date
F1 = End Date
E1 = start Time
G1 = End Time
It's GREAT! But now I need include time from 6:00 a. m. to 10:00 p. m. (I already modified your formula:
(NETWORKDAYS(D1,F1)-1)*("22:00"-"6:00")+IF(NETWORKDAYS(F1,F1),MEDIAN(G1,"6:00","22:00"),"22:00")-MEDIAN(NETWORKDAYS(D1,D1)*E1,"6:00","22:00")) because are regular working hours in Colombia but:
1. All the days (Monday to Saturday) are working days
2. I just want to calculate the time in shifts, I don't specify the start date and end date. Example: 8:00 p.m. to 11:00 p.m. Result: 2 hours, because 1 hour is after 10:00 p.m.
This are two different options, so I need two separate formulas.
View 10 Replies
View Related
May 3, 2008
This may be a bit vague but here goes.
I have to calculate the difference between the start time and end time of a job. The only catch is, how can I avoid calculating "out of hours" time. So, if a job goes from 9am to 9am the next day, I want it to avoid calculating between the hours of 23:30 and 03:30.
Another example is if a job goes from 02:00 to 04:00, I want it to avoid the tim between 02:00 and 03:00.
If there is a difference in days, so the job goes overnight, how do I take that into consideration also.
View 9 Replies
View Related
Aug 16, 2008
I've got a time difference from 8:00AM - 12:30PM as 4.30 I'm trying to get the minutes, .30, converted into a 6 minute increment, .5. Is it possible to do this and if so how would it be done? Below is a chart of how the time is converted from 6 minutes increments into decimal form.
6 = 0.1 36 = 0.6
12 = 0.2 42 = 0.7
18 = 0.3 48 = 0.8
24 = 0.4 54 = 0.9
30 = 0.5 60 = 1.0
View 5 Replies
View Related
Aug 11, 2006
I'm trying to devise a formula to produce "days in inventory" based on the following data:
Date In
Date Out (which may be blank if cargo still here)
Todays Date
Days in Whse (which is the formula I can't figure out!)
It needs to work like this, date out - date in, unless date out is null. If date out is null, the result should be calculated based off of todays date - date in.
View 3 Replies
View Related
Jan 10, 2014
time variation between 2 dates including time (Exclude weekends and holidays), but include the worked time of weekend, if the end date and time falls under weekend or holiday.
Eg., A issues reported on 01Jan2014 12:00:00 PM and Resolved on 11Jan2014 12:00:00 PM
There are 3 weekends in the above mentinoned date - 5th, 6th and 11th
I can eliminate the weekends using the networkdays formula, but however in this case I need to eliminate 04th and 5th Jan (weekends), but Consider 12 hours from 11Jan2014(which is also a weekend), as the issue got resolved on Saturday afternoon, assuming for critical cases team works irrespective of holidays.
View 1 Replies
View Related
Dec 19, 2008
I have a worksheet which contains START TIME in column A, then TIME USAGE in column B and END TIME in column C. User enters start time, followed by the number of time usage in minutes, how could i possibly display the end time automatically in this scenario? how do you add the entered time usage to the start time to display the end time? Say if I enter 1:00 AM at start time and 00:15 minutes on time usage, how can 1:15 AM be displayed on the end time automatically?
View 2 Replies
View Related
Aug 12, 2009
WHen I was a beginner at Excel, I came up with the following formula to calculate the time difference between two "time" values. Since I was too lazy to add a ":" between my hour and minute, I had decided to simply enter the start (column B) and end time (column C) as a military time (e.g., 0100, 1230, 1500, 1930, 2300, 2359). The following formula would be in Column D.
=IF(C7
View 9 Replies
View Related
Aug 6, 2014
how to find the average times of two different sets of groups. There are the baseline times and intervention times. Both groups have three subtopics: Time Fell Asleep, Woke Up, and Duration (how many hours I slept). I am not sure how to find the average of each subtopic. Here are the times....
Baseline times:
Fell AsleepWoke UpDuration
2:30 AM10:00 AM7:30 hrs
4:30 AM12:30 PM8:00 hrs
[Code]....
View 3 Replies
View Related
Jun 23, 2009
I have a problem with a time card i am producing. I want to count hours and minutes worked and carry forward any surplus or deficit into the next week. I can do it if the hours do not total more than 24. I have attached the file and it is formatted in 1904 format.
View 2 Replies
View Related
Dec 12, 2009
I am staring at this excel spreadsheet blankly ... I am at a loss as to how to accomplish the detailed analasys but simple math this spreadsheet reequires.
The data consists of three columns pasted from a report that is exported as a .csv:
B
Code
C
Start Time
D
End Time
The following analyses must be made on each row:
1. determine if the start time falls within the scheduled shift
View 9 Replies
View Related
Jul 14, 2010
I need to compute the total time in a userform.
I have a userform where:
1. User enters a start and end time Start1, End1 (23:00, 01:00)
2. The time difference is calculated and displayed in Total1 (2:00)
3. User enters Start2, End2 (22:00, 22:50)
4. Time difference calculated - display in Total2 (00:50)
5. Grand total of Total1, Total2 is displayed in GrandTotal (2:50)
The user will input the times as 0000 but I need to convert the entry into a time format. (User enters 1235 - I need it to covert to 12:35)
View 5 Replies
View Related
May 15, 2012
I have a calendar. All months across the top, formatted as date mmm with content 1/2 2/1 3/1 4/1, etc. so the cells display Jan Feb Mar Apr, etc. All days down the side formatted as number displaying 1, 2, 3, 4, etc. All the days of the year are formatted as time h:mm.
I want to create a cell that shows me the total time for the last 14 days.
View 1 Replies
View Related
Feb 17, 2013
I have 3 numbers:
1) Current Speed
2) Current Acceleration
3) Acceleration Growth
Assuming:
Current Speed=0
Current Acceleration = 0.2 (each 'turn' the current speed will increase by this much)
Acceleration Growth = 0.2 (each 'turn', the current acceleration will grow by this much)
This gives a current speed over a series of 'turns' as
0.0 + 0.2 = 0.2
0.2 + 0.4 = 0.6
0.6 + 0.8 = 1.4
1.4 + 1.0 = 2.4
2.4 + 1.2 = 3.6
3.6 + 1.4 = 5.0
5.0 + 1.6 = 6.6
6.6 + 1.8 = 8.4
8.4 + 2.0 = 10.4
etc.
What I'd like to do is have a formula (or some way other than calculating each step) to tell me how many turns it would take for the Current Speed to =>X (example 100)
Basically, Turns to X speed = something clever * acceleration growth * something else very clever.
View 9 Replies
View Related
Sep 3, 2009
I want to be able to calculate a due date two days from an entered date/time. If I input 9/3/2009 3:00 PM into cell F6 I would like cell G6 to display 9/5/2009 3:00 PM. The formula that I am currently using includes a holiday list so if the due date lands on a day within that list it gets pushed out.
My formula is =if(F6="","",Workday(F6,2,Z1:Z144)).
Basically when F6 gets populated G6 is supposed to populate with a due date of two days later (same time of the day). Currently if my input date/time is 9/3/2009 3:00 PM the formula is displaying a due date of 9/5/2009 12:00 AM.
View 9 Replies
View Related
Mar 16, 2004
I need to find the average time it takes students to take exams . I use the following formula =text(end time - start time, "h:mm"). I am able to calculate the amount of time it takes a student to take the exam. Now I need a formula to calculate the average time students take to complete a test. I have over 80 times i need to average. Whenever i try a formula I keep getting 0.
View 9 Replies
View Related