I am making a spreadsheet that requires multiple dates and percentages. Is there any way that I can make the percentage that is related to the most recent date weighted more than a percentage with a date from a month or two ago?
For example:
X//Y//DATE
90%//85%//3-March
85%//70%//21-May
87%//90%//6-June
Is there formula so that I can have the 90% and the 87% be the most important (or weighted), the 70% and the 85% be the second most important, and the 85% and the 90% be the least important when I average them out?
In my spreadsheet (testing.xls) I have a chart to mark the quality of a phone call based on a list of 8elements being judged. I have a likert scale for the quality result for each element, say for example 5 for highest, 3 for average, 1 for the poor, 0 for very poor and NA for an element which is not counted.
At the bottom of my table I have a cell where it would work out the % based on the outcome of the result from the different cells being ticked, what would i need to do to have excel work this out for me? Please bare in mind that if there is for example 1 element out of the 8 elements marked as NA the result would be divided 7 instead of 8.
I have a spreadsheet that tracks productivity for various parts being made basically pcs made per hour against how many pcs should be made per hour shown in a percentage of 100 percent
For example: Part ABC - ran 450 pcs per hour. The rate is 9500 so it ran at 4.74% of the goal
The machine runs about 50 parts.
They had me create a sheet/chart to graph productivity. They told me to just take an average of all the percentage rates the individual parts are running at.
I believe this is where a 'weighted average' should come into play? Taking an average of all those averages is not going to give an accurate overall productivity percentage is it?
How would I go about making a 'weighted' average (if that is indeed necessary) to get an accurate productivity percentage?
I need to create formulas that reference a single date and output date ranges. The objective is to have a person input a Monday date in any given month and receive a four weeks out worth of dates and ranges. For example: In a lone cell, the person inputs 10/13/08. Automatically, the sheet produces the next full week range: October 19 – October 25 in a single cell and also produces a cell for each date. Example: Sunday 19, Monday 20, Tuesday 21, etc…. It should look like:
and then repeat for three more weeks. I thought I had it figured out until the month changed. The dates continued in October instead of adding a month. This report will be ran weekly, so simply adding a +1MONTH to some cells will not benefit me as I’ll have to change the formula every week. I want the formula to compute the data without any manipulation over the next several years. The only change will be the Monday date.
I have a column in a spreadsheet that I enter a percentage complete, or a completion date in, beside it I have a column that shows "diameter inches" I am looking for a formula that will multiply the percentage in the first column by the inches in the second column, and give me a total at the bottom of the page. The problem is that when there is a date entered, I need it to be considered 100% and add the full amount of the corresponding cell to the total.
I have a sheet (example is attached) that lists multiple jobs and their related tasks. I want to know if it's possible to create a conditional formatting that says if the percentage complete under the "task" is under 100% and within X number of days of the target date, it's red/yellow/green.
So, if a target date is 70-100 days out; 0%-10% - RED, 11%-45% - YELLOW, 46%-100% - GREEN
If a target date is 40-69 days out; 0%-45% - RED, 46%-75% - YELLOW, 75%-100% - GREEN
If a target date is 20-40 days out; 0%-60% - RED, 61-90% - YELLOW, 91%-100% - GREEN
If a target date is 0-20 days out; 0%-85% - RED, 86%-95% - YELLOW, 96-100% - GREEN
If a target date has passed, Anything under 100% is RED.
I need a formula that will calculate the percentage of the total duration between two dates (in dd.mm.yyyy hh:mm format) that a third, intervening date represents.
As an example:
a) 10th Jan 2014 09:00 b) 20th Jan 2014 09:00 c) 30th Jan 2014 09:00
In this case the answer sould be 50% because 'b' represents exactly half of the time elapsed between 'a' and 'c'.
Note: the formula needs to work effectively across the boundary between two consecutive years.
I am trying to get a row of cells to highlight a percentage based on a date range
Below is an example of what my spreadsheet will look like, very simple for managers to read and understand but I am stuck on how i can get this to display the right way.
In the example i would need the Jan column to colour for a certain percent for 21 days and continue to feb for 26 days. Im not sure if this makes sense but this is what they are asking for. Colour bars to simple show the percent of days off each month.
Name Start Date End Date Jan Feb Mar
Dale 11/01/14 26/02/14 21 days 26 days
I have attached the spreadsheet for an example : Book1.xlsx‎
How can I reflect the correct trainee count for Day1-Batch1?
Currently columns F,G,H computes for expected, actual and total variances of trainee respectively reference to the training date J3.
Since this is a 2-day per batch even, I could not capture the 1st day trainee total of every batch because I divide the sum by 2 (2 day / training batch). The sum is only corrected on the 2nd day. Attached herein is the sample file.
Where Sheet1!B2, B3 and B4 are the fixed dates (5/15/2010, 8/31/2010 and 10/31/2010). I would like to copy the formula into multiple cells, but keep the references to the fixed dates the same. When I do a copy, paste, the resulting formula becomes:
Trying to use a the getpivotdata fomula with date as an argument, refer to with a cell. e.g. =GETPIVOTDATA( 'May Table'!A1, "SICK " & S20). where S20 is a date format
I'm having serious difficulties with getting together a formula for a little bit complicated lookup.
I have 2 tables. In the first table I have categories in the first column (e.g. red, blue, green), in the second column I have dates (DD.MM.YYYY). And in the third column I would like to get the values from the second table.
In the second table I also have categories in the first column, dates in the second column und values in the third.
I would now like to get the values from the second table that coincide with the categories. And in addition the dates should also be equal to the date in the first table OR the date from the second table should be as close as possible but BEFORE the date in the first table.
Example Table1 Red 07.08.2005 ???
Table 2 Red 18.04.2005 three Blue 11.06.2005 one Red 06.08.2005 four
In this example the value that should be looked up is "four".
I have a pretty elaborate spreadsheet for my bills. One cell adds up all the bills due during a specific pay period using named ranges. The formula looks like this:
It works, but when I have to populate cells for upcoming pay periods, I have to go in an edit the dates manually. I'm lazy, and want to simply reference a cell with the date in it instead of typing the whole date out in the formula. What I'd like to do is this:
I'm using the following formula which is entered by using VBA on the worksheet change event but the cell reference 'A2' is not changing for each row, i.e. A3, A4 etc.....
Code: =MAX(IF( 'Device Use - 4 month Period'!$A$2:$A$20000=A2, 'Device Use - 4 month Period'!$C$2:$C$20000))
Using cell contents in formula to Populating cells with values from closed workbooks I am trying to create a summary table of data (e.g. orders) from previous weeks. In the table I am creating, the left hand column contains the Monday date of the week to be summarised along the row. I want the cells to show the values from other spreadsheets when those spreadsheets are closed, but I want the formula to pick up the date of the week that is in column A. I have attached a sample spreadsheet to try and make it clearer.
I have a workbook that I've built for a project. I've attached a sample workbook. What I'm trying to do, for the entire sheet or workbook if possible, is turn any Cell with a percentage of 30% to 49% yellow and any cell with a percentage of 50% or more Red. I would also like to move the ID's of the variable cells, for example Id number 9922, to the cells beside the description of the rows, Affected would be an example, if the information contained in the same row as the ID meets with a set of variables.
For example I only want the ID's moved if they correspond with IDsub 1-25. One more thing, the people who will be using this spreadsheet will be copying data from a website when it is imported it does not insert the values as numbers. I would like to format the cells, in example workbook they would be any of the cells labeled ID IDsub Variable or Number, so that anything put in that cell will automatically be converted to a number.
I should also probably add that the formatting will be done on approximately 80 rows a sheet with 47 sheets.
I have attached an example spreadsheet which should be relatively intuitive over me trying to explain it.
I am wanting to extract all CJ numbers with the corresponding dates from Sheet 1, into Sheet 2. It has to factor in, engineer name (as stated on sheet 2), the Month (as stated in sheet 2 "May") with the "Attended site" date in sheet 1....
If you see the worksheet it should give you the whole picture with a fair amount of clarity.
The spreadsheet attached is a timesheet I use. The last column on the sheet (IV) keeps a running total of time spent on each project. I need a way that i can find out how much time was spent on projects in specific timeframes (eg 01/01/09 - 07/01/01, or 01/01/09 - 31/01/09). my initial thought is perhaps i can have a "from" cell and a "to" cell to input the dates i require and it will total the relevant cells in the rows below.
NOTE! This workbook uses VBA to auto hide any column which are dates previous to today's date so you may need to unhide them to view times logged.
I have this formula below that counts all matching cells that fall between two dates (a Monday to the next Monday) where S2 and T2 are the dates (one week apart).
I have the below code to get the difference between todays date and the date located on sheet "requests" "B3". The code returns the value: -28040498
Code: Dim MyODateRng As String Dim MyODate As String MyODateRng = Sheets("Requests").Range("B3").Value
[Code]....
So i gues with the first code there is something wrong with the date formating. But i do not understand why the second code does not return simply return the value: 1.
I have a workbook that is pulling data for every hour of the day from an internal website. The macro is built to pull data 24 times (each hour)
ex.(http://url/[""2014/04/01""]/starthour0/endhour1/) (http://url/[""2014/04/01""]/starthour1/endhour2/) (http://url/[""2014/04/01""]/starthour2/endhour3/) and so on.
What I am trying to do is set up a parameter that will reference a certain cell (Master!K5) which will contain the date I need to pull. I want to be able to have that cell referenced automatically and input the date for each URL in the macro.
I'm trying to calculate Interest accrued from a specific date. The problem is payments can be interest only which when used should keep the next months interest at the same rate instead of decreasing because the principal hasn't been paid down.
Im having problems when over the course of a number of payments they are principal + Interest and Interest only which requires at times to add up the same interest amount for 2-3 months in a row, then add up a different interest rate, etc. Additionally if the reference date is say on the 15th and the interest date is the 1st then for the last month I need to calculate the interest on a daily basis based on the current interest rate for that month.
The reference cell is H5, the Date ranges are J2 - J12, and the principal fields are: K2 - K12.
In the next post I will include the Amortization schedule.
In this example the interest is accrued at the same rate months 1-7, then decreased for months 8 and 9. so the total interest accrued should be eqaual to: $7487.74 (see next post for schedule).
Microsoft Excel - ZZ_Loan.Calculator-Update.1.1.xls___Running: 12.0 : OS = (F)ile (E)dit (V)iew (I)nsert (O)ptions (T)ools (D)ata (W)indow (H)elp (A)boutH6H7H8H9H10H12H13H14=FGHIJKLM1 v 1.0 PaymentApply DatePrincipal + InterestAdditional PrincipalInterest Only2 1/1/2009 833.333 2/1/2009 833.334Quarter Close Backward 3/1/2009 833.335 Close Date9/1/2009 4/1/2009 833.336 Days of Interest0 5/1/2009 833.337 Beg Principal Balance$100,000.00 6/1/2009 833.338 Paydowns$980.41 7/1/20091,321.51 9 End Principal Balance$99,019.59 8/1/20091,321.51 10 Net Principle Due$3,562.50 9/1/2009 829.2711 Interest Due & Accrued 10/1/20091,321.51 12 Interest Earned (cummulative)$7,350.66 11/1/20091,321.51 13 Interest pymts (cummulative)$7,350.66 14 Net Interest Receivable$0.00 TEST [HtmlMaker 2.42] To see the formula in the cells just click on the cells hyperlink or click the Name boxPLEASE DO NOT QUOTE THIS TABLE IMAGE ON SAME PAGE! OTHEWISE, ERROR OF JavaScript OCCUR.
I have a spreadsheet set with the days in sach column (eg 29-Jan-09, 30-Jan-09, 31 Jan-09, 1 Feb-09 etc). What I would like to do is hide all columns prior to a date which is entered into a cell/macro text box.