Countif And Dates
Dec 31, 2006
I have a spreadsheet where I am tracking dollars spent for warranty claims. The information is put in, and a date for the claim is put in as well, which is then formatted to show the date. For example, if I type in 01/13, it shows up as 13-Jan. The date column spreads from D2 to D384.
I would like to make a section that will go through the whole column and give me a total number of claims put in for jan, then in the next cell down the same thing for feb, etc etc. Basically it will be something like this:
Claims per month:
Jan 14
Feb 8
Etc,
I have been trying to use wildcards for countif, such as "*-Jan", or even just "Jan" but it is not returning any result.
View 9 Replies
ADVERTISEMENT
Dec 1, 2009
I have two different worksheets.
One has dates recorded as dd-mmm-yyyy (e.g., 28-Nov-2009).
On the other, I have to create a lot (over 1000) of countifs against the months/years of these dates. So, for example, if there are several dates on the first workbook that fall in Nov-09, i want to do a countif on the second workbook that tells me how many Nov-09 dates there are.
View 5 Replies
View Related
Mar 25, 2012
The values on this sheet are pulled from another sheet. For the cells that do not contain a date, excel picks "1/0/1900 as default. I've been trying to define IF/ISBLANK formula, but I can't get it to work.
What I have so far is this:
=IF(ISBLANK(=COLINE!A2),"")
I am trying to perform a count of how many dates appear in one month for a specific Column only.
Logic Statement:
IF Column S contains "KP145", then Count dates in Column I, between 1/1/12 & 2/29/12 only.
View 4 Replies
View Related
Apr 18, 2013
I want to compare a column of completion dates to the due date - and if the value is less than or equal, it returns a count, but if it is greater, that is the action was completed after the due date it does not count.
Initially I was checking only if the due date was there..........=COUNTIF($P$8:$P$37,"26th February*")
View 5 Replies
View Related
Apr 29, 2009
I am trying to solve a a problem that I am having.
I have a list of projects in one column and start dates in a different column.
I want to create a dashboard that breaks down projects by month, quarter and year to date.
I have tried various formulas centered around CountIf. Bottom line is I want to review a column of dates and determine how many projects started last month, etc.....
View 6 Replies
View Related
Aug 10, 2009
I have three seperate Formulas on a summary page that will count dates depending on whether they will be approaching in the next month, whether todays date falls within them and if they are expired or are less than todays date.
Basically the form was developed to monitor a maintanence schedule and give a summary to the person in charge of cleaning so they can forecast there work load. I have managed to get the formula working for "whether todays date falls within them" ("# of Computers than can be cleaned today" as it appears on the summary form) but I cannot seem to get the other formulas figured out.. Well at least the formula that checks to see which computers are past due.
As far as the formula that checks to see which computers will need to be cleaned within the next month, I don't know how to make that work at all considering the setup of my Date input page.
View 10 Replies
View Related
Oct 10, 2011
I've tried IF/AND, MEDIAN and whatnot, but cannot get this to work:
On Sheet1 I have a list of records with date in column C and a text string such as 'Urgent' or 'Nice To Have' in column H. There are hundreds of these records.
On Sheet2, I want a count of rows that have e.g. 'Urgent' -text string in column H. However, I only want the row added to the count if the date in Sheet1/Column C matches between two dates defined in Sheet2.
View 7 Replies
View Related
Sep 24, 2009
I'm trying to set up a worksheet that will automatically count the number of instances between 2 dates, but I can't get it to work.
I have the list of dates from all of my data in column A.
I have the dates I want it to count off of in column C and D.
What I am trying to do is the following
=countif(A:A,and(">C1","
View 9 Replies
View Related
Mar 17, 2009
I have a data feed that gives a column of cells formated mm/dd/yy hh:mm
These are call entries, what i want to do is count all the occurances each hour, so count all the entries say between 9am and 10am. However the column is very long and holds data for many weeks so i want to be able to ignore the date part of the cell.
For example
3/17/09 9:58
3/18/09 10:58
3/18/09 8:58
3/19/09 8:58
3/19/09 9:58
3/19/09 9:58
So the entries between 9 and 10 are = 3
Ideally i do not want to do text to colums and split out the parts. i would like to leave the source data alone.
View 7 Replies
View Related
Nov 14, 2011
I am trying to count the number of dates in November - is there a Countif function or Sumproduct function that would return the number of dates in November?
BroadwayCombined
H3411/4/20113511/4/20113611/4/20113711/3/20113811/3/20113911/3/20114011/3/20114111/3/2011
4211/3/20114311/3/20114411/2/20114511/2/20114611/1/20114711/1/20114811/1/20114910/31/2011
5010/31/20115110/31/20115210/31/20115310/31/20115410/31/20115510/31/20115610/28/2011
5710/28/20115810/28/20115910/28/20116010/28/20116110/28/20116210/28/20116310/27/2011
View 6 Replies
View Related
Dec 16, 2008
I want excel to count the number of items in a range that I have named "Name" and I have another range that I have name "date" which contains (obviously) dates. The dates are in order. I want to count the number of items in "name" that are associated with the date in the "Date" range.
The problem is I want to count the names in a date range, which is todays date through to 30 days after. I have to days date already posted automatically in K1 [by the formula =TODAY()]
Essentially, count all the times "Bob" appears in the Range "Names" that appear in the next 30 days. My Brain hurts just trying to describe it
View 9 Replies
View Related
Aug 2, 2007
I have a sheet that contains dates going back a few years. I am trying to use the countif function to count the different sites in column B according to date. eg I want to be able to find out how many jobs for PHO1 were created between todays date and 7 days ago, this can go into column C, In column D I need to find out how many jobs were created by PHO1 between 7 and 14 days ago etc etc....
View 9 Replies
View Related
Jan 20, 2010
I want to use a COUNTIF to return the sum of all the dates that fall within a given month/year. For example: E1 Contains the date July-2009
Column A has date entries such as July 3, 2009, July 18, 2009, August 4 2009. In F1 I want to return the sum of all dates that fall within the month of E1.
View 4 Replies
View Related
Apr 30, 2013
I have a pivot table and and struggling to group these by month as well as to sort thee in escending order.
Pivot Table  ABC3Row LabelsSum of DebitSum of Credit
413/02/201334367.1822844.19513/03/201326475.492219.66613/08/201230307.613541.2713/09/2012
18898.0318065.4813/10/2012Â 7210.52913/11/201241969.041767.821013/12/201232844.7724041.26
View 3 Replies
View Related
Jun 17, 2007
I have a sheet with a date and the number of months on it which will change. I need the sheet to list the dates in a column for each month automatically: e.g. Two cells contain date “jan07” and the period “10” months. The rows A1 to A10 should have jan07…jan16 listed automatically. If I change then change the number of month to 11 I would like the rows A1 to A11 to update automatically.
View 6 Replies
View Related
Nov 8, 2012
I'm trying to make a simple chart, which maps the value of an investment fund over time. I wanted to use the new 'Table' feature within Excel 2010 to format and maintain the formulae within the Table, and the 'Header' for the table contains the date, which is not at regular intervals.
If I opt not to use the Table feature, I can create a line-chart with ease, and Excel recognises that the Dates are indeed dates and plots the graph correctly. The minute I convert over to a Table, the Date headers are no longer recognised as dates, and are instead plotted as if they were text, at regular intervals.
I've tried multiplying the Date Headers by 1 to force them back to true Dates, but this still does not work. I've also changed the setting on the horizontal axis to Date axis rather than automatic, but still no joy.
View 1 Replies
View Related
May 3, 2009
look at the attached file - it was a CSV file. i want to convert the column of dates to say Mar 14 2009 type date. but it only converts some of them.
note some are on the left and some on the right.
View 5 Replies
View Related
Oct 21, 2011
I am in strange situation where I have a data with Invoice Dates. These dates are in Text. However, when I convert it into reall excel dates. For some reason the dates do not come right. convert my text dates into excel real dates. I did a lot of google search and apply these three methods but all of these gave me strange result I was not expecting. These are the methods I used and the result of each method.
Method 1 : Using Text to Column Wizard (Excel 2007)
I highlighted invoice column and went into text to column wizard. I clikced on Date button, and selected MDY format. Strangely enough, my result was day, month and year i.e. DMY which does not seem right.
Then I press Control ~ on this data as shown in second view.
Inv DateMDY09/22/1122/09/201108/31/1131/08/201108/31/1131/08/201108/31/1131/08/201108/31/1131/08/2011
control ~ (overview)
Inv DateMDY09/22/114080808/31/114078608/31/114078608/31/114078608/31/1140786
2nd Method - Using formula to convert text date to real dates When I used formula, I get the following result. As you can see, formula is converting text dates into different system dates than the first method.Further strange things is when I take these system dates i.e. 4283 and in 2007 excel format use "Short Date" the same system date gets converted into wrong year as shown in the second view.
Inv DateFormulaFormula Result09/22/11=DATE(MID(B2,7,2),MID(B2,1,2),MID(B2,4,2))428308/31/11=DATE(MID(B3,7,2),MID(B3,1,2),MID(B3,4,2))426108/31/11=DATE(MID(B4,7,2),MID(B4,1,2),MID(B4,4,2))426108/31/11=DATE(MID(B5,7,2),MID(B5,1,2),MID(B5,4,2))426108/31/11=DATE(MID(B6,7,2),MID(B6,1,2),MID(B6,4,2))426108/31/11=DATE(MID(B7,7,2),MID(B7,1,2),MID(B7,4,2))4261
2nd view - system dates are getting converted into 1911
Inv DateFormulaFormula Result09/22/11428322/09/191108/31/11426131/08/191108/31/11426131/08/191108/31/11426131/08/191108/31/11426131/08/191108/31/11426131/08/1911
Similarly, I tried other methods or copying blanks etch but none seems to convert text dates into real (system dates).
View 4 Replies
View Related
Feb 23, 2014
Here is my set up:
A2 to BF2 is a range of dates
A3 to BF3 are sales. Days without sales are 0.00
I want to pick a range of dates and find the number of days without sales between those dates. So, a formula that will look to a start date in A1 and an end date in B2, and then count the number of days that did not have sales between. Index/Match/Countif/Dateif I can't seem to make anything work.
View 3 Replies
View Related
May 14, 2009
Hi Guys, This has been bugging me for a bit now and I just can't sus it...
I have a sample perpetual calender that I have been modifying to fit my own purpose. The calender part works fine.
I have beside that a column for holidays, etc and then a another column for other events.
When I put the date in the holiday or events columns I would like the date to be highlighted in the calender above (different colour depending on which column it came from).
The formula I have been playing with (no success) is:
=MATCH(DATE($R$2,1,C8),$I$41:$I$65,0) - This is the Formula for the 1st column of dates.
The 2nd formula is similar, just changes the column it tries to draw the MATCH(DATE.... from...
Although this formula works fine on the sample spreadsheet. When I enter the formula on my sheet, it doesn't seem to work...
I have attached the spread sheet that I am working on.
View 2 Replies
View Related
Apr 4, 2008
there are a multitude of issues with US date formats when you're not in the US but I've run across one that I can't figure out.
I have a source table that has approx 5000 lines on it, everything looks correct and all the dates are in the correct (Australian) format. However when I use it to make a pivot table, any dates that are before the 12/m/yyyy gets changed to the mmddyyyy format in the pivot table only, all the source dates are still correct.
View 3 Replies
View Related
Nov 14, 2013
I would typically consider myself a decent Excel user, but I haven't been able to solve this one. Maybe it's just the lack of sleep now. I am attempting to combine 4 cells into one where the last cell contains a date. Below is the formula I am using:
=B3&" "&C3&" "&D3&" "&TEXT(E3,"m/d/yy")
It works when all of the cells have values, but the only problem I am having is that some of the dates (in column E) are blank. When this cell is blank the default date that displays is "1/0/00." If I add the typical, " " at the end it says the formula has errors. The need for the TEXT(E3,"m/d/yy") for the cells that contain dates is throwing me off.
View 3 Replies
View Related
Jan 22, 2014
I have a tracking template with a column listing dates, all i want to do is find all the missing dates from that column of dates.
Example:
Column A
1-May
2-May
4-May
5-May
7-May
8-May
10-May
11-May
12-May
14-May
15-May
I want to list the missing dates from this list.
View 4 Replies
View Related
Jan 27, 2006
Basically I have 2 columns each with a list of dates in no particular order (and containing blank cells too), one planned date column and one actual date column.
What I need to do is plot this on a graph, and since the number of dates has no set limit and I dont want to have to plot maybe 100 dates on the x axis, so i want to group them by week before plotting them, i.e. 10 dates for week ending 10th jan, 25 dates for week ending 17th jan etc
I have a pivot table that counts how many of each date occurs, i.e. 10 x 2nd jan, 7x 3rd jan etc etc but it does not split them into weeks.
im sure theres an easyish way of doing it so i can get the 2 lines on the graph for no. of planned dates each week and no. of actual dates each week, i just cant see it.
View 13 Replies
View Related
Jan 15, 2009
Today I am having a very annoying problem that really has me stumped – I need to work out the lag between a Due Date and Delivered Date
But as people sometimes manage to deliver on the Due Date it needs to show a zero (as in they got it in on time) but using the formula below the result is a 1 and I want a zero
Can anyone help me please? I have tried putting assorted -1s in to the formula and it looks like it might work until I copy down and find that if a person delivered one day early the result shows -3 for example!
View 7 Replies
View Related
Dec 9, 2013
I have attached an excel sheet for your reference. I have particular debit values that are to be added between the dates. And Dates are also derived by formula based of payment term.
The ones I need to modify is Highlighted in Yellow. The values to be added is in "Customer Statement" and in H Column
These dates also have formula by which there are derived
-------------------------Current Ageing-------------------------
Date Range
Bucket
Amount
Percent
Start Date
End Date[code].....
I am USing =SUMIFS('Customer Statement'!$A:$A,'Customer Statement'!$H:$H,"=" & E11) but does not work.
View 9 Replies
View Related
Feb 4, 2010
In Cells B2:B100, i have dates that which have been entered using a combo box (the dates type is for e.g. 14th March 2010 format)
I want a formula that will count the cells that have dates between 1st April 2010 to 30th June 2010 in cells B2:B100
Also, I would like a formula that counts weekend dates between 1st April 2010 to 30th June 2010?
View 9 Replies
View Related
Oct 15, 2009
I get a spreadsheet every day that has a column of numbers that contains dates that are not in a date format. Is there a way to convert these numbers to a date format? The numbers come from an outside source so I can't modify on the front end. look at the attached spreadsheet with representative data of what I'm trying to ccomplish.
View 2 Replies
View Related
Aug 16, 2006
I have a masive table of dates (the date is created via a if formula)
what i need is so wheni enter 2 dates in 2 cells the system checks all the dates between the two specified and then returns the contents of them to a small area on the page.
Dates To Test 14/08/2026 19/08/2026
Results
14/08/2026
15/08/2026
16/08/2026
17/08/2026
18/08/2026
19/08/2026
Table..............
i dont mind using script or anything like that, i dont have much knowlage of it but do have coniderable understanding of other langages and usually figure it out :D
View 3 Replies
View Related
Dec 31, 2006
I have a very large Excel spreadsheet that is generated through an Oracle application at least once a month at work. I would like some code (either a worksheet function or a VBA) to check and report the following. If the frequency in column C is "Monthly" or "Weekly" just go to the next row. If the frequency in column C is "Annual", add 183 days to the date in column B; if it is "Semi-Annual", add 92 days to date in column B; if it is "Quarterly" , add 46 days to the date in column B; if the frequency in column C is "2-Year", add 365 days to the date in column B. Once the check has been made; I need the new total or date that was calculated checked against the date the report is being run (system clock date). If the date or total days is less than today, a new worksheet, titled "Late" needs to contain that row of data. If the date or total days is greater than today's date, just go on to the next row. I've attached an example worksheet.
View 9 Replies
View Related