Autofill In Working Days To Userform TextBox
Jul 26, 2013
I am working on a "Salary Payment voucher excel Userform".
How can i do it, if i don't want manually fill in the number of working days into the textbox myself, Can i have the userform to automatically fill in the number of days when i initialize the userform.
We are working at 6 Days weeks.
View 4 Replies
ADVERTISEMENT
Jul 2, 2012
I current have code that fills in textboxes in a userform with values in cells:
Code:
Private Sub CODE_Change()
Dim ws As Worksheet
Dim fm As Worksheet
Set ws = Worksheets(ActiveSheet.Name)
Set fm = Worksheets("Form")
[Code]...
How to I modify the lines under Checkbox1.Enabled = False so that they only take a section (of varying size) of the text in a cell and put it in textboxes in a userform?
ie. The text in a cell is "Outer: A123 ; Inner: B456." I would like A123 to appear in a textbox called OuterColor and B456 to appear in textbox called InnerColor
View 4 Replies
View Related
Apr 4, 2014
I have a UserForm which enables the user to input sales figures for each month for 5 years.
At the bottom of each year is the total box.
At the moment it only sums the 12 months when each month has a figure in it. Sometimes the user only needs to enter, lets say, 4 months figures and the total box doesn't work. It also doesn't sum as data is entered i.e. it only adds them up when all 12 months TextBoxes have a number in them.
Can I literally make it as simple as it would be on a normal worksheet i.e. =SUM(A1:A12) ??
Here is my code that is 'in' each month's TextBox
[Code] .....
End Sub
The total box itself - txtY1Total - doesn't have any code in it.
View 1 Replies
View Related
Jul 31, 2014
I've got the below so far, but where it says V2>=(Q2+5) , I would like it to add 5 working days instead, is this possible?
Code:
=IF(AND(T2="Awaiting",V2>=(Q2+5)),"Overdue","Raised within 5 Days")
It would also be great if there is a way to say that if T2="Not Required, then put "Not Required" in W2 (where the IF statement is)
View 4 Replies
View Related
Apr 3, 2014
I am using excel 2013 in my laptop (windows 8.1) after having upgraded excel 2007. Everything works fine during my daily tasks. Especially autofill which I use quite often works perfect.
At the same time I upgraded my girlfriends laptop (Windows 7) with the office 2013 (office 2007 was the older version) and somewhere there begun some isues. Autofill doesn't. Especially with months or days. I enter the value "Monday", I drag down (of course using the black filled cross down right of the cell) the cursor and all the cells get the value Monday. Even if enter the value Tuesday in the second cell and then try to autofill (having marked before both these two cells) I get the same results. Monday, Tuesday, Monday, Tuesday.
I tried to test the autofill with numbers. If i write only the one number (for instance the value "1") and then autofill, this doesn't work. It gives me the value "1" in all the cells. But if I enter the value "2" in the second cell, the autofill works fine (marking these 2 cells and then autofill).
We make some online courses using exactly the same excel exercise files. In my laptop everything works perfect.
View 2 Replies
View Related
Dec 30, 2011
I want to have a range of days in a cell, for example in cell A1 will have may 2-may 9. when I use the autofill handle I want A2 cell to read may 10 - may 17 and then if I use it again A3 will read may 18- may 25 and then roll over to the next month . As it stand right now if I put in may 2 - may 9 and use the autofill handle the next cell down will read may 2 - may 10.
View 2 Replies
View Related
Jul 3, 2014
I've been using the following code to conditionally format userform textboxes based on a specific value (in this case 2490):
[Code] ........
What I'm looking to do now is amend this so rather than use a specific value, to use the value in a specific textbox on the same userform.
View 3 Replies
View Related
Feb 2, 2010
I need a userform textbox event that fires after I tab or click out of the textbox. Going by the list of options:Beforedragover, BeforeDroporPaste, Change, DblClick, DropButtonClick, Error, Keydown, Keypress, keyup, mousedown, mousemove, mouseup.
I can't figure out which one will do what I want. The change event happens instantaneously which doesn't work. I need to fire off the event when my focus leaves the textbox.
View 11 Replies
View Related
Jul 25, 2014
I need the value of active x control textbox on my worksheet 1, to be copied to a textbox in my userform, that pops up from that sheet....
And I want it to display after the textbox on my worksheet has been updated and the comman button for the userform is clicked...
View 1 Replies
View Related
Oct 12, 2011
Code:
Private Sub cmdSearchButton_Click()
Dim txtbox As String 'stores lookup value
Dim x As Variant 'value for wwid txt box
Dim ForeName As String
Dim SurName As String
Dim wwid As Variant
Dim iPosition As Integer
[Code] .......
Here is my code, it does a vlookup and if the persons name is not found it will split the text entered into forename and surname but when i try and add
Code:
frmAdd.txtForename.Text = "&ForeName &"
frmAdd.txtSurname.Text = "&SureName &"
It actually displays &ForeName & in the text box of the next from rather than what ForeName is..
eg. John Smith -> search button -> user not found msg -> user wants to add user -> string is split into forename and surname -> forename = John , surname = Smith -> display this in the second form.
What code should i be using to do this, i thought that &ForeName & would work.
View 1 Replies
View Related
Jul 27, 2014
I tried looking for everywhere, but i still cant seem to find the solution.. I have an Active X textbox on a worksheet, and I need it's value to show up on a textbox on my userform, that shows up through a command button on that worksheet. I'm fairly new to vba.
View 1 Replies
View Related
Jun 6, 2014
In A column the date something is received will be entered.
In B column there is a drop down list that has "insured" "Fee" "Aged Debt" "Other".
In C column I am trying to get another date to populate dependant on what is picked from column B, so if Insured is picked then 1 working day needs to be added to the date in column A and populate in column C. If any of the other 3 options are selected 5 working days needs to be added to the date in column A and populated in column C.
I have been using this formula: =IF(B2="","",IF(B2="Insured",A2+1,A2+5)) however this is not working days and I am stuck how to get to add working days
View 4 Replies
View Related
Jan 28, 2009
I have a table with 2 date columns, and I need to subtract one date from another to give me the number of days the job has taken, but this also needs to exclude the weekends. There is no hours involved.
I.e.
Start Date Finish Date Days Taken
22/Jan/2009 27/Jan/2009 4
Is there a formula that i can use to work out the days taken.
there is multiple rows of information, the above is an example.
View 7 Replies
View Related
May 13, 2014
1. Find the working days between 15th Nov 09 to 28th
2. Add a column that shows the date after a number of months from today date. The number of months from todays date for each of the country is mentioned in column No. of Months after which revised.
3. Find the date our training will end using excel considering the fact that SAT and SUN are holidays. (Use the date when your training started)
View 2 Replies
View Related
Jul 1, 2010
I receive an extract from our Financial System monthly which list all the balances for each date of the month (both workings day and week-end(Sat. and Sun.)).
I would like to create a macro which will extract only working date (Mon.- Fri) and the balances in the columns.
View 6 Replies
View Related
Oct 10, 2007
I'm currently working on a file that has employee holidays/sickness etc. What I want to do is be able to see is a DATE FROM and DATE TO and next to it the total amount of working days between and including those dates. On top of the since employee's sometimes like to take half days I need it so that it can determine half days as well.
So for example I have an employee going to be off work from 29/10/2007 until 09/11/2007 12pm which is 10.5 days in total, but that includes weekends when I don't want it to.
Also it comes out as 11 days at the moment because I can't figure out how to get it to determine is it is half a day.
What formula should I use or if someone could create an example that would be really usefull :D
View 12 Replies
View Related
Nov 26, 2013
Create a formula to count number of days an employee work (in 25 working days and 5 Friday as rest day month):
Example:
If employee works 25 days during weekdays he will get counted as = 30 days
If employee works only 22 days during weekdays with 3 absences during weekdays he will get counted as = 27 days.
If employee works from 1st to 24th and 25th to 30th absence he will get counted as = 24 days.
Other examples and output desired I attached here: Sample.xlsx
View 4 Replies
View Related
Dec 17, 2008
I have a worksheet where in column B I have a vendor name, column E I have a date value and in column AF I need to calculate a due date based on 7 working days for vendor A and 14 days (not working days) for vendor B. I've tried to write an IF statement but can't do it. Can anyone suggest the right combination of IF/AND statements that would do this? I attach the workbook should my useless attempt at explaining my problem be unclear...
View 3 Replies
View Related
Aug 15, 2010
how can i calcaulate working hours between two days.
Working Hours 07:30 - 14:30
e.g. mm/dd/yyyy
start time 01/04/2010 17:34:58
stop time 01/05/2010 08:23:35
View 9 Replies
View Related
Feb 16, 2014
How to find five consecutive working days for the staffs who worked only in night shift basis and if this comes true then to find other night shift for particular staff based on Bank ID and putting those data's in new excel sheet believe this can done through a macro.
Its new assignment to me to find the staffs to make the inconvenience allowance for the staffs who worked in night shift for five consecutive days and if they worked for five consecutive days then they eligible for other night shift days they have worked.
Given the data how it looks in our attendance. In the below data night shift criteria true stands for staffs who worked in night shift and false stands for staffs who worked in day shift.
Serial No
Bank ID
Name
Date
Attendance Type
Start Time
End Time
NIGHT SHIFT
1
1374058
A
17-Jan-14
Login
10:00 AM
7:30 AM
FALSE
[Code] ........
View 1 Replies
View Related
Aug 28, 2008
I have just built a spreadsheet to calculate training hours amongst other things. I have used the function NETWORKDAYS which calculates the number of working days between two dates. This works fine on my laptop which has the analysis tools pack installed. Unfortunately my work place IS policy wont allow the analysis pack to be installed so need to find away around this. Does anyone know a formula that will perform the same function as the NETWORKDAYS. THis is crucial to the accurate calculation of training hours.
View 9 Replies
View Related
Dec 27, 2008
to calculate no.s of workdays between two given dates,
1.We work 06 days a week (so only Sunday is OFF)
2.What if I have some holiday between the given dates + Sunday OFF
View 9 Replies
View Related
Apr 18, 2007
I need to work out the number of working days between 2 dates, where the working week is Monday to Thursday, ignoring all bank holidays etc.
View 2 Replies
View Related
Apr 2, 2012
I need to figure out a way to calculate days between textboxes and have the added total show in a text box.
Ie.
If there is a start and end date in scenario 1, the total will show in the total days text box.
If there is a start and end date in scenario 1 and 2, the total will show in the total days text box.
so on and so forth. Is there way to do this?
Total days
Scenario 1
Start Date
End Date
[Code]....
View 1 Replies
View Related
May 23, 2008
I am trying to copy data from a Textbox in a Userform to a Textbox in another Userform. Is it possible?
In Userform1 I have a button from which I can open Userform2 keeping the Userform1 opened. When closing Userform2 I want to copy the data from TextBox2 in Userform2 to TextBox1 in Userform1.
I was trying to guess the code... but it is not working...:
UserForms("Userform1").TextBox1.Value = UserForms("Userform2").TextBox2.Value
View 3 Replies
View Related
Apr 8, 2013
I am using Excel 2010. The template only has 5 working days in it, but I need to set 6 working days (Saturday is also working day). Wondering, how to get this working without spoiling the functions. Also the date format is in US , need to change to UK without disrupting the Formula/Functions.
View 12 Replies
View Related
Jan 7, 2009
I am trying to do a conditional formatting for the number of working days. What I am trying to do is:
Example:
As in the row D7 I give the actual workdays required to finish the task the Gantt Chart gets a specific formatting on the right appears for the number of working days.
Problem:
I want to avoid the formatting if there are any weekend (Saturday or sunday)
Suppose I give number of working days as 20 then there would be 6 weekend days so it shall add to the overall actual working days but again sinnce we are adding 6 additional days one more weekend day would come in between so the formatting shall take care of this.
View 5 Replies
View Related
Jan 6, 2010
I am trying to use the NETWORKDAYS function in excel to calculate the working days for my company. the problem is I m located in UAE and here Saturdays and Fridays are official days off for my company. Now the problem is that the excel have this built in function that Sunday and Saturdays are weekend days. I want to customize the function for my local days off for my company.
View 14 Replies
View Related
Jan 1, 2009
I'm using Excel 2003, and successfully working out start date (T2 in the formula below) plus duration in days (U2) minus any non-working days listed in a seperate worksheet. =WORKDAY(T2,U2,Holidays!C6:C17)
Each 'task' is on a seperate row, and the lead officer is named in Column E. How can I get the work day function to include the non-working days for each officer as well as the global non-working days in the seperate worksheet? I thought about using a vlookup, but that only matches the first non-working day for each officer rather than all of the non-working days.
View 2 Replies
View Related
Apr 15, 2009
I have a spreadsheet stating a date that my company will deliver a product by but due to a set of certain circumstances we need to pull forward the dates by 3 or 5 working days. Basically it needs to show the dates below but minus 3 days unless this includes non-working days (i.e. weekends)
01/01/10
02/01/10
03/01/10
04/01/10
05/01/10
06/01/10
07/01/10
08/01/10
09/01/10
10/01/10
View 3 Replies
View Related