I'm attempting to make a simple time sheet for a handful of employees. I'd like to enter the clock in time and clock out time for each day. The end cell should be the running total for the week. The tricky part for me is having the formula subtract an hour for each day that is over 5 hours.
This is probably a very simple problem that has me going around in circles. I am attempting to set up a time roster, where I simply want to check:
If "end-time" minus "start-time" is greater than 4:00 (hrs), then deduct 00:30 (minutes) and place that result in another cell.
If it is not greater than 4:00 (hrs) then leave unchanged. I have read thru countless examples on the Forum - but I think that such great learning is driving me mad. Although I do believe that I have the correct format [h].mm - but attempts with IF's have got me confused. This is one of those "Looking down the tunnel towards the flickering light" moments.
I require a formula that will break down daily hours worked into rate categories eg Normal Time, Time & Half, Double Time.
eg. Column E = Total time worked Column F = Normal time Column G = Time & Half Column H = Double Time
What I would like to do is enter hours into Column A and a formula in Column B will split of hours to a maximum amount of 7.6hrs then the remainder of the hours be placed in Column C to a maximum of 2 hours and Column D, no maximum.
These are the formula I am currently using
column B =MIN(E2*1,7.6) column C =MAX(MIN(E2-7.6,2),0) column D =MAX(E2-9.6,0)
I would now like to be able to split the hours over 3 rows x 3 columns
I have a timesheet where user updates start and end time for various tasks.
I have placed a time capture button in the excel sheet (which is simply a macro saying =now() function)
The user clicks it before starting and after finishing the task. The start and end times are captured in adjacent cells.
If the user starts the work, and goes on a lunch break say for 20 min, comes back finishes the task and captures end time, the time difference will not consider break time which is non productive.
How can I incorporate something like 'pause' option so that before he goes for lunch he can temporarily pause the time.
Lunch is not paid. Holiday and vacation hours get calculated at the regular pay rate. Overtime is anything in excess of 8 hours per day and/or in excess of 40 hours per week and/or over 5 working days per week. Saturdays for most the employees will be overtime because it will be their 6th workday of the week; but it will be regular time for one employee as it will only be his 5th workday of the week.
For accounting and payroll purposes, we need the totals to display in both hour and decimal format.
So far, I have Lunch, Regular and Overtime hours figured out, but I still need to work with Saturday, Vacation and Holiday hours. Also, currently, the time in and out has to be typed in with the colon and AM or PM. Is there another way to input the info without having to type in those items? I'm trying to make it as user friendly as possible.
I have this spreadsheet and in it the time is changed from military time to regular and then I use a formula to calculate hours worked. On some of these the total is off by one minute. Does anyone know how to fix this?
I don't know how to paste the spreadsheet so you can see formulas,
I need to develop a work sheet for agency booked people to count the number of hours worked by them on daily basis. Agency can clock in at three different times and clock out at 6 different times. i tried but could not even develop logic to calculate the total earned hours. i attached the sheet for reference.
Is there a way to conver a persons time spent (given in weeks) to adjust/convert to show per month. Attached is the sheet. Do note that week 2/25 - 3/1 is a combination of Jan and Feb so hours should be logically divided into jan and feb...
Name 2/18 - 2/22 2/25 - 3/1 3/4 - 3/8 3/11 - 3/15 Feb mar Tom 40 10 0 20 ?? ?? name 2/18-2/22 2/25 - 3/1 3/4 - 3/8 3/11-3/15 Feb Mar
i m trying to work out the productivity of employees based on how many hours they work (Time in Back Office). How many pieces of work they complete(Back Office items Completed) if 1 piece of work should take 7 mins. the item in red is what i cant seem to figure out.
to calculate how long a ticket is open in our system before being resolved. I don't want to count weekends, and if the ticket is 'suspended', I don't want to count that either. There is also the factor that the ticket 'un-suspend' date may be later than the ticket 'closed' date. Which is the bit that's throwing me.
So, I have the following fields
Ticket Open, Ticket Closed, Ticket Suspended Date, Ticket Unsuspended Date
A sample ticket might be (using above fields)
02/11/09 09/11/09 04/11/09 30/11/09
That 'should' equal two days (16 hours) as the Unsuspend date falls after the close date so it was suspended from the 4th until closure.
Now I want to know, in hours (8 hour day) how long that ticket took to resolve (i.e close), remembering you can't count the time it was suspended, or any time that fell over a weekend. Also not all tickets are suspended.
i am trying to make an excel spreadsheet so i can keep track of my hours and pay at work... i know how to do mult and add but i wanted to know how to do the 2 together.... for example
Hours ST OT Total Hrs Gross Pay
8 2 10 ?
i would like help figuring out the gross pay if say for example my st time rated is 21.21 an hr, and the ot rate is 31.82 how can i get the 8 times 21.21 = 169.68 and the OT 2hrs times 63.64 to show up in the gross pay as a total of 233.32 - what would the formula look like?
I got a problem with a time calculation, if it's even possible.
I want to calculate the amount of hours that have been woork in a slot.
Example: First slot is from 08:00am till 17:00pm, time cost 100% Second slot is from 1700am till 24:00, time cost 110% Third slot is from 24:00 till 08:00 am, time cost 120%
I'm working from 08:00am till next day 01:00am So my hours are: 9 in slot 1, 7 in slot 2, 1 in slot 3.
i have a timesheet that we are trying to use. the problem is the column that says shift diff. if an employee works after 6:30pm for 1and 1/2hr, he is entitled to shift hours. shift hours is between 6m and 8am.
As long as he works after 6.30pm but works for at least one and a half hour, he will get the shift.
if work, 9am to 7:30pm, and have break between 2-3pm, should have 1.5hrs shift and 9.5hrs total if work, 7:45pm-9:45pm, and have break between 8:30-9pm, total hrs work is 1.5 and shift hrs s/b 1.5hrs if work 3pm to 12am and have break between 7-8pm, total hrs work is 8 and shift hrs s/b 5hrs
Any way to calculate the total hours staff work based on the mininum time of the first transaction to the maximum time of the transactions. I used a DMIN and DMAX function to get those times per employee. The issue is then the time goes over from one day to the next, such as from 11 PM to 4 AM the next day. As you can see in the data below,the fourth record shows the minimum time as 12 AM and the max as 11 PM with total time worked as 23 hours. In this example, the total hours worked should be five hours.
It's been several years sine I had to look at calculating amount of time worked. Can you please look at this old spreadsheet of mine and verify that the formula is correct?
It appears to be ok to me, but I don't want any errors when it comes to paying my employees
I need a formula to calculate hours worked between specific times. In the worksheet I have, I need to calculate the hours worked between 5am and 10pm, the start time is in C7, and the finish time in D7 the formula need to be in H7, and another formula in I7 to calculate hours worked before 5am and after 10pm .
I have been working on a timesheet but the problem I have come across is calculating actual hours worked only in the core hours and any work outside the core hours is calculated in the outside hours column. A standard work day is 7.6 hours working between 8.30am and 5.00pm. However if someone was to commence work either before 6am or after 8pm this is outside of core hours. I have attached an example of my timesheet for you to see what I am talking about.
The code below basically adds addresses to both the page and the oracle backend. However I am trying to work out how to limit the number of addresses they can add to 100. Therefore is it possible via code to calculate If Me.finish.Value minus Me.start.Value is greater than 100 then stop the code?
Timekeeper to tally total hours worked by employee. When doing a pivot for sum total hours worked for FY13 it does not calculate correctly. I understand they formatted that column/custom h:mm but when I change the 8:00 hours to a number I come up with 0.33 .
I am attaching a sample file : sample time.xlsx
I just want them to get a running total of hours worked/pay.
I'm trying to make a way to track if I've worked more or less than the 39 hours/week I'm paid for. At the end of each week, I have a total of how many hours and minutes that I've worked .
On column C I have what I should work.
On column D I have what I did actually work
On column E I'd like to convert automatically Columd D to minutes for calculation purposes
Column F to know if I worked more or less than what I should've subtracting C and E
Column G to have an ongoing tally to know if I need to work more or less
Column H and I could probably be the same thing. Ideally what I'd like is to have a formula pull the information from column G and put it into workdays, hours, and minutes with 1 workday being 7 hours and 48 minutes.
Since I tend to work too much, I'd like to know if I've worked 3 days too much during 1 month, I can take 3 days off the next month to get everything zeroed back to where I don't owe the company anything and vice versa.
I am trying to create a spreadsheet that auto calculates my emp. time.
However I do not want to use military time. I can get it to work by =a2-a1 but only if it is 8.5 and 17.5. Any ideas how I can do clock in 8:30 clock out 4:30 = 8 hours?
I'm trying to calculate the total hours worked for two given periods over a shift , which can span two consecutive days ie. start 15:45 and finish at 00:15 the next day. Hours worked between 6am and 6pm are paid at standard rate, whilst hours worked between 6pm and 6am attract penalty rates. Hours are cacluated in 24hr time
I have attached a copy of the timesheet that we use so you can see exactly what I'm trying to achieve, and included most of the shifts that we have.
I can do the timesheet formula for adding the hours worked as follows:
Start Finish Total 08:45 17:15 8.5
However, it doesn't work when I fill in a whole week work of hours in this format:
Start Finish Total 08:45 17:15 08:30
It works on a daily basis, but when total hours exceeds 24, the formula get's all mixed up - how to I format the total column to account for every 5 minutes worked, which you can't do when converting to decimal??
This spreadsheet calculates hours worked great for first and second shift but when you enter times for third shift it goes all whacky with the outcome.
I am creating a spreadsheet that will track hours of overtime worked and within the spreadsheet there are several separate departments listed.
I have made it dynamic so that the summary spreadsheet will update as employees are added. I’m using a macro and some complicated helper cells to be able to sort the employees based on their total OT hours worked.
Refer to the attached sheet which is Daily Schedule for employee. I need a formula to add hours worked on single day in cell C2 for Monday, E2 for Tuesday, G2 for Wednesday, and so on.
Every day we have Clockin_Clockout info for each employee as shown for employee a & b.
FYI : I am using below formula to add employee hours for the week as (formula in cell R4).