what i trying to learn is that im trying to get the delivery price calculate base on the delivery area(F10) and the total qty of the items(G10).
but i've tried with Vlookup, IF, lookup, Hlookup function and i still cant manage to get the right one to put the data in the H10
View 4 Replies
ADVERTISEMENT
Dec 13, 2013
I want to create an Excel sheet that calculates the charges of a freight based on predefined parameters.
I got 3 service types as shown below, two freight types and 12 different destinations both NT and SA have 6 different destinations:
I want Excel to do the following:
If Road and Carton and to NT-Country and weight is 7 then 7*1.000089 is the result
1 to 15
>15
Service
Type
NT
METRO
0.337284
0.337284
[Code] .......
View 7 Replies
View Related
May 25, 2009
I want to calculate the number of times Lampard has taken and Inswing delivery, and how many times an attempt at goal ocurs from these deliveries.
The equation i'm using is =sum(if(a1:a100="Lampard",if(a3:a100="inswing",1,0)))
However, this is not calculating the correct number, and instead just equating 1.
View 9 Replies
View Related
Dec 27, 2012
I am trying to calculate a new base pay rate, but I need it make sure it is at least brought up the new minimum and capped at the new max of the range where applicable. The increase is based on 10%
So here are the columns used:
L = Current Base Pay
Q = New Min of the range
S = New Max of the range
U = where I want to calculate a 10% increase of L, but ensuring it is brought up to at least the min (Q) or not over Max (S). In other words if my min is $12 and Max $18 and my new base pay is $16 -- then I am good. However it if is $11.50 I need the formula to return at least $12. And visa versa -- if the new rate would be $18.50, I need it to return no more than $18.
View 3 Replies
View Related
Feb 4, 2014
I have a base rate in A1, the the units in B1 and need a total in C1.
In A3 i have discount rate (%) for units between 0 and 9
In B3 the have the discount rate (%) for units from 9 to 15
In C3 the have the discount rate (%) for units from 9 to 15
In D3 the have the discount rate (%) for units above 16.
How would the formula looklike?
View 3 Replies
View Related
Dec 7, 2006
I need to read consantly changing shift time/ covered data from a Pivot Tables pivot chart and populate this data into number of shifts covered/ uncovered. This information is then put into a chart over a 24 hour period (from 0700 to 0700). I have been populating the data from the pivot chart by hand by referencing the number of shifts in the covered line and dragging it to correspond to the shift time data part. I then have to do this for the uncovered shifts. As the data in the pivot chart is constantly changing, i need to do this data ransfer 'automatically'. I have started to look at and learn VBA, but i am getting nowhere fast. I enclose a worksheet (blank) to give you an idea fo what i am trying to do.
View 4 Replies
View Related
Mar 2, 2007
I have coins in the following denominations: 10 cents and 20 cents
IF my parking charge is 30 cents, I can pay the charge using:
a: 10 + 10 + 10 cents
b: 10 + 20 cents
c: 20 + 10 cents
= 3 combinations (a, b, c)
= 2 unique (a, b) or (a, c)
If my parking charge is 80 cents
What is the formula to use to find:
(i) The combinations (answer should be 34(?) posible combinations)
(ii) The unique combinations
whilst if the parking charge was 50 cents
Than there would be 8 possible combinations (as the answer to the formula!)
View 9 Replies
View Related
Jun 20, 2014
Never tried complicated formulas in Access and at a bit of a loss... What I am trying to do is calculate a utility bill based on stepped rated.
For example:
Usage up to the first 500KHW is billed at .067 per KWH
Usage after the first 500KWH from 501 to 999 is billed at .044 per KWH
Usage from 1000 up is billed at .0318
So if my usage was 1200 KWH...
((500 x .067)+(500 x .044)+(200 x .0318)) = 61.86
I was assuming it would require an complex "if" function to split the 1200 into steps and then calculate charges per step?
View 9 Replies
View Related
Jul 10, 2009
I am trying to import a BASE ESTIMATE table into EXCEL.
I have problems with most of the formulas, especially this one:
=VLOOKUP($E$2,$B$24:$P$604,HLOOKUP($E$3,$D$22:$L$604,1)+2)*HLOOKUP(HLOOKUP($E$3,$D$22:$L$604,1),$D$2 2:$L$23,2)
and this one
=ROUND((IF(AND(OR(E7>E5,E7>E6),E3<40000),E7,IF(AND(E6<E5,E3<40000),E6,E5)))*E8*1.055*1.06,2)+10
I am not sure if EXCEL allows a HLOOKUP within an HLOOKUP. If not, how can I get around this?
View 14 Replies
View Related
Jun 26, 2014
run a spreadsheet for Vendor Deliveries and got as far as promised delivery date and actual delivery date with a late or on time comment. Im trying to get a percentage from this data.the excel spreadsheet that i have uploaded.Delivery Schedule.xls
View 5 Replies
View Related
Mar 18, 2009
I am trying to get an average of delivery times.
On Monday's I have time's of:
View 6 Replies
View Related
Feb 20, 2014
I am about to apply for an entry-level job as a scheduler for a company that ships olive oil. But before I decide to actually do this I'd like to see what I'm getting myself into.
It is how Microsoft Excel is used to schedule shipments, monitor inbound shipments and keep track of inventory.
View 1 Replies
View Related
Apr 10, 2012
I am trying to project the delivery dates of my shipments which is sent via courier to different destinations from my Distribution Centre.
The courier company delivers the parcels across Monday to Saturday(Sunday being the off day for the courier). There are different transit days for different locations which works in deriving the project dates from the shipping date. I am looking for a formula which can satisfy all the following conditions and project the delivery dates accordingly:-
Condition1:-If the projected delivery date falls on Sunday and there is no holiday on the very next day(Monday) then the projected delivery dates needs to be on Monday.
Condition2:- If the projected delivery date falls on Sunday and the very next Monday is a Holiday then the projected delivery dates needs to be on Tuesday.
Condition3:- If the projected delivery date is a Holiday and the holiday falls on any day between Monday to Friday then the delivery date will be the next working day post the holiday(between Mon-Sat).
Condition4:-If the projected delivery date is a Holiday and the holiday falls on Saturday then the delivery date will be next Monday.
Condition5A/5B/5C:-In case there are more than one holidays at a stretch(2/3 days of holidays at stretch) and if the projected delivery dates falls within the holidays then the projected delivery dates needs to be on the next working day(Between Monday to Saturday).
I have tried to write a formula but it is only satisfying the Condition1,Condition2 & Condition3. I am providing a sample data with desired results based on the above conditions. Any single formula which can derive the desired results.
Sheet1 ABCDEFGH1Destination LocationDispatch DateTransit DaysProjected
Delivery Dates(Desired Result)Remarks Courier Company Holiday List2A29-Mar32-Apr
Condition1:-Projected Delivery Date As Per Transit-Days Is Sunday(1st Apr) & There Is No Holiday On Next Monday(2nd Apr) & Hence REVISED Projected Delivery Date Needs To Be On 2nd Apr(Mon).
[Code] ....
View 3 Replies
View Related
Oct 27, 2009
I have 3 different costs for an item, 15 different items. The costs very depending on the delivery state. Is it possible to write a formula that will retrun the right cost for an item, depending on the delivery state?
if ap10 = "CA" then look up in range AH2 to AH18
if ap10 = "GA" then look up in range AI2 to AI18
if ap10 = "ME" then look up in range AI2 to AI18
if ap10 = "PR" then look up in range AI2 to AI18
if ap10 = any other state then look up in range AG2 to AG18
cell AP10 being the cell that the state is listed in
Cell U10 being the cell that item is in (a drop down menu)
This is the vlookup formula that will get one price.
=IF(ISNA(VLOOKUP($U10,TABLE!$AF$2:TABLE!$AI$18,2,FALSE)),"",VLOOKUP($U10,TABLE!$AF$2:TABLE!$AI$18,2, FALSE))
View 5 Replies
View Related
Feb 12, 2013
I want formula which can automatically populate the amount based on the number of months starting from the date vehicle is received. For Eg.
Nissan patrol Rent is AED 5800/- per month & we deliver it on month Sept 2011 for 24 months then i want excel to automatically populate AED 5800/- for next 24 months starting from Sept 2011.
View 5 Replies
View Related
Mar 23, 2013
I am trying to build a sheet to track deliveries into the company I work for.
We book loads to come in at set times for production, I am wanting a sheet which I can enter the due time and the actual time of the the different companies and then produce a report in graph format to see which are the worst at late or early deliveries.
View 2 Replies
View Related
Mar 3, 2014
We have a weekly "On-Time" report that shows early, late, on time, or no data. Each week has a total percentage of early, late, on time, or no data deliveries. I now need a monthly total on a seperate worksheet, but for some reason I can not get the percentages to total correctly. I am attaching the spreadsheet.
View 3 Replies
View Related
May 29, 2008
I am trying to automate something I've been doing manually. Let me explain.
1.) I am givien information about fees associated with a mutual fund product. A sample is reproduced in F4:F8.
2.) Next, this information is entered into the table. See A4:D12.
3.) Finally, from this table, I must calculate the fees associated with various account sizes.
4.) I did this manually in cells G15:G16 for 2 different account sizes.
View 14 Replies
View Related
Mar 4, 2009
Is there way to calculate the Standard Error within the Pivot Table using SE= StdDev/SQRT(n)? I've been doing it along side the pivot results, but it is really cumbersome.
View 1 Replies
View Related
Feb 14, 2014
I created a pivot table, but having a bit of difficulty. Here is what it tells me to do....
"...pivot tablet that calculates the number and average salaries by position."
I had no problem included in the table the average salaries by position, however I can't figure out how to calculate the number as well. It's apparently supposed to be another column since the instructions tell me to change the label above 'count' to 'number'.
View 2 Replies
View Related
Feb 23, 2009
I have attached a simple test file. The data tab has two columns in the pivot range. The third column is _not_ in the pivot range, but is there to show the result I'm trying to get with the pivot.
The idea is to count the number of people whose entry dates are greater than 2/1/2009. My third data column gives a correct result, but a similar formula in the calculated field of the pivot table gives a completely wrong result (a date), where my goal is to generate a zero, a one, or a sum of zeros and ones.
It could be a formatting issue, but that would not explain why all the pivot results have the _same_ wrong answer.
I'm new to PTs and calculated fields, and expect I've made a naive mistake that an expert could easily spot.
View 3 Replies
View Related
Jul 6, 2012
I have a pivot table in which 50 rows data and each row contains in the end %age. End of report i get grand total but it sums the percentage column. I need to calculate percentage in the end of grand total. How can i get it.
View 3 Replies
View Related
Sep 9, 2006
looking for a way to run some pivot tables on a large data table. Would like the result to show some different data extraction from the same field / column. The table is customer survey results for my employees, and the fields in question can have values from 1-5. I would like to finish the pivot table with all of these fields:
Row: Name (ok, that part is easy)
Data fields:
% of entries (column 2) that are 5
% of entries (column 2) that are 4 or 5
% of entries (column 2) that are 1 or 2
# of entries (column 2)
% of entries (column 3) that are 5
% of entries (column 3) that are 4 or 5
% of entries (column 3) that are 1 or 2
# of entries (column 3)
I'm hoping this is something I can do with calculated fields, but haven't been able to figure it out. So far all I have is a 'Count' function in the pivot wizard for the # of entries, but I'm not getting the % of entries at all. Column A = Name, Column B = 1st metric, Column C = 2nd metric. Fairly simple layout, but I have a small sample file I can attach if that's not explanatory enough.
View 7 Replies
View Related
Dec 20, 2007
With Pivot Tables, there is the ability to add Grand Totals to Rows or Columns, but I want to add Averages to the end of the row instead. Can this be done? I have tried Calculated Fields but can't get the right result. Auto Merged Post;Hi again,
After I posted this I found another similar post, where the answer was that the "Average" calculation has to be done outside the pivot table, ie. there seems to be no way the pivot will give averages for rows, only grand totals.
If this is the case then I will have to work around it.... I was hoping it could be done within the pivot because I have graphs linking to the pivot and they all go spak when I update the pivot with different data. The number of columns will change all the time, meaning the average will need to be reworked. Just trying to save time!
View 8 Replies
View Related
Sep 18, 2008
I have a worksheet that has a sent date and expected delivery date I need create a macro that will alert me if today's date is within 5 days of expected delivery date.
View 14 Replies
View Related
Aug 14, 2014
So I am running in to a large brick wall! I have a single pivot tablet with a column for items received and then a column for items shipped. I would like to create a calculated field in the pivot table that will subtract the items received from the items shipped columns. I have attempted to add the calculated field using the tool bar but it keeps giving me "0" for every item on the pivot table when there are obvious differences.
View 1 Replies
View Related
Aug 7, 2013
I have a data table with incidents in which one column is equipment number and one is data of occurrence. I now need to calculate how long ago the same equipment number occurred.
View 2 Replies
View Related
Apr 16, 2007
i am working on a redundancy table to calculate lenght of service at a certain age and what the redundancy in years will be,
age----------------years
less than 23------0.75 per year
23 to 42----------1.5 per year
43 and above----2.25 per year
these figures only count for the years they have been that age
examples
a person who is 22 and worked for two years would get 1.5 years redundancy, 2 x 0.75
a person who is 23 and worked for two years would get 2.25 redundancy 1 x .75 + 1 x 1.5
i can do this table manually adding on to each previous but wondered if someone might have a nice formula that would calculate it automatically
i would imagine there would have to be some kind of lookup to find out how many years they have been in each age bracket
View 9 Replies
View Related
Aug 26, 2009
Is a way to calculate the difference between two columns in a Pivot table .
I have the data something like this in a pivot table....
Sum of MetricValueColumn LabelsRow LabelsFebruaryMarchAprilMayJuneJulyNet New My SitesNet New Team Sites0Number of Provisioned Users322059319906322372350239332914328404Total Capacity In Use (GB)1585.381722.761824.731947.772124.282262.78Total No. of My Sites208212316924682307313313134317Total No. of Team Sites101751082311396683273227940
What i need to do is to calculate the "Net New My Sites" and "Net New Team Sites" values something like this....
Net New My Sites (March) = Total No. of My Sites(March) - Total No. of My Sites(February)
Net New My Sites (April) = Total No. of My Sites(April) - Total No. of My Sites(March)
View 9 Replies
View Related
Feb 3, 2014
I have been using Excel to display, sort and present data in a professional way. I have created a pivot table with two columns below. Column C indicates the start date. Column D indicates the completion date. Blank cells show live data. I need to determine the number of days. 1) That have been - completed - a) That were < 2 Days, b) >2 but less than a week, c) > than a week (all). I have used the following formulas. a) countif(D4:D61, "<3"), b) countifs(D4:D61, ">2", D4:D61, "<=8"). Easy for completed data. My problem is, how do I determine the number of days, live data that following the same queries as above. I have figured out I can use countif to count the number of blanks by - countif(D4:D61, "(blank)") but how to put it all together and what formula should I use. I am trying to use countifs or if statements but am totally lost.
Column C Column D
---------- ----------
06/01/2014(blank)
25/11/2013(blank)
13/12/201314/01/2014
27/12/201317/01/2014
27/12/201310/01/2014
View 2 Replies
View Related