Formula - Quarter Formula
May 8, 2007
I have data in a spreadsheet that I have to analyze by quarter and currently the users enter Q1, Q2, respectively. I would like to eliminate this field, but the analysis formulas do need to break the data down by quarter. Does anyone know of a formula that finds quarters by date?
View 9 Replies
ADVERTISEMENT
Nov 6, 2005
I'm trying to write a formula to return the AVERAGE by calendar quarter, IF
the quarter has ended.
For instance, IF Jan = 5, Feb = 20, Mar 5, Average would be 10.
But, if Mar was 0 (only meaning no activity) I still need it to calculate.
The formula I started with is -
=IF(A1=0,0,AVERAGE(A1:A3)
This works only if cells A1:A3 have a value greater than 0. How can I write
the formula so that as long as A3 is not blank that it will return the
AVERAGE?
View 11 Replies
View Related
Jun 21, 2007
Is there a formula to set the a date in Excel based off the next full calendar quarter? In cell G2 I have the contract date: 01/26/06. I would like to have a formula in I2 that displays the first day of the next full calendar quarter, which is 04/01/06
More example dates:
if my contract date is: 10/21/05
my start date is: 01/01/06
View 3 Replies
View Related
Jan 20, 2014
I am looking to create a function that outputs the upcoming quarter end date based on a specified start date, for which the quarter end is based on a broken fiscal year ending december 15.
As an example, say that you sign up as a customer with an internet provider on 2014-01-01. The internet provider charges all their clients on a quarterly basis and have a broken fiscal year ending on december 15. Hence, as you signed up on 2014-01-01 you will be charged on 2014-03-15, which is the date of the company's first quarter end.
So what I would like to do is to set up a function that outputs the first date I will be charged based on the date that I sign up. If I sign up between december 2013-12-16 and 2014-03-15, the formula should output 2014-03-15. If I sign up between 2014-03-16 and 2014-06-15, the formula should output 2014-06-15 etc. etc.
View 1 Replies
View Related
Aug 21, 2006
going down are stores a, b, c, d.... what i'm filing in across is the square feet of each store and what quartr or year each store came into place. so there will either be a 0 or a number Now, I want to be able to count the number of nhew stores each quarter. how do i create a formula that just recognizes it the first time there is a number and not a zero... because i will put the square feet in subsequent quarters after it opens so i can see yearly how many square feet the store had. then also, how can create a button on the page that will say quarterly numbers and a button that is annual. so that i can hide the quarterly columns and just see an annual spreadsheet... and for the quarterly button so i can hide the annuals and just see the quarters....
View 6 Replies
View Related
Mar 22, 2012
What I need to do is that I have electrical tools that get tested on a certain date in Column A. I need Column B to look at column A and determine and display in date format the next quarter when test is due.
Practical example: Extension cord got tested on 04/04/12. The next test needs to be conducted on 01/06/12. If the test is overdue and gets conducted on 02/06/12. The column A will change to 02/06/12 and column B should change to 01/09/12 as a result.
The formula I have got to work is
=DATE(YEAR(F2)+IF(MONTH(F2)>9,1,0),CHOOSE(MONTH(F2),4,4,4,7,7,7,10,10,10,1,1,1,),1)
but this makes the quarter dates as APRIL, JULY AND OCTOBER - they need to be MARCH, JUNE, SEPTEMBER
when I change the formula to
=DATE(YEAR(F2)+IF(MONTH(F2)>9,1,0),CHOOSE(MONTH(F2),3,3,3,6,6,6,9,9,9,1,1,1,),1)
The dates work BUT if the following test is undertaken on 01/03/12 the date in Column B does not change to 01/06/12. Why? How do I get it to work?
View 6 Replies
View Related
Oct 30, 2009
I'm trying to figure out how to identify higher earnings in a quarter and return the max of the quarter of time frame and not the value
I'm simplifying a little ...
View 9 Replies
View Related
Oct 7, 2013
How would you calculate the amount of days of a billing period for a consulting engagement by quarter when the engagement could span multiple quarters, be within a quarter or not be in a quarter at all? Project based billing
View 1 Replies
View Related
Oct 7, 2009
I was wondering if there is a formla that will delete a formula when it has done its calculation, or stop the formula from constantly updating.
I've got a formula
=IF(COUNTA(A1)=1,TODAY(),"")
When something is typed in Cell A1 the cell with the formula will input todays date.
Is there a formula that will stop this formula from updating, as when you go into the file on a different day the date would have been updated.
View 6 Replies
View Related
Jul 30, 2014
I have a situation where I have to curve fit data, this can lead to different formulas being used with varying constants.
Is it possible to pickup a TEXT based formula and related constants from other cells, and then place this into another cell as a functioning formula. For Example
Cell A1 contains the formula as a text string whether it be y=a+bx+cx^2, or y=a+b/x, etc
Cells A2:A6 contain the individual constants, a, b, c, etc
I would then want the VBA to read the text based formula and put it into an output cell as a functioning excel formulae.g
In cell B10: =a+b*A10+c*A10^2
I understand picking the constants up and putting the formula should not be too much of an issue, however trying to insert the variable form of the curve fit is the part that I am struggling with, and am unsure if possible.
View 2 Replies
View Related
Dec 22, 2009
Here is the scenario:
A B C D
BananasApplesOrangesTotal113=A1+B1+C1
I need to reference the formula in D1 with the cells headers names.
In a perfect world, it would take
=A1+B1+C1:
and produce:
=Bananas+Apples+Oranges
View 9 Replies
View Related
Mar 27, 2014
I have an existing formula in a cell linking back to a start date only. determining how to add an additional formula to exclude weekends, and possibly holidays.
View 2 Replies
View Related
Aug 24, 2014
I am trying to use a combination of Concatenate and IF formula to produce an email.
My input.
D4: First Name:
D5: Middle Name:
D6: Last Name:
D8: Organization:
Once all these are filled, I want the formula to produce a result like
FirstName.M.LastName@Organization.com
I have used the following formula.
[Code] .....
Problem is if there is a middle name the formula works fine, but in case where there is no middle name, it produces the following result.
FirstName..LastName@Organization.com
How do I remove the additional (.) in cases where there is no middle name.
Attached File : Email Generator.xlsx
View 3 Replies
View Related
Apr 23, 2009
I'm having some trouble trying to get excel to input a formula into a cell. I'm still a novice at VBA right now, so I don't think my problem will be too much of a brain buster.
I want a formula in Cell A6 (and I already know it correctly works) in this format: =E6&VLOOKUP(I6,'FA-Fund Data'!B$1:C$2000,2,FALSE)&J6
View 3 Replies
View Related
Jul 22, 2014
Is it possible to write a formula that skips x number of cells and have the formula autoincrement as usual. For an examples lets say I want to skip 3 cells and I have entered in the cells listed:
A1= "1"
A2= "2"
A3= "3"
Then I type in the simple formula in the cell
B1= "=A1"
and then drag down but it skips 3 cells so then
B5= "=A2"
B9= "=A3"
If it didn't skip then
B1= "=A1"
B2= "=A2"
B3= "=A3"
this is just an example as I will be writing more complex formulas and need some thing that I can write into the formula so that it skips.
Something similar to this B1 "=A1(skip3cells)"
View 4 Replies
View Related
Jul 16, 2007
I would like to copy a formula in a cell and then paste only the text of the formula, but I can't figure it out. Basically, I would like to avoid going into the cells and absolute referencing or hitting F2, then copying the text.
When I hit "Ctrl C" to copy the cell, then hit "Alt/E/S/F/Enter" to paste the formula, it is just like a regular copy/paste formula-wise in that the references move.
View 10 Replies
View Related
Apr 9, 2009
I have some student marks in columns B to F. If some one get below 40 marks he fails and the subject in which he has been failed will come in Remarks column. If he has passed in all subjects remarks column will show Pass.
To bring failed subject initial in Remarks i have to create 5 additional column and then thru Concatenate i joined them.
Is There any formula to show fail subject in Remarks column without creating 5 additional columns?
View 14 Replies
View Related
Aug 12, 2007
This task joins a string together based on a number of characters per cell in the range.
I want to isolate one range, Col N, and add an IF condition to it.
There may be other issues preventing this from happening, e.g. the number of IF that exist in the complete formula. I will isolate the current cell and its requirements and then post the entire formula at the end for reference....
View 9 Replies
View Related
Jan 31, 2008
I am looking to average a range of cells which won't always be the same size. How do I create a formula array that will omit empty cells in my formula.
View 9 Replies
View Related
Jun 1, 2006
I recently added a formula to a spreadsheet with som complicated formula. It worked ok and I saved the sheet. Now it takes 5 minutes to open the sheet and when I try to do anything,like delete the inserted column the program locks up giving a no responding message. I can do without this column if I have to.
View 4 Replies
View Related
Feb 23, 2008
I am using vlookup to get a cell value from another sheet, but if the cell has "&" or "/" I need to substitue "&" and "/" with "and" so that the cell can be added later to a url.
i am using =VLOOKUP(a1,Sheet2!A1:W17968,6) to get the value of a1 in sheet 2 and return the value of column 6
this will return "Audio Cables & Leads" but i need it to say Audio Cables and Leads
I need the formula to also check and replace "/" with "and" as well so cables/wire will be Cables and wire
View 9 Replies
View Related
Feb 18, 2010
Need function to calculate the end of quarter for a given date after adding any number of months to that date. Example cell A1 would contain 01/15/2010. I want to add 6 months to A1. A2 would contain 6 making it 07/15/2010, B1 would contain a function that would display 09/30/2010.
View 2 Replies
View Related
Mar 13, 2014
What I want to be able to do is,,press the Q key and either Q1, Q2, Q3 or Q4 based on certain parameters appear in that cell.
In column A of my spreadsheet heading 'Quarter', I want to be able to specify which quarter of the year a request was made,,so when I press Q
> if the date is within 01/01/14 and 31/01/14 'Q1' will appear
> if the date is within 01/04/14 and 30/06/14 'Q2' will appear etc,,I'm sure you can workout Q3 and Q4,,
Ive named a cell A1 'TODAY' for reference it has the formula =TODAY() in it and shows whatever the date,,
I have looked at the DATE commands available but I don't think any could do what I need, that's why I was thinking I needed a piece of VB code,,
View 2 Replies
View Related
Aug 19, 2014
I have data like this.
HRM2014Q1
HRM2015Q1
HRM2015Q2
HRM2015Q2
HRM2015Q3
HRM2015Q3
HRM2015Q1
HRM2015Q1
HRM2015Q2
HRM2015Q2
HRM2015Q3
HRM2015Q3
CRM2014Q1
CRM2013Q1
CRM2015Q1
CRM2015Q1
CRM2017Q1
CRM2017Q1
CRM2017Q2
CRM2017Q2
CRM2017Q3
CRM2017Q3
In another sheet I have "Project " , " Start " "End" . I need to find the start and end quarter and fill in. The output should be "
HR 2014/Q1 2015/Q3
crm 2013/Q1 2017/Q3
ATTACHING A FILE-
In sheet- raw data - i need to search on ID- and in "Test.xlsxData" i need to fill in the start and the end date- as shown in Data sheet.
View 2 Replies
View Related
Nov 28, 2008
Formula to get the Quarter number for the highest profit per Product, like in B16:F16.
The excersiser instracted us that it must be with one formula with no Macro, not User Defined Function and not openning additional colums.
I know how to find the qtr. Number - like for A2: =INT((MONTH(A2)+2)/3) but I am lost in finding how to combine the calculation for the Qtr and the most profitable Qtr. probably with MAX on SUM.
View 14 Replies
View Related
Dec 17, 2008
I have a date say 31/7/2008 and I need to return the relevant Quarter.
View 3 Replies
View Related
Sep 14, 2007
In cell A1 I have a date entered as text as "Apr 2007". (That's the way my tool pulls it. Format can be changed if it helps)
I was able to pull the Quarter and year (Q2 2007) using...
A2 ="Q" & ROUNDUP(MONTH(A1)/3,0)&" "&YEAR(A1)
I need to pull the next three quarters and their year. (Q3 2007, Q4 2007, Q1 2008)
View 9 Replies
View Related
Feb 20, 2007
I have been easily identifying the bottom quarter of data using =IF(G2="","",IF(RANK(G2,G$2:G$100,1)<=INT( COUNTA(G$2:G$100)/4),"Yes","")) Now I need the top quarter and am not sure how to change the formula.
I have tried changing <= to >= but I then get the top 75% rather than 25%.
I have tried adding +50% and +.5 ... =IF(G2="","",IF(RANK(G2,G$2:G$100,1)<=INT((COUNTA(G$2:G$100)/4+50%)),"Yes",""))
View 3 Replies
View Related
Dec 19, 2012
I have a spreadsheet that contains a list of dates: What I need is a formula that will count the number of cells that hava a date more than 6 months old. I also would like the field automated so I don't have to change the date manually every day.
=COUNTIF(S5:S593,"<2012/06/18") This formula will give the correct read out, but I must change the date manually.
My attempts at adding a =today() command in place of the date result in 0 being the result (not correct)
This is what I have tried: =COUNTIF(S5:S593,"<"=TODAY()-"183")
View 8 Replies
View Related
Apr 3, 2014
In my attached spreadsheet example below, in the Rollup Data sheet, I have a formula (Cell: C17) that will give me the actual cost totals that has been invoiced on WBS Element (DWRRI-BW096-231) for a total of $35,004.81.
What I need the formula do is run a redundant check procedure on my new WBS Element (DWRRI-BW096-231) actual cost total formula in the Rollup Data sheet (Cell: C17) against/vs. what the SAP system provides in the raw SAP Excel export contained in the PTD-Actual Cost sheet for the WBS Element (DWRRI-BW096-231) actual cost total of $35,004.81 (Cell: F9) that's highlighted in the yellow row.
In the Rollup Data sheet (Cell: C18), I need this formula to perform a similar function the as the previous formula above it (Cell: C17), but it this formulas function (Cell: C18) would have a separate operation that would only look for and return the single/sole WBS Element (DWRRI-BW096-231) actual cost total contained in the PTD-Actual Cost sheet (Cell: F9).
In the Rollup Data sheet I could then compare my two WBS Element (DWRRI-BW096-231) actual costs totals, the first from the automated addition of all the individual matching WBS Element actual costs into an actual cost total (Cell: C17), the second (new formula I'm requesting) from the matching and return function of the single/sole WBS Element actual cost total (Cell: C18).
So, if the two separate WBS Element actual cost totals (Cells: C17 vs. C18) both equal $35,004.81, the formula in C17 is a success and has correctly identified and added all the actual costs contained in the PTD-Actual Cost sheet, but if the two separate WBS Element actual cost totals (Cells: C17 vs. C18) both do not equal $35,004.81, the formula in C17 failed for some reason and has not correctly identified and added all the required actual costs contained in the PTD-Actual Cost sheet.
How to Add Total $ Value Formula into an Existing SUMIFS Formula.xlsx
View 2 Replies
View Related