I have a code that I have put in the ThisWorkbook section, and I thought it should work - but nothing happens....
Code:
Sub FirstSub()
Application.OnTime TimeValue(Sheets("SetUp").Range("G1").Text), "SecondSub"
ResetTime = Now() + 1
Application.OnTime ResetTime, "FirstSub"
End Sub
Sub SecondSub()
If Weekday(Now()) > 2 And Weekday(Now()) < 7 Then Call CreatePDF
End Sub
I have created a daily schedule which has a number of factory variables taken into consideration which determine the date and time a particular product should, barring any mechanical problems, come off the machine. (see attached spreadsheet).
The date at the top will be editable by me only so that when I update the production quantities, the “date/time off” column automatically re-adjusts to the remaining quantities.
The formulas are a little long winded, but I have left them that way whilst I try and develop it. I should be able to figure out how to condense them later.
My problem is that the “date/time off” on the right works excellent, but over a 24 hr period.
Ordinarily, we work a 12 hour day (6am to 6pm) with overlapping shifts to cover breaks, and 20 mins warm up at the start of the day for the machine, thus maximising a 12 hour day.
Of course if demand exceeds the allotted time we put on overtime.
Is it possible to specify that normal days are only 12 hours so that if a product exceeds 6pm, it flows into the next day with the balance starting at 6:20am?
And, if the production for the week exceeds the time could I stipulate particular days which we deem are suitable for overtime? Ie, we decide Wednesday is a 14 hour day and not 12.
I had toyed with the idea of creating a 365 day table/calendar, on another worksheet which would have its individual allocated hours in an adjacent column and somehow link them to the date/time off, perhaps by way of a VLOOKUP, but I have been chasing my tail trying to figure out how to implement it.
I work in a computer lab and we have to keep track of how many people sign in (using excel 2010), and how long they were here.
I'm looking for a way to count how many entries were made per hour for every hour someone was signed in.
For example someone signs in at 9:22 am and leaves at 3:34 pm.They were here from 9-10, 10-11, 11-12 etc.. and its getting very tiresome to go through and manually enter a "1" for each individual hour in each cell under the hour.
Is there a way I can feed the in and out times into a spreadsheet and have it automatically count how many people were in the lab each hour?
I have a time table which some hours are 3 hours time period. I want to distribute to new table hour by hour this kind of hours, or hour to same hour period.
I would like to have a spreadsheet where everyday of the month dislpays automatically
such as 01/01/08 in A1 01/02/08 in A2 etc.
According to a cell name Account Period (eg 200801)
But I don t want week end days to be displayed. In the same excel document, I have a sheet with all non working days and week end for 2008 and another sheet.
I have done a V-lookup that auto populates my project report doc with different lead times/dates depending on the product selected. Problem I have it that the dates being pulled through are for all calendar dates and not just working week days.
I know you can select a selection of dates and fill as week days however all of the dates on my primary sheet either have the project start date minus lead time formula or the vlook up formula in it. Filling week days overwrites any of this.
TWO more days to turkey day. 3 more to BF --- yaaaaak! Anyway,
Iam trying to display only 3 workdays in each of three cells. Days displayed depend on today's date.
I am usinf the following but it displays SAT and SUN.
Q3 = today's date =UPPER(TEXT(Q3+2,"DDDD")) displays THURSDAY =UPPER(TEXT(Q3+3,"DDDD")) displays FRIDAY =UPPER(TEXT(Q3+4,"DDDD")) displays SATURDAY -- would like it to display MONDAY
Q3 changes to reflect today's date therefore this would display: =UPPER(TEXT(Q3+2,"DDDD")) displays THURSDAY =UPPER(TEXT(Q3+3,"DDDD")) displays FRIDAY =UPPER(TEXT(Q3+4,"DDDD")) displays MONDAY
In other words I want to display only the week days in these 3 cells.
I have a column of dates in Col B that I need to update every day. I want a macro that will automatically fill down the date in the column, but it has to be a working day. So far I have this:
I need a formula which counts back a set number of weekdays from a given date. Eg. I am supplied with a project end date and need to schedule 25 week days prior.
I've searched a can only find formulas for the number of weekdays between 2 dates.
I have a worksheet that displays all the current months weekdays from a starting date in cell b2 using the weekday formula it works accross a row checking next day is a weekday and adding 1 but since some months have more weekdays than others the few cells that are sometimes not needed are then filled with a weekday from the next month how can I stop this? and only have the current months weekdays
I have a column where the data is listing the day of the week and time worked. What I need is to sort the column by the first four letters in cell I used the left(e5,4) to return the letters in a helper column but when I sort it still not in the Monday -Friday order. example:
I am currently assigning dates to a list manually by giving 5 dates on Mondays to Fridays. I currenly need to do this for around 500 rows and as you can imagine this takes some time.
Is there a way to have a formula that would assign for instance 5 dates on each weekday, purley by dragging the formula down?
I want to get the list of days which are only weekdays ( excluding sat, sun but includes holidays during weekdays) I have tried WORKDAY function but it is not exactly i want coz it excludes holidays during weekdays as well.
I am using office 2003 and I need to create the conditional (just like in the attached image), but I need that the days -1 (day) -2(days) or -3 (days) that are in the end of each formula, I need them to be weekdays (i don't want the to count weekends.
I would like to be able to auto fill weekdays (skipping Saturday & Sunday) in a month. For example, my spreadsheet would look like this if cell A1 contains12/01/09:
DATE WORKDAYS TASK
1-Dec 1 AP CLOSE - CAPITAL & POS ITEMS 1-Dec 1 POS MONTH END 1-Dec 1 HEALTH INSURANCE 2-Dec 2 DEPR SYSTEM RUN; INCL-SOFTWARE AMORT 2-Dec 2 SPECIAL EQUIPMENT 4-Dec 4 PRELIMINARY ENERGY REPORT 7-Dec 5 AP CLOSE - ALL OTHER ITEMS
The DATE column needs to return the date for WORKDAYS listed...Monday through Friday only. The first workday in Dec 2009 is 12/1, the fifth workday is 12/7, and so on.
What I am trying to do is cause (where the formula is) to:
If A2 is empty, put nothing, If C2 is greater than today put nothing, otherwise put C2 If E2 is empty then if b2 is "1st" add 4 workdays to A2, otherwise add 5 workdays.
I seem to have a problem with getting the formula to put the value of C2 if it is not greater than today In otherwords if the date in C2 is 6th Jan, i want 6th Jan as the result of the formula.
I have a file with 3 sheets with Sales data. First sheet is for capturing Sales data, second sheet, with some Weekly Analysis and Monthly Analysis using COUNTIFS, third is charts based on second sheet's formulas.
When I use COUNTIFS function to capture the monthly sales nos, the working days in different months vary from each, obviously. Some months have 20 days, some with 21 days, some with 22/23 days. How to write a correct code for varying working days, because I have to capture only the working days in a month, and in THAT MONTH only, leaving all Sat days and Sun days?
My formula goes like this in cell E3 and I have attached my sample file as well.
eg: If I want to measure Monthly Sales performance for a salesman, Date of Sales Performance measure will be done on the last WorkingDay/WeekDay of that month, in the month Sep-2013, Performance will be taken on 30-Sep-2013, till the 21 weekdays backwards. i.e. 02-Sep-2013. In the month of Aug or Feb the no of weekdays differs.
I'm not sure if using the Dcount formula is the right one in my example below, but I can't get it to work. Here is my data:
A B C D E F G H 1
ThrFriSatSunMon TueWedThr2 2030101512
I'm looking for a formula that would count the number of Weekdays with data in it. So the answer would be 3. As I enter data into column F, G, H, etc. the count would go up and would always skip "Sat" and "Sun".
I know there have been posts regarding this before, but I can't quite get any of them to work. I'm trying to create a function which counts the number of working days between two dates. I've come up with the following code, but it doesn't work.
Function dayscount(Firstdate As Date, Lastdate As Date) Dim x As Long x = 0 For i = Firstdate To Lastdate If WorksheetFunction.Weekday(i, 1) > 1 And WorksheetFunction.Weekday(i, 1) < 7 Then x = x + 1 End If Next i daycount = x End Function
I then use the formula "dayscount(A1,B1)", where A1 is my first date, and B1 is my last date.
I have a form to round to nearest quarter but if it is less than 1 hour I need it to round to a total of 1. Can this be combined in one formula.
I also need my time to be configured so that if the start time is a PM number then end time AM it does not figure right. is there a way to remove the AM/PM from time. I have already tried all the formats from number,time, & custom.
I have a list of FLIGHT departure times that are listed in MIL TIME, however, there is no : in the format. Its just 4 or 3 digit numbers. I need to convert these to time in 12-hour clock. If I go to FORMAT/CELL/TIME and select 1:30pm it simply makes the time ZERO!
I have class monday, tuesday, wednesday & friday but no class thursday. How can I make automatically fill in dates for weekdays only and skip thursday using excel 2013's "Fill" function then "series" ??