Calculating Formula Not Working Properly

Nov 15, 2008

I am trying to work out an excel workbook for calculating family recipes. I have gotten most of it figured out but am having a problem with one thing. When the serving size of an item is 8 oz & the recipe calls for 14.5 oz the only way I can get it to work properly is to enter 1.75 in the serving size.

But I would like (actually need) to be able to enter the 14.5 and have it calculate the calories correctly - since sometimes the amount to be added to the recipe may be 15 ounces and the serving size is 8 ounces etc....

View 6 Replies


ADVERTISEMENT

Rank Formula Not Working Properly

Oct 7, 2009

I have a rank formula that is seemingly erroring out on certain cells - indiscriminately. I have tried and tried to figure this out for myself but this is beyond my knowledge.

Only on some cells is the rank not working and returning a "-" (the error result).

I want the rank to use absolute numbers, so that it will rank according to variance or percentage (regardless of +/-). I am also using another cell (R1) to tell the rank what column to use.

As you can see there are a few entries, both + & -, that are not being included in the rank - for reasons beyond me.

View 8 Replies View Related

Ranking Formula Not Working Properly

Oct 25, 2009

I have 6 categories that need to be ranked 1-6 in order of highest number of occurances. My ranking formula is showing 1-7, missing number 3. I have attached a sample worksheet further showing what I am trying to explain. I need cell A3 to show a ranking of "3". Currently it shows "4". What am I doing wrong??

View 4 Replies View Related

One Of The Values On Pivot Table Not Calculating Properly?

Feb 3, 2014

This pivot table is used to track referrals for an employment service, and needs to show monthly totals of referrals, enrolments, cancellations and placements.

I have the referral date as one of the row lables, but it seems that each of the others now only reflectes back to that date rather than the date entered in that value

EG:

5 clients referred in September, One was placed in October, 2 in December and 1 in Jan but the totals for placed are all showing in September rather than the month the clinet was placed.

View 4 Replies View Related

Sum With Offset Not Working Properly?

May 30, 2013

Total amount in Column B should same as shown in Column F

=IF(E3<>"",SUM(OFFSET($C3,ISTEXT(E3),,,1):C3),"")Above formula is calculating always two rows.

View 2 Replies View Related

Vlookup Not Working Properly

Apr 10, 2009

I have problem with vlookup. I am attaching my file.

View 3 Replies View Related

Sorting A-Z Not Working Properly

Sep 3, 2013

I am including an attached file for reference.

The file is sorted A-Z, but if you scroll down towards the bottom, you will see that some values are out of order. Both instances of University of Central Florida and University of North Dakota are out of place.

University of Central Florida should be between University of California and University of Colorado.

University of North Dakota should be between University of Colorado and University of Southern Mississippi.

View 1 Replies View Related

Chdir Not Working Properly

Feb 5, 2009

I have a really strange problem i have two different hard directories o: & u:

i have the following code linked to a command button

chdir "U: foldername foldername foldername"
saveactiveworkbook.saveas range("c9")

View 6 Replies View Related

Selection Not Working Properly

May 25, 2006

I try the following selection

Columns("B:AF").Select
Selection.ColumnWidth = 2.3

It is selecting columns a to af. Why would take column a if it is not part of select?

Sub Add_worksheet_month()
Dim Lst() As String
Dim I As Integer
Dim wname As Date
'Dim wmonth As Date

View 4 Replies View Related

MSForms.CommandButton Not Working Properly

Jan 29, 2009

I have a form with 2 buttons and a frame. Inside the frame I have another button. I get a Type Error Message when I run the code and I don't understand why.

View 3 Replies View Related

Exit Sub Property Is Not Working Properly!!

Jun 22, 2009

I have the following two codes on a userform, The first code performs two steps:

The first step is running the second code (MyDate), which is used for checking the entries in the userform textboxes and if there is any wrong entry a message box appears then it exits sub.

However, what happens when it finds any wrong entry is that it displays the msgbox and instead of exiting sub as it is requested in the (MyDate) code, it resumes running and moves to the second step and adds 1 to ComboBox1 ListIndex.

View 4 Replies View Related

Find Statement Not Working Properly

Apr 2, 2007

I am in the process of converting my programs over so as not to use these and I am already seeing a drastic difference in speed.

I have run into a problem that I need help with. I have a spreadsheet similar to the example below. The first column contains a list of college majors and after each major is a row of classes that are required by that major.

A25346 ENG101 MAT115 PSY150
A35678 ENG111 MAT115 SOC101
A23456 ENG101 MAT116 HIS201

The first thing I need to do is search down the first column for the major. Once the major is found I need to search across the row for the class. I am having trouble searching across a single row for the class.

Here is the section of code where I experience the problem

Set rMajor = wsMajor.Cells.Find(What:=Major, After:=ActiveCell, LookIn:=xlFormulas, _
LookAt:=xlWhole, SearchOrder:=xlByRows, SearchDirection:=xlNext, _
MatchCase:=False)

If Not rMajor Is Nothing Then
majorrow = rMajor.Cells.Offset(0, 1).Value............

View 9 Replies View Related

Cells Range Reference Not Working Properly

May 25, 2009

I often have problems with the cells range reference method. For some reason I get an error and can't tell why. Other times it works fine. Is this just an unstable method to use or is this completely wrong? I'm assuming I am using the wrong syntax. It is definetly the range reference causing the problem.

Dim cnt1 as integer, cnt2 as integer,cnt3 as integer

cnt1 = 2
cnt2 = 50
cnt3 = 2

dim myrange as range

set myrange = sheets("sheet1").range(cells(2,cnt1), cells(cnt2,cnt3))

I have no idea why it won't work. I'm basically searching a columner range of cells.

View 2 Replies View Related

VBA - Insert And Rename Columns Not Working Properly

Feb 21, 2013

The code below is supposed to insert a column and rename it. However, when I debug, the code only renames the column, it does split or run the loop. I press debug again, and then code executes as it is intended.

I can't explain why I have to press debug twice for in order for the code to work properly.

Code:
Sub renameColumns()
With Sheets("byPosition")

Columns("E:E").Select
Selection.Insert Shift:=xlToRight
.Range("E1").Value = "Exemption"
.Cells.EntireColumn.AutoFit

[Code] .......

View 2 Replies View Related

Format Painter & Paste Not Working Properly

Jul 13, 2006

I've been working on a particular spreadsheet and I've just noticed that
double clicking the format painter will only format one cell. It won't
retain the format to be put into the next selected cell which it should when
its double clicked. The same goes for copy and paste. Normally once you've
copied something you can paste it into a number of cells individually, one
after the other, but after the first paste selection, the paste option is no
longer available. I can't see any settings under options to fix this. What has happened, and how do I fix it? (I'm using Excel 2003 SP1 - is there a SP2?)

View 2 Replies View Related

Using Autofilter And Multiple Criteria - Array Is Not Working Properly

Oct 12, 2012

I thought I had been able to use array to have more than two criterias with Autofilter, but now I am unable to make the following code work. What I am trying to do is have all the records that does not contain either N/A, S/O or xx and also have a filter on column 125 for the value "OUI".

VB:
Sub test()
Set ws1 = ThisWorkbook.Sheets("SOMMAIRE_EN_ALL")
Set ws2 = Workbooks("Fichier_central_2013_anglais_2_CLEAN").Sheets("DETAIL_CONCAT")
Set r = ws2.Range("A1:du4783")

[Code] .....

View 3 Replies View Related

Macro Not Working Properly For Conversion Of Date Format?

Apr 13, 2014

In the attached sheet, one macro is developed which is not working properly. My req is to convert date from dd-mon-yyyy to yyyy/mm/dd format. (23-jan-2010--> 2010/01/23)

If incomplete date is there, then hyphen should place the gap i.e.

For date like APR-2014------> Output should be 2014/04/--
For date like 1998 -----> Output should be 1998/--/--

The below macro works only for row number 11, 15 and 16.

[Code]....

Attached File : date.xlsm‎

View 5 Replies View Related

Ensure Value Entered Into Textbox - Validation Not Working Properly

Jul 1, 2014

I'm using the following code to try to ensure a value is entered into a text box, but when I click over to the next text box skipping the first one entirely, I don't receive any message indicating the previous box is empty. I'm trying to make it so certain fields are required and others are optional. Here's the code I'm currently using:

[Code] .....

View 14 Replies View Related

First Key Sort Order Not Working Properly In Pivot Table

Jul 23, 2012

I have entered a custom sort order under 'first key sort order,' but the field is not sorting according to the list.

I'm sure I entered the list correctly, because I actually entered it a long time ago, and it was working for a while. However, today the underlying data was temporarily erased, and the pivot table, when refreshed, basically went blank. I restored the data and refreshed the table, but this field is back to sorting in the wrong order. Refreshing the pivot table and re-choosing the appropriate sort options do not work.

View 1 Replies View Related

Excel 2010 :: Dynamic Range Not Working Properly

Jan 8, 2013

Had been using this formula for almost 3 years, recently the formula didn't work properly as the range goes down halfway only instead of to the last data in the column. I'm using Excel 2010 now.

=Sheet1!$A$2:INDEX(Sheet1!$A:$A,COUNTA(Sheet1!$A:$A))

View 2 Replies View Related

Calculating Net Working Hours

Mar 13, 2008

I am working in call center, and I get tickets and i have to meet my Services Level Agreement (SLA) with in pre defined working hours.

My working hours are 8:00 AM to 17:00 PM, Monday to Friday. (this includes 1 hour of Lunch time which is not considered as business hour)

As per the SLA, i have to complete the ticket in 40 business hours, i.e 5 business days.

Suppose a ticket is created on 3/5/2008 10:00 AM. I want to know how much time is left for me to work on that particular ticket.

View 12 Replies View Related

Calculating Working Hours Without Using Dates

Mar 18, 2014

I'm trying to calculate shift working hours without using dates.

The scenario is

Cell A1 = Start Time
Cell A2 = Start Time
Cell A3 = Break Time

Basically I want the output to calculate hours worked between:-

0000 and 0600 as a total in cell A4
0600 and 1800 as a total in cell A5
1800 and 0000 as a total in cell A6

Then if the value of A5 is greater than A3, subtract A3, but if the value of A5 is less than the value of A3, A5 should be zero and the remainder of the value of A3 subtracted from A4 (or A6) depending which has a value.

View 5 Replies View Related

Calculating Working Hours Between Days?

Aug 15, 2010

how can i calcaulate working hours between two days.

Working Hours 07:30 - 14:30

e.g. mm/dd/yyyy

start time 01/04/2010 17:34:58

stop time 01/05/2010 08:23:35

View 9 Replies View Related

Calculating Working Hours Between Two Dates

Jul 25, 2002

How should I calculate working hours between two dates? Say if start at 26 july at 15:00 and finish at 29 july at 10:00, the function should return 4 hours because the working hours are from 8am to 5pm (8 - 17), and there is a weekend between the dates. Preferably the function should work like the NETWORKDAYS() function, but it should also include the time, not just the dates. And also, if have to add say 8 hours to a date, how should I calculate the result? Also this function should aware of the working hours and holidays, so it should ignore those times.

View 9 Replies View Related

Calculating Working Days For Multiple People

Jan 1, 2009

I'm using Excel 2003, and successfully working out start date (T2 in the formula below) plus duration in days (U2) minus any non-working days listed in a seperate worksheet. =WORKDAY(T2,U2,Holidays!C6:C17)

Each 'task' is on a seperate row, and the lead officer is named in Column E. How can I get the work day function to include the non-working days for each officer as well as the global non-working days in the seperate worksheet? I thought about using a vlookup, but that only matches the first non-working day for each officer rather than all of the non-working days.

View 2 Replies View Related

Formula Is Not Showing Properly Date

Jan 9, 2007

I'm trying to have a fixed date entered into column B when data is entered into column D. Here's the formula in column B:

=IF(D3="", IF(B3=";", FixedDate(),B3))

When I enter data into cell D, I get the following result in B:

0-Jan-00

Taking this a step further, even if I do a "control + ;" I still get a value of
0-Jan-00 in the cell but the formula bar shows me "=1/9/2007'. ??

I've gone through all of the options but cannot fix this error. I have two spreadsheets using this formula. The first one worked fine last year but now I have this error in it. I also started to create a new sheet and still have the same error.

View 14 Replies View Related

Calculating Elapsed Time,respecting Working Hours.

May 1, 2009

I am looking for a formula to calculate time from one date and time to another. The only catch is I only want it to use times during specific times.

Example

Start 5/1 8am and end 5/2 8am. The working hours are from 7am until 4pm and from 8pm till 5am. In this example the solution should be 17 hours.

How do I set up a formula to respect only working hours (also excluding weekends except for Saturday early am from midnight until 5am.

Sorry if this is confusing, I am trying to use IF statements but I’m fighting a losing battle.

View 7 Replies View Related

Excel 2013 :: Working With Tabs And Calculating Across Multiple Ones

Jan 6, 2014

I am working on a commission report for our veterinarians. I have a tab/sheet for each year, with a column for each month, a row for each of the veterinarian. Each vet is on the same row, year to year. I need to be able to calculate the %, year to date, for each vet, across the past 2 years. I can do the auto sum, but do not know how to do percentage. I have row 3, column b3 thru m3. I want to do 2012 and 2013. Each sheet is name the year.

View 1 Replies View Related

Calculating Task Completion Time In Working Hours

Oct 15, 2007

The below is for Excel 2003.

I want to set up a spreadsheet that can show my work is completed within a service level agreement, based on working hours of 9-5 Monday-Saturday.

I want to be able, for example, to log that a piece of work is reported at 09:00 on a Monday and completed at 10:00 on Monday and for excel to calculate that as 1 hour until completion. Fine so far. But what if that job was closed at 10:00 two days later? Based on an 8 hour working day, that should be 17 hours.

And what if a bit of work comes in at 17:00 on the Saturday. No one works the Sunday. Say the job is completed at 10:00 on the Monday. that should calculate as 1 hour to completion.

The SLA I'm setting is 4 hours.

View 9 Replies View Related

Formula For Calculating Tax?

Feb 12, 2012

I've made a spreadsheet that allows the user too enter their clock in and out times in a day for a week, it allows you too fill in two weeks worth (because we get paid fortnightly). It automatically calculates each week's pay once it has been filled in, all I need is a formula too calculate how much they would be paid after tax. I can work how much they will be paid for the 2 weeks befor tax, but I just need a formula too deduct tax from this.

View 9 Replies View Related







Copyrights 2005-15 www.BigResource.com, All rights reserved