I need a formula that will calucalte the monthly total based on the following conditions:
Col A = Yearly Cost
Col B = The number of the month when the costs are starting (1=Jan etc)
Col C = The duration or the number of months for which the costs are to spread
Col D is Year 2013 with the months across columns D-O. Row 1 above those columns shows the month's corresponding number.
Right now I have =IF($B3<=D$1,$A3/$C3,0) however if my start month is 1 and my duration is 5, I need the costs to stop after May. I've attached a sample file. Calculate based on start month and duration.xlsx
I have a spreadsheet with 4 columns - Start Date, Start Time, End Date and End Time. In the 5th column, I need to fill in the "Duration" which is calculated as follows :- Duration = (End Date,End Time) - (Start Date,Start Time)
I would like to calculate the week number of the month based on a date.
Now my days would only include working weeks (Monday - Friday).
Supposed the date is 12/31/2012:
M 31-Dec T 1-Jan W 2-Jan TH 3-Jan F 4-Jan
Since it only occupies 1 day of the workweek, then it will be considered as Week 1 of January. If the date is 1/28/2012:
M 28-Jan T 29-Jan W 30-Jan TH 31-Jan F 1-Feb
It will be considered as Week 5 of January since it occupies 4 days of the working week. If the date is 4/29/2013:
M 29-Apr T 30-Apr W 1-May TH 2-May F 3-May
It will be considered as Week 1 of May since it occupies only 2 days of the working week.
Basically if the date's month occupies 3 or more of the working days of the workweek then it will be considered as part of that month's working week. Is this possible with formulas? I tried to explain it the best I can.
I have a column say column B for example that has a list of dates in the format dd/mm/yyyy. I would like a summary at the top of the columns to state how many dates there are for the current month. But I wondered if this was possible based on the TODAY() function or similar. Thus the user would not have to change anything.
So for example at the start of the month it may state 14. Half way through the month down to 6 and at the end of the month 0 for example.
Date entered Name Date of Birth (DOB) Occurrences of Name + DOB this Month Occurrences of Name + DOB within last 3 Months Occurrences of Name + DOB within last 6 Months
I can manage the occurrences this month but haven't a clue how to calculate the 3 and 6 months ones. I have attached a sheet.
Start date: 12/04/2004 End date: 12/04/2006 The formula should give the answer to 24 months
Example 2 Start date: 12/04/2004 End date: 13/04/2006 The formula should give the answer to 25 months
When I use function =(YEAR(A4)-YEAR(A3))*12+MONTH(A4)-MONTH(A3), it does not show 25 months for "Example 2" as it is still within the same month "April"
I have 2 dates a Start Date and an End Date. I need to calculate the number of days from Start to End over eight years with each of the eight years in its own column.
How to create a spreadsheet with what I think will be a very simple formula?
If date in B2 - date in A2 is 1 or less days, put a 1 in cell C2. If date in B2 - date in A2 is 7 or less days but more than 1, put a 2 in cell C2. If date in B2 - date in A2 is 30 or less days but more than 7, put a 3 in cell C2. If date in B2 - date in A2 is 90 or less days but more than 30, put a 4 in cell C2. If date in B2 - date in A2 is 91 days or more, put a 5 in cell C2.
OR
Another, maybe simpler, way of saying it is:
If date in B2 - date in A2 is 1 or less days, put a 1 in cell C2. If date in B2 - date in A2 is 2-7 days, put a 2 in cell C2. If date in B2 - date in A2 is 8-30 days, put a 3 in cell C2. If date in B2 - date in A2 is 31-90 days, put a 4 in cell C2. If date in B2 - date in A2 is 91 days or more, put a 5 in cell C2.
I have a form in work which acts as a tick sheet for tasks complete on a construction site. When a task is complete I copy & paste from a key of dates i.e. week ending 11.05.15, this allows me to see what week a task was complete.
Generally I only marked off tasks which were 100% complete but my manager wants me to enter the % of the task complete also, i.e. 80% in the box.
So my question is how can I have the formula assume that any box with a date & shading is 100% and any cell with a number i.e. 80 is only 80% complete. I need it to monitor around 150 cells and give me the overall % complete based on what i have discussed.
I'm needing a formula that will determine the number of days that fall in a specific month based on a date range. For example, if I have a date range of 10/15/2009 to 01/13/2009, I need the formula to determine the number of days in each month within the range (October has 15 days in the date range; November has 30, December has 31, and January has 13.) I have a large spreadsheet that would be so much easier to manage with such a formula. Currently, my spreadsheet is setup as follows. I need the forumla automatically fill in the number of days under each month.
Stard Date End Date Oct-09 Nov-09 Jan-10 Feb-10 10/15/2009 01/13/2009
I am working on a sheet that will allow a user to enter a start month (from a pre-defigned drop down list) and an end month (again from ddl). What I need to calculate is in what months the employee worked in so I can calculate their salary cost by quarter.
It can populate other cells in order to do the calculation if needed. So, for example if an employee started in May, and worked until December, I need to calculate that he worked 2 months in Q1, 3 months in Q2, 3 months in Q3, and 0 months in Q4. Our fiscal year is April to March.. ;-) I have thought of several options, but none of them have worked 100%.
I have a list of months in column A and would like a formula in column B that calculates the number of calendar days for each month (i.e. Jan=31, Feb=28 etc.)
My finacial year starts on the 1st of October of each year and ends 30th of September each year.
My week is from Monday to Saturday - though for calculation ease: lets say that my week is from Monday to Sunday.
I need to calculate the week numbers of a date based on the above two criteria.
I understand that I need to ascertain the day of the start date first i.e: did 01/10/07 fall on Monday, Tuesday etc. - In fact it was Monday!
so for my year 07/08:Week 1 was 01/10/07 to 07/10/07Week 2 was 08/10/07 to 14/10/07ETCSo in the attached worksheet - what formula can I use to populate column D - by using the data in column E?
I.e. All I want to do, is input date into E and B, C, D will be calculated automatically. It would be great of excel could populate A - aswell ;-)
I need a formula to calculate a date 6 months forward from the start date. However, in the calculated 6th month, I need it to the day before the start date.
I have a excel sheet of data numbers which blongs a packet of inventory where i found number series like this:
Start Range End Range Qty 2101200 2101499 300
I have to draw this onto a series like 2101200 then 2101201 then 2010202 etc. but some time these numbers are in qty 30000 or more. I have questions
1- If any macro colud fill series suppose if write number in A2 and qty in B2 so it reads the qty of b2 and fill the series in A. If i write 1 in A2 and write 50 in B2 so the series should be auto fill 1 to 50.
My Second question is opposit of my above question.
2- if i have different number series in column a and i want them to be as start number in column b and end number in column c and qty in column d based like mentioned below example. Series [b]Start Range End Range Qty 1 1 1 1 3 3 3 1 5 5 7 3 6 7
In one column I'll have a list incrementing in 1w,2w,3w,1month and I want to be able to count the number of days that have elapsed till the latest cell. Right now I'm just winging it by saying there's always 31 days in one month using a COUNTA function, but I need it to be accurate.
Take a look at the attachment file. Those highlighted in yellow are entered by the user. What is the formula to calculate the End date in (A6) after the user has entered the start date (A2) & the number of weeks (A4)?
I have contarct for amount $5000 with a start date of 1/1/2014 - 3/31/2014 (3 months). I would like to equally split my amount based on my number of months between 1/1/2014 and 3/31/2014 ie $1666.66/per month.
I have checked searching the forums for this but nothing that really matches what I am looking for. I am trying to, from a date, deduce how many days there are in that month. I have tried a solution where I look at EOMONTH adding and subtracting but this is quite cumbersome. Is there some code out there where someone has solved this?