Counting Weeks With Date Time Spans

Mar 21, 2007

I need to make formulas to count the number of weeks that each phase of a project takes, but I currently have the start and end dates of the phases. (See attachment)

View 5 Replies


ADVERTISEMENT

Calculate Time Spans With Constraints

Dec 20, 2006

I need to calculate time period worked between 19h00 and 24h00 in following exemples,

start time 08h00 and End time 20h00, would be 1 hour

start time 20h00 and End time 08h00, would be 4 hours

I can't get IF fonction to work with times..

View 9 Replies View Related

Calculate Time Difference That Spans Into Next Day

May 27, 2008

I'm trying to do some calculations involving times. I'm using the format [=A2+(A1>A2)-A1] in order to calculate times from one day to the next which avoids negative numbers. This is working well. My problem is now that I'm trying to develop my spreadsheet and am trying to embed this inside an IF statement as the [value_If_True]and I get an error because it doesnt like the leading equals sign inside the IF statement.

View 6 Replies View Related

How To Calculate Total Hours Worked When Time Spans From 11 PM To 4 AM Next Day

Sep 17, 2012

Any way to calculate the total hours staff work based on the mininum time of the first transaction to the maximum time of the transactions. I used a DMIN and DMAX function to get those times per employee. The issue is then the time goes over from one day to the next, such as from 11 PM to 4 AM the next day. As you can see in the data below,the fourth record shows the minimum time as 12 AM and the max as 11 PM with total time worked as 23 hours. In this example, the total hours worked should be five hours.

min time
max time
total hours

7:00 AM
16:00
9:00

[Code] .......

View 4 Replies View Related

Date Spans In Select Case

Jul 24, 2007

I'm trying to write a code to define different months and shade their backgrounds but i can't seem to get it to work.

The fields are set out as follows:

01/01/2007 13:31

The code i have at current is:

Private Sub Worksheet_Change(ByVal Target As Range)
Dim icolor As Integer

If Not Intersect(Target, Range("A1:Z1000")) Is Nothing Then
Select Case Target
Case 1 / 1 / 2007 To 31 / 1 / 2007
icolor = 6
Case 1 / 2 / 2007 To 31 / 2 / 2007
icolor = 7
Case 1 / 3 / 2007 To 31 / 3 / 2007
icolor = 8

View 9 Replies View Related

Counting Weeks INVOLVED Between 2 Dates

Nov 3, 2008

I've been having problems coming up with a formula that will take a start date and an end date and come up with the number of weeks INVOLVED within this date range (each week being a Sunday through Saturday).

My problems is that the start and end dates could be any day of the week and not necessarily the same day (meaning divisible by 7 doesn't always work). I tried using ROUND((A2-A1)/7,0)+1 where A1 was the start date...and A2 was the end date.

The problem I had was if I picked a Monday as the start date, and went 12 days out (The saturday of week2)...it came up stating 3 weeks were involved - AND if I selected a Friday start date and picked the following monday in week 2 - the result was 1 week involved when 2 different weeks were involved.

View 4 Replies View Related

Counting Data With Date And Time

May 13, 2014

I'm trying to count how many times an action happens between a time frame on a certain date.

This is how my data looks and comes to me (screen shot of a small portion of it - there are 22876 cells to count and it's very time consuming to manually):

data by rld2m2, on Flickr

There is no way to separate the date and time with the program the data comes from.

What I'd like to do is count what how many transactions take place between 10/1/2013 12:00:01 AM and 10/1/2013 3:00:00 AM (example time frame) from the above data.

View 2 Replies View Related

Counting Days In Date/Time Format

Sep 10, 2008

I am trying to count the number of orders written per day. I used the following formula on another sheet and it worked fine, however on this one, A8 is a date only, and F2:F2000 is a date and a time.

I tried reformating the cell for date only, and it displays only the date, however, the time information is still stored, and I can't get it to do the count. Is there a way to count the date regardless of the time?

=COUNTIF('ACT Legacy'!$F$2:$F$2000,Stats!A8)

View 5 Replies View Related

Counting The Number Of Days Overdue Based On Date And Time?

Jun 17, 2014

I have the following:

A1 = Date item is due. (DD/MM/YY format)

A2 = Time the item was delivered (HH:MM:SS format)

B1 = Actual Date item was delivered.

B2 = Actual Time item was delivered.

I'd like C1 to count the number of days the item was late. - taking into account that 16:00:00 is the deadline on each date.

For example:

Due Date: 17/06/14 @ 16:00:00

Arrival Date: 17/06/14 @ 16:01:00

Days Late = 1

Due Date: 17/06/14 @ 16:00:00

Arrival Date: 18/06/14 @ 15:00:00

View 10 Replies View Related

Counting Number Of Days Overdue Based On Date And Time

Jun 17, 2014

I have the following:

A1 = Date item is due. (DD/MM/YY format)
A2 = Time the item was delivered (HH:MM:SS format)

B1 = Actual Date item was delivered.
B2 = Actual Time item was delivered.

I'd like C1 to count the number of days the item was late. - taking into account that 16:00:00 is the deadline on each date.

For example:

Due Date: 17/06/14 @ 16:00:00
Arrival Date: 17/06/14 @ 16:01:00
Days Late = 1

Due Date: 17/06/14 @ 16:00:00
Arrival Date: 18/06/14 @ 15:00:00
Days Late = 1

Due Date: 17/06/14 @ 16:00:00
Arrival Date: 18/06/14 @ 16:01:00
Days Late = 2

View 3 Replies View Related

Calculate Time Over Last 2 Weeks?

May 15, 2012

I have a calendar. All months across the top, formatted as date mmm with content 1/2 2/1 3/1 4/1, etc. so the cells display Jan Feb Mar Apr, etc. All days down the side formatted as number displaying 1, 2, 3, 4, etc. All the days of the year are formatted as time h:mm.

I want to create a cell that shows me the total time for the last 14 days.

View 1 Replies View Related

Userform Validation If Date Is Within 2 Weeks Of Today Date

Mar 19, 2014

I am setting up some validation on my userform. In this case if a user enters a date within two weeks of todays date they will not be able to proceed onto the next page.

Example: Todays date is 19/03/14. If a user enters 25/03/14 into 'TxtDate' they will not be able to proceed.

[Code] ......

View 2 Replies View Related

Calculate End Date From Start Date & Number Of Weeks

Jun 26, 2007

Take a look at the attachment file. Those highlighted in yellow are entered by the user. What is the formula to calculate the End date in (A6) after the user has entered the start date (A2) & the number of weeks (A4)?

View 5 Replies View Related

Is Date Past X Weeks From Current Date

Apr 24, 2008

How would I write an if statement that checks to see if the date entered is two weeks past?

View 9 Replies View Related

VB Calendar, If Date Not Within 12 Weeks, Then Msgpop Up

Mar 23, 2009

I can get the calendar control to come up and the value selected on the calendar to show up in a certain cell.

If a user selects a date that is not within a certain 12 week range, I want a message to appear ("date not within 12 week program"), and the user can't select the date.

I am storing nutrition data from a certain date the user chooses and it is a 12 week program from the start date. I want to retrieve info from those 12 weeks but do not want them to be able to select data outside the 12 weeks.

View 9 Replies View Related

Add Cell Number To Date & Add Weeks

Aug 19, 2007

I want to add a numeric number eg: 4 to a date format eg: 15/08/2007 so that it calculates 4 WEEKS from 15/08/2007 and returns the CORRECT date in a date fomat itself. How do i do this through a VB code ?

View 9 Replies View Related

Calculate Date Difference In Weeks

Sep 21, 2007

On some Military computers the Add-ins were not installed, therefore the WEEKNUM function cannot be used.

The task is to calculate the time interval (in whole weeks) between two dates.
(Every start date is to be calculated as a whole week – same for the End date).

I tried but the most but came up with the incorrect formula in the attached workbook.

View 9 Replies View Related

Date Differences In Days, Weeks Or Months

Jan 3, 2008

I've been racking my brain on this one for awhile, and I feel like I'm going the right direction but...

I have a list of dates like:
11/30/2007
10/31/2007
9/30/2007
8/31/2007
7/31/2007
6/30/2007
5/31/2007

or maybe

11/30/2007
11/23/2007
11/16/2007
11/9/2007
11/2/2007
10/26/2007
10/19/2007
10/12/2007
10/5/2007
9/28/2007
9/21/2007
9/14/2007
9/7/2007
8/28/2007

...and I need to determine if the difference between them is daily, weekly, or monthly. There are 79 of these lists, on 79 different sheets so I can't visually peg them as daily, weekly, or monthly.

The way I have been looking at the problem is to calculate the number of months between the last & first dates and see if the resulting answer (+1) matches the number of actual dates, and so on...

View 5 Replies View Related

List Of Weeks From Start Date And Input Number

Apr 16, 2014

I am trying to create a simple set up where the operator can enter a starting date and the number of weeks they want this event to occur. This then produces a column of dates from the starting date to the end date for the number of week entered.

E.g. - start date = 16/04/2014 - No. of Weeks = 3

The output would be as below

16/04/2014
23/04/2014
30/04/2014

View 4 Replies View Related

If Statements: Option Of Between 3 Weeks And 6 Weeks

Sep 7, 2009

i currently have a what if statement

=IF(B2>=NOW()-42,"< 6 wks","> 6 wks")

I need it to also give an option of between 3 wks and 6 weeks

Therefore all options are

3-6 WKs
< 3 WKs
> 6 WKs

I have mastered 2 but now need a 3rd.

View 7 Replies View Related

Excel 2007 :: Create Bar / Count Weeks And Colour Bar From Input Date?

Feb 14, 2012

I am trying to simplify a type of gannt chart bar across a spreadsheet. The spreadsheet has dates across row 3 that are calculated from the first cell F3 with =F3+7 to populate the rest of the row with dates. I want to be able to input a start date in D4, then all the other titles in column A. This start date will start the coloured bar at that start date in the chart, I will then copy/drag that start date cell for however number of weeks for the duration and I want the finish date to auto populate E4 with the finish date and also auto populate the numbers of weeks in C4 for that bar.

Excel 2007ABCDEFGHIJKLMNOPQRSTUVWXYZAAABACADAEAFAGAHAIAJAKALAMANA
OAPAQARASATAUAVAWAXAYAZBABBBCBDBEBFBGBHBIBJBKBLBMBNBOBPBQBRBSBTBUBVBWBXBYBZ
CACBCCCDCECFCG1D42342McArthur River Mine Power

[Code]....

View 9 Replies View Related

Time Analysis - Counting Time (hours) / Each Timestamp

Nov 14, 2012

I have this spreadsheet where it is basically call center data so in one of the column it shows time of inbound call as example (21:12:05) and other columns shows specific notes about that call example if product was sold on that call or not. So I am trying to find trend that during what period of time in a day maximum product was sold. Example I want to set some criteria that from 8 am to 10 am, 10 am to 1 pm and so on and then to find how many products are sold. So what I am looking is how can i extract hours as numbers only? from time stamp? I tried using =RIGHT(a1,2) but its not working and it messing with the number format.

View 4 Replies View Related

Convert Human-readable Text Strings Into Consistent Number Of Weeks From Today Date?

Dec 17, 2011

Is it possible to do the following with a formula in Excel...

I have a list of users with the dates they first logged into a system and the date they last logged in. I'm trying to group them together into segments so I can analyse them using a Pivot table and chart to see how often different groups are using the system, e.g. New customers in December, November, October, etc.

The trouble I am having is trying to convert the different human-readable text strings into a consistent number of weeks from today's date, e.g.

USER FIRST LOGGED IN LAST LOGGED IN
user 1 2 years 20 weeks 54 sec ago
user 2 44 min 7 sec 1 min 37 sec ago
user 3 49 weeks 2 days 17 min 3 sec ago
user 4 5 weeks 2 days 33 min 32 sec ago
user 5 38 min 9 sec 38 min 9 sec ago
user 6 5 weeks 3 days 1 hour 7 min ago
user 7 2 hours 17 min 2 hours 11 min ago
user 8 45 seconds ago 45 seconds ago

Is there a formula I can use to convert these human readble text strings into a number of weeks elapsed since today's date?

View 9 Replies View Related

Date/Time Formula: Pick Up A Date With Time Entry On A Worksheet And Place It Into A TextBox On A UserForm

Jun 17, 2006

I am attempting to pick up a date with time entry on a worksheet and place it into a TextBox on a UserForm. Format on the sheet is mm/dd/yyyy h:mm AM/PM. The UserForm is placing the value as mm/dd/yyyy 12:00 AM. here is the

Private Sub UserForm_Initialize()
If Not Range("dDate").Value = "" Then
TextBox2.Value = Range("dDate").Value
TextBox2.Text = Format(DateValue(TextBox2.Text), "mm/dd/yy h:mm AM/PM")
Else
TextBox2.Value = ""
TextBox2.SetFocus
End If
End Sub


"dDate" is the named range where the date is sitting. The format is also set on the TextBox2 exit event. Can anyone see why only the date portion is being transfered with the default 12:00 AM for no time component of the value?

View 3 Replies View Related

Convert Imported Date / Time Data To Date / Time Format?

Jan 2, 2013

I have loaded a .csv file in which the first column contains date/times, e.g. 01/12/2012 00:00. How do I now tell Excel (2010) that this is in fact a date/time format? If I select one or more of the cells, click on the Number dialog box launcher and try to pick a suitable format tghe cells resolutely refuse to budge from being text (i.e. left-justified, still allows me to edit the 'seconds' component to a number > 60). Also which data type should I be using? The only one that appears to have a full date/time format listed is Custom (not Date or Time).

View 4 Replies View Related

Criteria To Look Up One Value However The Data Now Spans Across Two Tabs

Mar 13, 2009

I have a large amount of information. I need to use three criteria to look up one value however the data now spans across two tabs as there arent enough coulmns to support the data in one tab. I have been trying to use the following:

View 6 Replies View Related

How Can I Do A Chart That Spans Values In Different Tabs?

Sep 9, 2009

I need to create a chart that will show month over month sales for different channels. But each month total is in a separated tab in the same file.

Example:

August totals
Channel Sales
Channel 1 $1000
Channel 2 $2000
Channel 3 $500

I need a chart that will show sales for Channel 1 ,2 and 3 from jan to aug.

View 8 Replies View Related

Subtract A Static Date And Time From The Current Date And Time

Oct 24, 2007

I have a column of values resulting from subtracting a static date and time from the current date and time.

This means it is constantly updating, which makes it impossible to sort.

All my work depends on sorting those values, though.

View 12 Replies View Related

Converting Text Date And Time To Serial Date And Time

Feb 21, 2013

I import data from a program that exports dates and times as text. I have been successful using "text to columns" to separate the time from the date and then using =text(A1,"00:00")+0 to get the time to show as serial time but I'd love to be able to do the whole date/time string in one step. In cell A1 there is data that is general format and is in this format:

01/01/13 00001

No matter how you try to format it, it is not a date or time. For this project I need the serial number for the date/time. Any formula that will format it as date/time and then allow it to show as a serial date/time?

View 3 Replies View Related

Convert Date & Time As Text To Real Date & Time

Apr 22, 2008

I have 04/02/08 12:00:01 AM (mm/dd/yy hh:mm:ss AM/PM) in text format in a cell. I need to convert this to date/time custom format as given above so that I can make comparisons with NOW() output.

View 2 Replies View Related







Copyrights 2005-15 www.BigResource.com, All rights reserved