Calculate Time Over Last 2 Weeks?
May 15, 2012
I have a calendar. All months across the top, formatted as date mmm with content 1/2 2/1 3/1 4/1, etc. so the cells display Jan Feb Mar Apr, etc. All days down the side formatted as number displaying 1, 2, 3, 4, etc. All the days of the year are formatted as time h:mm.
I want to create a cell that shows me the total time for the last 14 days.
View 1 Replies
ADVERTISEMENT
Mar 12, 2014
Trying to think of a formula that will tell me the number weeks stock I have,would like to put the formula in h6 and copy across giving me the weeks stock
Green line is sales, yellow balance stock
EX1.JPG
View 6 Replies
View Related
Dec 3, 2012
In field A2 I use now() to get the actual date.In colom C8:C1000 I have all monday dates.In colom E8:E1000 I have the weekly sales figures.
How can I calculate the average sales of the last 10 weeks?
View 2 Replies
View Related
Jan 13, 2014
find the formula to calculate how many weeks between two dates for example. I how many weeks between
December 23, 2013
January 5, 2014 = 2w
January 6, 2014
January 19, 2014 =2w
January 20, 2014
February 2, 2014
View 2 Replies
View Related
Sep 21, 2007
On some Military computers the Add-ins were not installed, therefore the WEEKNUM function cannot be used.
The task is to calculate the time interval (in whole weeks) between two dates.
(Every start date is to be calculated as a whole week – same for the End date).
I tried but the most but came up with the incorrect formula in the attached workbook.
View 9 Replies
View Related
Jun 10, 2008
Calculate the weeks cover of current inventory based on a sales forecast. the forecast is in weekly buckets so I was thinking using some form of loop statement within the function which basically starts with the inventory figure then subtracts the forecast week by week until the inventory figure is less than the weekly forecast. I should then be able to divide the inventory by forecast and add back the number of loops to give me the weeks stock figure.
I have done this using if statements but it will only allow me to use 10 statements in the function and I need to do this for a full years worth of forecast.
Does anyone have a suggestion as This problem is becoming quite frustrating.
Here's an example of how the spreadsheet looks
Forecast103050205040Inventory 20019016011090400Weeks Cover6.05.04.03.02.01.0
View 9 Replies
View Related
Dec 27, 2013
I am looking for a simple formula that would look at column A2-A100 and calculate the whole number for the number of the week I am on. So in cell K22, I would like it to add up the A column and spit out a number 4, then on Monday when I add a new record I would like it to automatically update to a 5; indicating the 5th week I have been tracking the data. This number is needed to calculate the average amount in a work week accurately and automatically in cells K20 & K21. New weeks start on Monday and end on Friday. No data will ever have a date of a Saturday or Sunday. I have colored the cells currently to indicate what the number should be. There is 4 alternating colors now. The color coding is just for reference and will not be used going forward. Data will be entered weekly indefinately.
View 3 Replies
View Related
Mar 21, 2007
I need to make formulas to count the number of weeks that each phase of a project takes, but I currently have the start and end dates of the phases. (See attachment)
View 5 Replies
View Related
Jun 26, 2007
Take a look at the attachment file. Those highlighted in yellow are entered by the user. What is the formula to calculate the End date in (A6) after the user has entered the start date (A2) & the number of weeks (A4)?
View 5 Replies
View Related
Sep 7, 2009
i currently have a what if statement
=IF(B2>=NOW()-42,"< 6 wks","> 6 wks")
I need it to also give an option of between 3 wks and 6 weeks
Therefore all options are
3-6 WKs
< 3 WKs
> 6 WKs
I have mastered 2 but now need a 3rd.
View 7 Replies
View Related
Mar 8, 2014
production01.png
I am trying to figure a way to search for a cell that has a specific date and time range. There are several cell titles pending on the activity. I want to find a cell that has a time ** 7:30-15:30 , 15:31-17:30, 17:31-20:30. The end result is to calculate the activity between those time periods based on the data cells.
Example
If the date searched time field ** the activity ranges is 1635 I need to split the time and credit the activity time in the 730-1530 time and the rest on the 15:31-17:30 time
I have been able to do it on a single labor group based on time alone, but when I try to add the DATE to it my numbers go null. Eventually i will need to add 11 labor groups daily for weeks at a time .
Excel 2007
View 3 Replies
View Related
Apr 27, 2014
Formula to calculate time allotted minus time used and show the difference in hour and minute.
View 1 Replies
View Related
Aug 28, 2009
I am wanting to calculate the the processing time for an order that takes place within normal business hours and workweek. A normal day is from 8:00 to 5:00 If a task is started at 2:00 PM Monday and finished at 10:00 AM Tuesday then the result should be 5 hours as I do not want to include any time outside of normal hours. I can figure out how to subtract dates and times but not how to bridge a day(s). My data is somewhat flexible as I have not started the project yet. I can use separate cells for the times and dates or have two cells that use both incorporate the date and time (8/27/09 2:00 PM) for start and end time or any other idea.
View 6 Replies
View Related
Jul 1, 2012
I have a problem here:
Eg.
A B C D E F G H I
1 8 pm 9 pm 10 pm 11 pm 12 am 1 am 2 am
2 8 pm 11 pm
3 8 pm 2 am
I typed a formula : =if(and(c$1>=$a2,d$1
View 4 Replies
View Related
Jun 19, 2014
I have a userform that time stamps on my userform as soon as i open the form, is there a way that when I submit, that the amount of time that I was on the call to be put in my column on my worksheet as minutes?
View 2 Replies
View Related
May 17, 2014
I found this formula similar to other formula
NETWORKDAYS(D1,F1)-1)*"18:00"-"9:00")+IF(NETWORKDAYS(F1,F1),MEDIAN(G1,"9:00","18:00"),"18:00")-MEDIAN(NETWORKDAYS(D1,D1)*E1,"9:00","18:00")
By the way ....D1 = start Date
F1 = End Date
E1 = start Time
G1 = End Time
It's GREAT! But now I need include time from 6:00 a. m. to 10:00 p. m. (I already modified your formula:
(NETWORKDAYS(D1,F1)-1)*("22:00"-"6:00")+IF(NETWORKDAYS(F1,F1),MEDIAN(G1,"6:00","22:00"),"22:00")-MEDIAN(NETWORKDAYS(D1,D1)*E1,"6:00","22:00")) because are regular working hours in Colombia but:
1. All the days (Monday to Saturday) are working days
2. I just want to calculate the time in shifts, I don't specify the start date and end date. Example: 8:00 p.m. to 11:00 p.m. Result: 2 hours, because 1 hour is after 10:00 p.m.
This are two different options, so I need two separate formulas.
View 10 Replies
View Related
May 3, 2008
This may be a bit vague but here goes.
I have to calculate the difference between the start time and end time of a job. The only catch is, how can I avoid calculating "out of hours" time. So, if a job goes from 9am to 9am the next day, I want it to avoid calculating between the hours of 23:30 and 03:30.
Another example is if a job goes from 02:00 to 04:00, I want it to avoid the tim between 02:00 and 03:00.
If there is a difference in days, so the job goes overnight, how do I take that into consideration also.
View 9 Replies
View Related
Aug 16, 2008
I've got a time difference from 8:00AM - 12:30PM as 4.30 I'm trying to get the minutes, .30, converted into a 6 minute increment, .5. Is it possible to do this and if so how would it be done? Below is a chart of how the time is converted from 6 minutes increments into decimal form.
6 = 0.1 36 = 0.6
12 = 0.2 42 = 0.7
18 = 0.3 48 = 0.8
24 = 0.4 54 = 0.9
30 = 0.5 60 = 1.0
View 5 Replies
View Related
Aug 11, 2006
I'm trying to devise a formula to produce "days in inventory" based on the following data:
Date In
Date Out (which may be blank if cargo still here)
Todays Date
Days in Whse (which is the formula I can't figure out!)
It needs to work like this, date out - date in, unless date out is null. If date out is null, the result should be calculated based off of todays date - date in.
View 3 Replies
View Related
Feb 7, 2014
the vendor has a 21 hr working window; start from 7am and goes until 4am; Mon to Fri.
Here is a scenario:
- i request for a product information from a vendor on 3-Feb-14 8:00am (Monday)
- he replies with all of the product info on 6-Feb-14 12:00pm (Thursday)
can you find the time in above scenario consideration the working window?
Here is another scenario:
- i request for a product information from a vendor on 6-Feb-14 8:00am (Thursday)
- he replies with all of the product info on 11-Feb-14 12:00pm (Tuesday)
- Sat & Sun are days off but keep in mind that my Friday shift ends on sat at 4am so the networdays formula wont work.
View 2 Replies
View Related
Feb 5, 2009
I need to calculate the time spent replying to my inquiries: I log the time I receive my inquiry as: 06/02/2009 09:23:00 in column A. I log the time I send my reply as: 07/02/2009 07:23 in column B. In column C, I need to put the Formula that will return the following result: 0 days 22.0 hours.
View 5 Replies
View Related
Aug 12, 2009
WHen I was a beginner at Excel, I came up with the following formula to calculate the time difference between two "time" values. Since I was too lazy to add a ":" between my hour and minute, I had decided to simply enter the start (column B) and end time (column C) as a military time (e.g., 0100, 1230, 1500, 1930, 2300, 2359). The following formula would be in Column D.
=IF(C7
View 9 Replies
View Related
Aug 6, 2014
how to find the average times of two different sets of groups. There are the baseline times and intervention times. Both groups have three subtopics: Time Fell Asleep, Woke Up, and Duration (how many hours I slept). I am not sure how to find the average of each subtopic. Here are the times....
Baseline times:
Fell AsleepWoke UpDuration
2:30 AM10:00 AM7:30 hrs
4:30 AM12:30 PM8:00 hrs
[Code]....
View 3 Replies
View Related
Jun 23, 2009
I have a problem with a time card i am producing. I want to count hours and minutes worked and carry forward any surplus or deficit into the next week. I can do it if the hours do not total more than 24. I have attached the file and it is formatted in 1904 format.
View 2 Replies
View Related
Dec 12, 2009
I am staring at this excel spreadsheet blankly ... I am at a loss as to how to accomplish the detailed analasys but simple math this spreadsheet reequires.
The data consists of three columns pasted from a report that is exported as a .csv:
B
Code
C
Start Time
D
End Time
The following analyses must be made on each row:
1. determine if the start time falls within the scheduled shift
View 9 Replies
View Related
Jul 14, 2010
I need to compute the total time in a userform.
I have a userform where:
1. User enters a start and end time Start1, End1 (23:00, 01:00)
2. The time difference is calculated and displayed in Total1 (2:00)
3. User enters Start2, End2 (22:00, 22:50)
4. Time difference calculated - display in Total2 (00:50)
5. Grand total of Total1, Total2 is displayed in GrandTotal (2:50)
The user will input the times as 0000 but I need to convert the entry into a time format. (User enters 1235 - I need it to covert to 12:35)
View 5 Replies
View Related
Feb 17, 2013
I have 3 numbers:
1) Current Speed
2) Current Acceleration
3) Acceleration Growth
Assuming:
Current Speed=0
Current Acceleration = 0.2 (each 'turn' the current speed will increase by this much)
Acceleration Growth = 0.2 (each 'turn', the current acceleration will grow by this much)
This gives a current speed over a series of 'turns' as
0.0 + 0.2 = 0.2
0.2 + 0.4 = 0.6
0.6 + 0.8 = 1.4
1.4 + 1.0 = 2.4
2.4 + 1.2 = 3.6
3.6 + 1.4 = 5.0
5.0 + 1.6 = 6.6
6.6 + 1.8 = 8.4
8.4 + 2.0 = 10.4
etc.
What I'd like to do is have a formula (or some way other than calculating each step) to tell me how many turns it would take for the Current Speed to =>X (example 100)
Basically, Turns to X speed = something clever * acceleration growth * something else very clever.
View 9 Replies
View Related
Sep 3, 2009
I want to be able to calculate a due date two days from an entered date/time. If I input 9/3/2009 3:00 PM into cell F6 I would like cell G6 to display 9/5/2009 3:00 PM. The formula that I am currently using includes a holiday list so if the due date lands on a day within that list it gets pushed out.
My formula is =if(F6="","",Workday(F6,2,Z1:Z144)).
Basically when F6 gets populated G6 is supposed to populate with a due date of two days later (same time of the day). Currently if my input date/time is 9/3/2009 3:00 PM the formula is displaying a due date of 9/5/2009 12:00 AM.
View 9 Replies
View Related
Mar 16, 2004
I need to find the average time it takes students to take exams . I use the following formula =text(end time - start time, "h:mm"). I am able to calculate the amount of time it takes a student to take the exam. Now I need a formula to calculate the average time students take to complete a test. I have over 80 times i need to average. Whenever i try a formula I keep getting 0.
View 9 Replies
View Related
Jan 4, 2007
I have a sheet for tracking my poker playing online.
In column A I enter the start time as an Excel Dates & Times and in column B I enter the end time in the same format.
It could look something like this:
Start time End time
2007-01-03 18:20 2007-01-03 18:50
2007-01-03 18:30 2007-01-03 18:45
(Swedish date formatting)
This means I have been playing two tables simultaneously. Now I could get total time in "table hours" using SUM Formula:
=SUM(B:B)-SUM(A:A)
which in this case would result in 45 minutes.
But I also would like to calculate effective playing time so if I play 10 minutes on two tables simultaneously it will only count as 10 minutes and not 20 minutes.
View 9 Replies
View Related