Hi guys, I would like to be able to automatically gantt chart the following data table, my problem is that i am unaware of how to create the gantt chart when there are several entries for the one location - the table is a booking sheet and the gantt chart is just a graphical display of the activity occuring in each bay - if any could help me achieve the following gantt chart from the the following table it would be much appreciated: ...
The below is a sample Gantt chart that I'm using, it's working fine, what I want to do is when the STATUS is completed (Column H) goes from a cross to a tick (I'm using the format of Wingdings 2 - cross is O and tick is P) is to change the Gantt chart colour from it's current colour of green to say orange. In conditional formatting (in cell I3) I have, formula is =AND(I$2>=$F3,I$2
I am trying to find a way to automate this crude gant chart. What I am trying to do is the following:
1: By entering a start date and due date, and by adding a percentage to 4 different goals, create a sort of gant chart for each job.
2: Have this chart update as the start and due dates change.
3: Be able to past other gant charts below this one, based on the leader assigned to each job. ie. if Dave is a leader, create a worksheet that will have all of dave's Gant charts in one workbook, on one worksheet, pasted each one below the next. The goal being we can give each leader 1 sheet that has all their jobs.
I tried so long I finally gave up and drew this by hand in MS Word:
But I wonder if you guys could help me chart this automatical in Excel.
I want to chart the time period a ship (Vela, Serpentine, Rainbow etc) are contracted. I want a specific color for the firm contract, and another for the remaining optional contract. If a ship is under construction I also want a bar showing when it's done.
Each ship has a rate. I want this written on the bar. In "Vela's" case there are to rates for the same contract: The first 740 days the rate is 24,5 the rest of the period it is 29. I also would like to be able plot an additional contract for the same ship for example after "Syrena" is done in yr 2009.
Someone else built a this timeline using a date calculation that I am unable to modify. Fix date formula in row 7 to show FY14-FY18 and in row 7 show the quarters 1-4 along the years.
Hey Guys- I'm not sure if this is even possible but I need some help. I have attached a file below similar to a gantt chart. I need help with the conditional formatting, as I have manually changed the colors to match what I need automated.
Basically I have 6 tasks and I need to change dates for individual projects but I also need the corresponding color to also change.
I am developing a Excel gantt chat i have chosen to display the bars by the lenght of the cell because the data is also most real time so as the time reduces so will the bars however the problem comes when there is tasks being done under one above it as i cant have the cells with different widths
What would be the best way to get around it as i want to keep the almost and the appearance of the real time nature of the cell width equal to the value.
I have created a pseudo Gantt chart in Excel (a horizontal stacked bar chart). The chart is driven off data I have in a Power Pivot model (Auto Refreshed) and the Gantt chart displays data which spans a fixed 12 hour time frame.
The problem I am having is that in order for me to get the chart to display correctly I must manually (daily) get the excel decimal values for my Minimum DateTime and Maximum DateTime and then enter those numbers into the "AXIS Options" Bounds Minimum and Maximum value fields. I would like to automate that process so that the Axis Bounds are either driven from the data cells OR are always set to a specific 12 hour window 6pm->6am daily.
I am looking to create a spreadheet that will automatically shade blocks in a gannt chart according to a list of dates.
I.e B13 & B14 will have the start and end date of the particular task or activity (this will be on another sheet)
Row A3 - S3 will contain dates, iusing a lookup formulas excel will look up the activity name (or number) and look for the relevant date, if the date listed in row 3 is within or equal to that date it will return yes, if not a no.
this seemed straightforad, but I cant think of a consistent formula that will do this, without having to keep changing it ...
I'm trying to create an Employee Scheduler. I want my employees (1 technician per row for a total of 10 rows) in the 1st column then the monthly calendar to the right (1 cell/day). That is what you'll see when you open the worksheet. Then, down below I set up my Data Area where I input my project, start date, end date, technician (where each tech is assigned a unique number), and other data across a row of cells. This could be infinite (or at least up to the very last row).
I modified a free Project Scheduler I got from XL-EasyGantt to become my Employee Scheduler but am having some difficulties getting it to do what I want. The project Scheduler basically works by entering (on the same row) the project (or task), the start date and finish date and then the cells get automatically filled in across those dates. This allows for overlapping of tasks but I want to create an Employee Scheduler so it doesn't allow overlapping or schedule a technician to start a new project before he/she has completed the one their on.
The main function which is in each cell of the monthly calendar is as follows: =IF(OR(AND($G28>=K$4,$G28<L$4),AND($M28>=K$4,K$4>=$G28)),IF(AND($E11="x",$M28>=K$4,$M28<L$4),"x",IF($E11=".",".","..")),"")
My problem: I want to be able to look at the Main Schedule and see when each Technician is scheduled for a job (or multiple jobs) for any given month. I want the function to look in my Data Area and assign the start date and end date of a project and the corresponding technician number and fill in the date cells across from their name in the Schedule above.
I'm attempting to chart data obtained from our phone system to see when users are logged in/on rest.
I'm using Excel 2007.
The data we extract has: person | status | start | finish | duration
Status is either "login" or "rest" Start/finish is time (h:mm) Duration is a formula (h:mm, finish - start)
I want to have a stacked bar chart that shows when a person was logged in/on rest; one bar for each person.
x-axis: person y-axis: time (8am - 6pm) legend: status
The problem I'm encountering is that each person logs in and out multiple times throughout the day (therefore, has multiple lines to their name in the data), and I can't get this information to appear on a single bar for each person.
I've sorted the data into a pivot table which gives me the information I want, but how to get the chart.
Row labels a. Person b. status c. start
Values Min of duration
Ideally, I would like to avoid using a Gantt chart within cells (as it would involve vlookup/if statements), but am beginning to think that's my only option...
I'm using a stacked bar chart (in Excel 2010, running on Windows 7) to create a simple Gantt-type chart - with just four or five bars. I've got my chart looking most of the way I want it to, but one thing still eludes me: I'd like to set up the major axis ticks to be quarters of the year (from 1/1/2011 to 4/1/2013). Since quarters are not regular intervals (they are not exactly every 90 days), I can't do this using Excel's standard functionality for choosing axis tick marks.
I'm trying to create a simplified Gantt chart of sorts, and cannot figure out one piece of it. I'm not sure how to write out exactly what I need, but here goes.
I would like to have a formula that looks at the percent completed (which the user inputs) and multiplies it by the total duration for the task to give a total number of days completed. Then, under the corresponding dates, the color of the cell would change. I've attached a simplified version of what I'm talking about.
On the attached spreadsheet, the total duration (D2) is 5 days and the percent completed (C2) is 40%. This calculates to 2 days. With that said, I would like the cells under the first 2 days under the listed dates (E2 and F2) to change color. When the percentage complete reaches 60%, then G2 would change color, when it reaches 80%, then H2 would change, and when it reaches 100%, then I2 would change.
My guess is that the formula will need to result in a particular value, and then I'll use Conditional Formatting to do the actual changing of the cell color. Assuming this is correct, I still don't know what formula to use to accomplish this.
I got a set of data which is only 2 colums collecting data problems. The output i get is a time stamp and a fault. Im looking to set a chart up with the time been on the X - axis and number of problems per hour on the Y - axis.
I created a lookup table that works quite well. It even has if statements in the LookUp Formula. However, I have to update the table it pulls the information from each day. I wind up recreating the range each time because the table always has more rows each time. Is there a way I could just paste the table in each day and not have to change the range? The columns never change.
My boss wants me to design a dynamic, updatable chart in Excel 2003. I initially made a Pivot Chart based on a Pivot Table which worked perfectly, but it doesn't look professional enough when printed (or viewed) and she wants me to approach it a different way.
So, I created a graph based on the data in a Pivot Table, and used dynamic ranges as the source for the graph series so that the chart updates when the criteria fields are changed for the Pivot Table. I then added two combo boxes (ie data validation lists) to the Chart sheet, and wrote VBA code so that whenever the combo box values are changed, the Criteria fields for the Pivot Table on the 2nd sheet are updated accordingly, and this in turn causes the graph to be updated as well.
This solution also worked perfectly, but now I've been told to create the graph without macros.
Does anyone have any suggestions? The requirements/details are as follows:
1. The Pivot Table is on sheet "PIVOT", and the graph is on sheet "GRAPH" 2. The Pivot Table has two criteria - School Name and Year Level 3. On sheet "GRAPH" there are two data-validated fields, School and Year, which only allow the selection of valid Schools and Year Levels
Is there any way to make the Pivot Table update when values are changed in the fields on the CHART sheet so that the chart also updates, but without using code nor a Pivot Chart?
As part of my work i am starting to create a two weekly programme in teh form of a gantt chart. now i have had a little google and seen plenty of spreadsheets available but they all seem to be not in a range of dates i would like. Ans plus they seem to be read only and thus i cant add a column on the end i would like for displaying resources used for the task.
Now i am sure if i searched hard enough i could find this answer but I have another question.
Whereas all the one i have seen involve typing the date and it just displays the bar.
Is there a way I can make it so that i can just click on a cell and that cell becaomes highlighted. so for example of o want at ask to happen on a wednesday i click the cell in that row and t automatically fills. and if i click it again it dissapears?
This is a very simplified version of what I need to graph but has the variables I need. The spreadsheet is set up just like this, just extrapolated over the last year. There are over 500 entries in the spreadsheet. What I need to do is to be able to calculate and chart the number of occurrences of TF and Non over time, by day, month, and year. If the data is ordered by date, how can I get excel to calculate text occurrences and graph them over the dates?
I have a large column of data that’s about 500 rows deep. I enter a few points of data a day. I want a simple bar graph to chart that data in order. Simple enough.
I set up the chart and everything. But after 2 days the chart is all scrunched up on the left side. And the remainder of the chart is considered 0. I want the chart to grow as I enter data without changing the data range every day
Currently I am trying to do a gantt like chart time summation. I'll try to explain this as clear as possible... Right now I have a program that finds the name of a part in a giant list's column and then copies a few of the other columns (priority and hours to complete) from the part names row and pastes them into a new sheet. I then sort all the found data by their priority number. The job that is gets sorted to the top is the next job to be worked on for the machine. So here is what I need to be able to do...
Based on the following example I need to be able to sum for the object bolt on Machine #1 the tenative date that the "bolt" will be completed by. It will take a minimum of 35 hours for the bolt to get off Machine #1 based on its current priority. However, the part: "bolt" needs to go to Machine #2 before being completed. The part will have to wait a hour for "hammer" before being started on machine 2. (Its data for the time it will take complete "bolt" on machine 2 is also stored in the spreadsheet.) Since the bolts priority is higher than the "nail"... the "bolt" will be the next job to be completed. My question is this: Is there a way to tenatively sum the future hours that it will take to complete the bolt and allow it to be open to changes, in case a higher priority part comes into the system?
I'm trying to create a chart that will display dates along the vertical (y) axis and time (on a 24-hour timeline) on the horizontal (x) axis. Ideally, I'd like the chart to show the various time entries on each date, perhaps represented by a point or other mark at the appropriate intervals corresponding to the time entries for each date. Failing that, a Gantt-style chart that shows a span, represented by a bar beginning at the earliest time and extending to the latest time entry for each date would be useful....
I am trying to plot two data series in one chart. The first series has monthly corn prices for last 10 years (~130 data points). The second series has bimonthly chicken prices over the last 10 years ( ~72 points). How can I plot them together? The bi-monthly periods for the second series do not exactly coincide with calender months ( e.g. Aug 19 to Oct 13, 2007). As a result, I can not adjust the points to match with calender months.
I have an Access database, with a table of jobs processed.
One column for Job ID (Unique), Date it was processed, By Who it was processed and Comments ascoiated.
I need to chart a graph of Jobs over a period of time. How many jobs done per date. In excel preferebly, I have programs like Database Plus for excel. And I am familiar with VBA. I can't figure out how to uniquely sort how many jobs for each date. As there are numerous job entries for on the same dates. I think it can be done with an SQL query or sorting it with VBA somehow. Any help will be greatly appreciated. Or can anyone suggest an application designed for charting with Access databases in Excel?