Half Hour Data Into Hourly Values?
Mar 26, 2013
I have large data sets with half hour values that I need to average into hourly values. Here is an example of the data:
28.12.2012
01:30:00
0,1
2,4
2,5
127,6
28.12.2012
02:00:00
0
0,9
0,9
118,5
[code]....
View 5 Replies
ADVERTISEMENT
Feb 21, 2013
I have a worksheet containing one timestamp column and a single column of data, the interval being one minute. How can I aggregate it to get half-hourly totals?
View 4 Replies
View Related
Jan 9, 2013
I want to create a macro or formula for changing the colour of the cell after half an hour of inputting.
View 3 Replies
View Related
Mar 22, 2007
I have a list of values at 'x' min intervals (the intervals sometime changes). I want to sum each hour's values eg. between 0:0:0 hour and 0:59:59, I want to add values 1040+800+860+870. Then I want to proceed and add all values for the next hour i.e. between 1:0:0 and 1:59:59, and so on. I have about 65000 of these calculations to do, so the need for some vba programming.
Hour value
0:14:531040
0:29:53800
0:44:53860
0:59:53870
1:14:53850
1:29:53860
1:44:53710
1:59:53670
2:14:53610............
View 5 Replies
View Related
Aug 22, 2007
I have a dataset in one column. Here 4 cells should be turned into 1 in a new column using a middelvalue.
How do i get excel to do this, so it uses 4 new cells from the first row to every new cell in the new column?
View 12 Replies
View Related
Jul 14, 2009
I have an excel work sheet with 2 columns and hundreds of rows. The first column is time in minutes over a number a years and the second is a list of corresponding data readings (numbers). I want to only select on the hour data from the list however I cannot seem to do it. The times vary in the sense that they are not all just 1 minute apart, some are every minute, then there might be a 10 minute gap in data, a few more minutes, then another gap etc.. All I want to be able to do is to select all the on the hour data from the list and its corresponding data value.
View 6 Replies
View Related
Nov 4, 2008
I have a list of days and hours, and data for whether a type of event either did or did not occur for each sampled hour. I need to return a new value, some sort of "Event Day" value, which will essentially tell me if an event occurred at least once for each day.
Attached is a sheet with 4 days' worth of data. Jan 1st and 3rd 2006 are my two "Event Days".
To complicate things, I can't be sure I have 24 hour readings for each day, so I can't assume each day is a data range (e.g. A1:A24). Hours might be missing. (As such, I am trying to organise along the lines of IF the preceding cell is the same date...)
I also have lots of data stored as months, so would love a formula I could just autofill down. All it needs to do is effectively flag up for me when a day has experienced one event.
View 4 Replies
View Related
May 8, 2014
I have a problem converting hourly data into daily data for electricity import capacity. My file has the following form:
| Connection | Date | Period | Available (capacity) | Where 'Connection' identifies the physical location of the capacity (4 possibilities, Germany -> Netherlands; Norway -> Nehterlands; Belgium -> NL; UK -> NL), 'Date' refers to the date, Period refers to hour of the day (e.g. 18:00-19:00) and 'Available' refers to the import capacity of electricity on that conncetion during that hour. I need daily aggregates and tried several things such as DSUM but I cannot manage I've shortened the attached file quite a bit because of the upload size restriction. I am using Excel 2010. I've tried some suggestions in similar topics but none worked for me.
View 3 Replies
View Related
Nov 6, 2009
I have a large sheet with the values of power from a counter in a 15 minute base.
A B
01.01.09 00:15 0,25
01.01.09 00:30 1,15
01.01.09 00:45 0,75
01.01.09 01:00 2,01
and son on until the end of the month
What I am trying to do is to create a macro which calculates the average per hour and put in another columns like this:
01.01.09 01:00 average from 00:15 until 01:00
01.01.09 02:00 average from 01:15 until 02:00
and so on until the end of the month.
View 9 Replies
View Related
Sep 11, 2013
Is there a way in excel 2010 to cut out half of the data in a cell .. to make the top four in example to look like the bottom four?
1986 Jun- 9 to Jun-13
1986 Jun- 2 to Jun- 6
1986 May-26 to May-30
1986 May-19 to May-23
1986 May-12
1986 May- 5
1986 Apr-28
1986 Apr-21
View 5 Replies
View Related
Mar 14, 2013
I have a string of data containing hourly timestamps with a value attached to each timestamp.
I need the timestamps to be every 15th minutes instead of hourly. So basically, I need the hourly value to be continued four times for each timestamp.
See the attachecd workbook. It should be quite simple, but for some reason I just cant figure it out!? A bit embarressed In the woorkbook, I need VGTs and VPTs to be in a 15 minutes granularity.
ERROR: Cannot upload workbook - uploader not showing so here are shot of the raw data:
VGTs
VPTs
01/02/2013 00:00
[Code].....
View 9 Replies
View Related
Apr 13, 2012
I have got a lot of data to put in a chart that updates every 5 minutes with new data - i have a chart that Line chart that shows this.
It shows the cost of something every 5 minutes.
I have put this in a chart using offset but obviously i want to show the cost over the course of the day - because this updates every 5 minutes, the axis at the bottom (which has the time of the data) is massive and doesn't look good.
Is there a way to show the axis at an hourly interval but keep all the data in the chart?
View 5 Replies
View Related
Sep 4, 2006
I have created a daily schedule which has a number of factory variables taken into consideration which determine the date and time a particular product should, barring any mechanical problems, come off the machine. (see attached spreadsheet).
The date at the top will be editable by me only so that when I update the production quantities, the “date/time off” column automatically re-adjusts to the remaining quantities.
The formulas are a little long winded, but I have left them that way whilst I try and develop it. I should be able to figure out how to condense them later.
My problem is that the “date/time off” on the right works excellent, but over a 24 hr period.
Ordinarily, we work a 12 hour day (6am to 6pm) with overlapping shifts to cover breaks, and 20 mins warm up at the start of the day for the machine, thus maximising a 12 hour day.
Of course if demand exceeds the allotted time we put on overtime.
Is it possible to specify that normal days are only 12 hours so that if a product exceeds 6pm, it flows into the next day with the balance starting at 6:20am?
And, if the production for the week exceeds the time could I stipulate particular days which we deem are suitable for overtime? Ie, we decide Wednesday is a 14 hour day and not 12.
I had toyed with the idea of creating a 365 day table/calendar, on another worksheet which would have its individual allocated hours in an adjacent column and somehow link them to the date/time off, perhaps by way of a VLOOKUP, but I have been chasing my tail trying to figure out how to implement it.
View 9 Replies
View Related
Jan 8, 2014
I have A:1 - X365 filled with hourly energy prices for 2013. I need to convert these to a single column - A1:A8760. I have tried writing some code and some macros with no success.
If I were to do it manually 365 times, the macro would look like this:
Copy Row A1:X1
select sheet 2
Paste Special > Transpose (fills A1:A24)
repeat for rows 2-365
Tried using this from a previous post, but it takes A1:A24 then B1:B24 and so on and makes them a single column - so it doesn't work unfortunately.
Sub MakeColumn()
Dim rng As Range
Dim LastRowSrc As Long
Dim LastRowDst As Long
Set rng = Worksheets("Sheet1").Range("A1")
[Code] .....
View 3 Replies
View Related
Oct 21, 2013
I work in a computer lab and we have to keep track of how many people sign in (using excel 2010), and how long they were here.
I'm looking for a way to count how many entries were made per hour for every hour someone was signed in.
For example someone signs in at 9:22 am and leaves at 3:34 pm.They were here from 9-10, 10-11, 11-12 etc.. and its getting very tiresome to go through and manually enter a "1" for each individual hour in each cell under the hour.
Is there a way I can feed the in and out times into a spreadsheet and have it automatically count how many people were in the lab each hour?
A
B
C
D
E
1
2
4
2
2
In
Out
8 am
9 am
10 am
[Code] ...........
View 3 Replies
View Related
Nov 12, 2013
Is it possible to take data in format dd:hh:mm and convert to working days - ie. 8 hour days?
For example:
02:12:15 (60 hours and 15 minutes .. or 3615 minutes)
to be converted to:
07:04:15 (7 working days: 4 hours: 15 minutes)
View 3 Replies
View Related
Dec 2, 2013
I have a time table which some hours are 3 hours time period. I want to distribute to new table hour by hour this kind of hours, or hour to same hour period.
Attached file, defined example and detail.
View 1 Replies
View Related
Jun 7, 2014
I am a flight instructor and legally we cannot work more than 8 hours in any consecutive 24 hour period. I'm trying to create a spreadsheet that will calculate the totals from that 24 hour period for me.
Right now I have something that sort of works, but not the way I would like it. I have a column for "time" that has the date and ending time of the flight and I am using that as if the total flight occurred at one moment (the ending time).
So, for instance let's say I did these flights
1: 8AM-10AM (2 hours, clocked at 10AM)
2: 11AM - 2 PM (2 hours, clocked at 2PM)
3: 7AM-9AM the following day (2 hours, clocked at 9AM)
If I have my formula calculate the time for 9AM the following day (totaling the past 24 hours) the first flight won't be included in the calculation since the hours from that flight is only imputed at 10AM. The formula would read 4 hours rather than the (actual) 5 hours.
Here is my workbook : 8 hour calculator sample.xlsx
Here are the formulas I am using
The time is formulated at date and time, with time being the ending flight time
The start time for the calculation is
[Code]....
end time is just =NOW()
Total calculation is
[Code] .....
All I'm trying to do is use the totals under "flight start" and "flight end" instead of the end flight time I had to put in under the date column.
View 9 Replies
View Related
Mar 5, 2014
I am working on a set of data that has a two week time period and specific times of events throughout each day. The dates and times are in separate columns and the time is in 24 hour format HH:MM. I am trying to count the number of occurrences in tenths of the hour or six minute increments, so 1-6 would equal .1 - 7-12 would equal .2 and so on - I really would remove the decimal and just express the value as 1-10. I am then just trying to do a count of the number of occurences for each hour and each day to see where the occurences are grouping. I will then graph this result to see where the clusters occur
View 1 Replies
View Related
Jun 18, 2013
I have repetitive task of copying and pasting. Macro to sort some data.
I have time values (sorted in order) in Column A and a value in Column B.
Sheet1 Â AB1TimeValue
200:00:002300:00:002400:00:001500:00:002601:00:004701:00:002802:00:001902:00:0021002:00:0031102:00:0041202:00:0011302:00:002
I need separate the time each hour of data into columns. So the above would become
Sheet1 Â ABCDEF1TimeValueTimeValueTimeValue
200:00:00201:00:00402:00:001300:00:00201:00:00202:00:002400:00:001Â Â 02:00:003500:00:002Â Â 02:00:0046Â Â Â Â 02:00:0017Â Â Â Â 02:00:002
There are a different number of rows of data for each hour and sometimes there might not be any data for a specific hour.
View 4 Replies
View Related
May 16, 2014
Macro which run after every Half (1/2) Seconds..
View 2 Replies
View Related
Apr 10, 2009
When I enter 1/2 I want it to stay as a half but when I press enter it automatically changes to the date. How can I stop this?
View 2 Replies
View Related
Jun 3, 2009
I need to pause for 0.5 seconds (half a second). How can I do that. applicatiom.Wait can only be used for whole seconds and a FOR ... NEXT loop is CPU dependant.
View 3 Replies
View Related
Feb 5, 2012
I would like to round down to interger or half. I would give you some examples:
3.76 to become 3.5
2.48 to become 2
-1.12 to become -1.5
0.05 to become 0
I tried to use round down fucntion but I am not able to have the desired outcome. I thnink the issue is with the second argument of the aforementioned function. How many digits should be indicated? I put 1 but it does not work.
View 9 Replies
View Related
Jul 29, 2008
Is there any way I can split a cell in half, so I can put numbers in the left part of the cell, and the right part?
If so, I would I refer to those numbers in my macro?
View 9 Replies
View Related
Jan 8, 2013
I have two sheets. One containing in cell B2 "1211 - Extra Core Hours" (t_Cost_Centre_data) and then another sheet that displays the data. On the display sheet, there need to be two fields. Event ID and Event Name. The event ID is the "1211" and the name "Extra Core Hours".
My question is, how do I split the reference so that only the ID and name appear in the relevant cell?
Ie Event ID Event Name
1211 Extra Core Hours
Note, the ID's and names will change and they will be multiple.
Formula Help!.xlsx
View 3 Replies
View Related
Jan 20, 2009
I have a spreadsheet with members details in and I've added a few columns showing:
Col Q: Paid 2008 (blank if No, 1 if Yes)
Col R: Show Paid Yes or No (shows a Yes or a No)
Col S: Date Joined (only entered if new and joined during 2008)
Col Z: Subs owing from 2008 (if existing members and owe last yr's subs)
Col AA: Subs to Pay in 2009 (a standard £35 or pro rata if joined during 2008)
Col AB: Pro Rata (if they joined other than at the beginning of 2008)
Col AC: EA Sub? (based on a yes/no column, to add £5 if yes)
Col AD: Total to Pay for 2009
So the formulae (or data entered) for the above columns are as follows:
Col Q: Paid 2008 - blank if no, 1 if Yes
Col R: Show Paid Yes or No - =IF(Q2=1,"Yes","No")
Col S: Date Joined - a date entered in format d/m/yy
Col Z: Subs owing from 2008 - =IF(R2="no", 35,0)....I want a default 35 in here
Col AA: Subs to Pay in 2009 - =IF(S2="",35,"Pro Rata")....says that if there is no date which indicates they are an existing member, they will pay the standard 35, otherwise they'll be paying a pro rata fee...................
Problem:
It all works fine until a certain row (27 actually) - then I get a VALUE! error which points to the Date Joined field. Now I've tested that value against the vlookup table and it returns the correct data, so why doesn't it do it in my spreadsheet????? I've tried changing the formats on the cells; clearing all data; entering a different date, but from that row in the spreadsheet down to the last row, it simply won't work! I've looked at each formula in each cell on the rows where it is working and the rows where it isn't and I can't see anything different.
What else can I look for? It is SO frustrating as it does what I need it to to do but only for a third of the spreadsheet!!!!
View 3 Replies
View Related
Sep 18, 2012
Trying to take for example, 9/25/2012 and write a formula to make the resulting cell read 2H2012. Or 4/15/2012 and have the resulting cell read 1H2012.
View 5 Replies
View Related
Jul 5, 2014
When I go to print my 1 page document, I've selected to have the page shrink to fit onto 1 page. For some reason, when I choose this option to shrink, it doesn't print the entire document, only about 3/4 of the page or so. Something I did recently that was a little different that may have caused this but am honestly not sure is i added my company logo to the header so it'd print on the document too. If I added it as an image, for some reason it wouldn't print.
View 7 Replies
View Related
Jul 22, 2007
I have created a combination chart comprising a column and a line. The columns to the extreme right and left are half visible (I can only see half of the column).
Look at my two attachments to see what i mean.
Attachments:
Excel File: http://www.MegaShare.com/235337
Screenshot:
OR
http://img530.imageshack.us/my.php?i...icture1qi7.png
Note: I have cross-posted this thread in excelforum.com: http://www.excelforum.com/showthread.php?t=608124
View 4 Replies
View Related