Adding Time :: Number Of Minutes Worked Each Day
Oct 25, 2009
I import via copy paste into excel from a timekeeping programme the following time I have worked each day, as an example:
Mon 7h 55m
Tues 6h 30m
Wed 7h 24m
etc
Is there a method of changing this in excel to work out the number of minutes I have worked each day? The timekeeping programme does not let me alter any parameters, so h & m is what I have.
View 9 Replies
ADVERTISEMENT
May 5, 2006
I have a user form with textBox1 = start time (entered as "[h]:mm") and text Box2 = finish time (entered as "[h]:mm"). I would like textBox3 to display the difference between the start time and finish time as a general number!
For example
Start time: 21:00
Finish time: 06:30
Hours worked: 9.50
Start time: 12:30
Finish time: 23:00
Hours worked: 10.50
View 9 Replies
View Related
May 11, 2009
In one of the spreadsheets there is a need to have a 'action at' field.
This is the next five minute time slot between 5 and 10 minutes in the future (eg 10.51 -> 11.00 , 1.56 ->2.05 etc)
View 14 Replies
View Related
Jun 4, 2006
If i have a start time of 5:00 am and a finishing time of 4:25 pm, what function do i use to get the total time of 11 hours & 25 minutes?
View 10 Replies
View Related
Aug 11, 2009
I need to be able to calculate the actual number of days worked for an employee over a specific date range. I have a data sheet containing employee, transactions, and date of transaction (date only, does not include time). The actual number of days worked may fluctuate due to time off or holidays, so I need to be able to calculate this individually by employee. For example, with columns Employee, Transaction, & Transaction Date:
123 ABC 07/01/2009
123 ABC 07/02/2009
123 DEF 07/02/2009
123 GHI 07/02/2009
123 ABC 07/03/2009
123 ABC 07/07/2009
123 DEF 07/07/2009
123 ABC 07/08/2009
123 ABC 07/09/2009
etc....
Should return 4 work days for employee 123 over the date range 07/01/2009-07/07/2009
View 9 Replies
View Related
Mar 3, 2009
I am trying to provide a tool for department leaders to monitor productivity for order processing in their departments. The variables I have are: Number of orders(variable), number of pickers (variable), start time(variable). Then, I know each order takes 1 picker 4 minutes to pick on average, and there are 45 minutes worth of breaks during the picking process. So after entering the variables I used =(((C3*4)/60)/D3) to come up with the time needed to process the orders. What I can't get to is how to add this number to the start time, factor in break minutes and get to the projected completion time. I have Excel 2003 at work. Clearly I need to take a class!
View 4 Replies
View Related
Jun 23, 2009
I know the title is a bit vague, but I cant think how else to word it!
I have a sheet (attached) which works out hours worked, and if the amount is under a specified target, it counts how much time is owed. The problem occurs when someone works more hours than the specified target.
I guess I need an IF formula of some kind, to say if the figure is over the target, to put zero in the hours owed column.
View 9 Replies
View Related
May 24, 2009
A B
1 4/1/09 12:15
2 4/2/09 10:00
3 4/4/09 8:10
4 4/6/09 9:00
5 4/8/09 5:00
6 4/11/09 7:00
I need to add up hours worked of last 3 days including current day. The date column does not contain everyday's date. How do I formulate a cell for date entry and another cell will show the sum of last 3 days including date not shown and date entered? E.g. If I enter date 4/6/09, result should be 17:10 hrs; 4/11/09, result should be 7:00.
View 9 Replies
View Related
May 6, 2009
Is there a way to enter a colon into a standard number to create a value that can be formatted into a 24 hour time value? eg a time is listed as 1345 with a general number format, and I want it returned as 13:45 witha custom format of hh:mm. Other than creating a table and using a vlookup function
View 3 Replies
View Related
Apr 27, 2014
Formula to calculate time allotted minus time used and show the difference in hour and minute.
View 1 Replies
View Related
Sep 18, 2009
Unsurprisingly I have a spreadsheet:
Column D contains the total hours that a component has been installed for
Column C contains the additional hours the component acquired
I need the total of these 2 sets of time added together to give me the new hours that the component has acquired. All cells have been formatted [h]:mm:ss
I attach an extract of the spreadsheet. At the moment the values in column D are all calculated manually. When I add the values together Excel returns #Value!
The annoying thing is that in cells B2 and A3 I tested this and can do this with no problem...the value in B3 is the sum of B2 and A3.
View 2 Replies
View Related
Dec 8, 2012
In block K5 I have the value 16. In block L5 I would like to turn that value into 16:58. How would I do this?
View 5 Replies
View Related
Jun 12, 2006
i don't know why this one stumps me but it does. I have a production schedule which shows how many hours and minutes are remaining for a given production run, i.e. 6.4 or 3.2. i want to do two things with these values. 1) add the 6.4 to the current time, something like a1 + now(0) to get the time the production run should end.
and
2) i want to add the number of minutes from a calculation to the current time, ie. 10:14 AM + 122 minutes = actual time the production ends. Nothing i do seems to give a desired result - including formatting the cell to any variation of the time format - including custom.
View 2 Replies
View Related
Mar 15, 2012
Is there a function or a macro to calculate number of hours worked from a single cell value.
For example, cell A1 has "1600 - 1715" and need it to convert to "1.25" on cell B1
View 6 Replies
View Related
Feb 6, 2008
i have a timesheet that we are trying to use. the problem is the column that says shift diff. if an employee works after 6:30pm for 1and 1/2hr, he is entitled to shift hours. shift hours is between 6m and 8am.
As long as he works after 6.30pm but works for at least one and a half hour, he will get the shift.
if work, 9am to 7:30pm, and have break between 2-3pm, should have 1.5hrs shift and 9.5hrs total
if work, 7:45pm-9:45pm, and have break between 8:30-9pm, total hrs work is 1.5 and shift hrs s/b 1.5hrs
if work 3pm to 12am and have break between 7-8pm, total hrs work is 8 and shift hrs s/b 5hrs
View 9 Replies
View Related
Mar 4, 2008
I am trying to do a timesheet spreadsheets that lists employees clockin and clockout times
Name Start End num hours worked
Cory 02:00 04:00 2
Jack 23:00 05:00 6
Fred 10:00 17:00 7
and then go through the list and and count the number of employees in a certain range.
time range number of employees working
05:00-06:00 1
06:00-07:00 2
07:00-08:00 6
08:00-09:00 5
09:00-10:00
10:00-11:00
11:00-12:00
12:00-13:00..............
View 4 Replies
View Related
Nov 13, 2006
I am trying to add duration time for song files. 4 minutes and 32 seconds + 3 minutes 45 seconds, etc. etc. to get total hours and then to total to days. The range of cells is over 5,000 and I am trying to find out how long a playlist will play.
View 9 Replies
View Related
Sep 25, 2013
I'm trying to create a time sheet to calculate how many hours worked in a week, Once it reaches 40 hours, The excess over 40 hours goes into a "overtime" cell. The "40" hours remain in the regular hours cell.
Attachment 267704
View 14 Replies
View Related
Sep 17, 2012
Any way to calculate the total hours staff work based on the mininum time of the first transaction to the maximum time of the transactions. I used a DMIN and DMAX function to get those times per employee. The issue is then the time goes over from one day to the next, such as from 11 PM to 4 AM the next day. As you can see in the data below,the fourth record shows the minimum time as 12 AM and the max as 11 PM with total time worked as 23 hours. In this example, the total hours worked should be five hours.
min time
max time
total hours
7:00 AM
16:00
9:00
[Code] .......
View 4 Replies
View Related
Aug 4, 2013
My overtime pays is anything exceed over 8 hours per day or over 40 hours per week. Right now I can only calculate overtime by either over 8 hr/day or over 40 hr/ week. I need a way to combine both.
View 9 Replies
View Related
Aug 6, 2007
If a Rescue Officer is called out at 23:00 and is back at 04:00, this should equate to 5 hours worked.
It seems that if my times are all on one side or the other of a 24 hour cycle, my calculation work fine but it it breaks across the 24 hour (as above, it doesn't work.
A2=04:00
A1=23:00
Using (A2-A1)*24 give me -19.00 hours
My SS macro has a line:
s = (wks.Cells(c, 3) - wks.Cells(c, 2)) * 24 'calculates the duration of time worked
Is there any way of getting excel to calculate an elapsed time in hours when the start and end times roll over from one day to the next?
View 9 Replies
View Related
Apr 18, 2006
I am trying to calculate earnings based upon hours worked based on 24 hours format (time out - time in = time worked) multiplied by hourly rate. I cannot get the proper calculation. How can I attach a copy of the Excel worksheet?
View 9 Replies
View Related
Aug 15, 2007
I need to create a formula to calculate monthly hours worked (144.20) by hourly rate (£14.25). So far everything ive tried has given me awrong answer. I cant seem to make the total right. From what ive come up with (Not good) the total accepts the hours-just not the minutes.
View 8 Replies
View Related
Feb 16, 2012
I charge one rate for day work and one for night shifts. My spreadsheet is set to figure the total number of hours worked and I know how to multiply by dollars to get answer #1, but is it possible to use a formula to multiply times a different rate for a night shift?
For example I use =IF(B2
View 9 Replies
View Related
Oct 15, 2007
I have a timesheet where user updates start and end time for various tasks.
I have placed a time capture button in the excel sheet (which is simply a macro saying =now() function)
The user clicks it before starting and after finishing the task. The start and end times are captured in adjacent cells.
If the user starts the work, and goes on a lunch break say for 20 min, comes back finishes the task and captures end time, the time difference will not consider break time which is non productive.
How can I incorporate something like 'pause' option so that before he goes for lunch he can temporarily pause the time.
View 9 Replies
View Related
Feb 19, 2009
Is it possible that a cell contains both numeric and alphanumeric data and to do calculations on that?
For example: if a cell conatain the value "10a" or "8.5b" etc. Would it be possible to have a column that gives me the hours worked (the numeric value in the cell) and a line that gives me the amount of people that are working on shift "a" (the alphanumeric value in the cell).
Is this at all possible? Or does that require VBA/Macros and stuff (in which case this is posted in the wrong part of the forum )
View 5 Replies
View Related
Dec 15, 2013
I'm attempting to make a simple time sheet for a handful of employees. I'd like to enter the clock in time and clock out time for each day. The end cell should be the running total for the week. The tricky part for me is having the formula subtract an hour for each day that is over 5 hours.
View 3 Replies
View Related
Mar 30, 2012
I need to create a formula that assumes 40 hours = 1 FTE (full time employee). As an example if I have a total of 100 hrs I need to know how many employees to hire. So in this case it would be 2.5.
View 1 Replies
View Related
Feb 6, 2007
I'm working with a spreadsheet that works out how many hours someone has worked on a given shift.
In cell C4 I have the formula =E4-D4+IF(D4>E4,1)
In cells D4 & D5 I have an entered number in time format (custom hh:mm)
The problem with this is that when a time is entered in either D4 or E4 it automatically gives me a number of hours worked (upto midnight) without any input in the other.
Aim: Not to show the number of hours worked in cell C4 until hours in both cells D4 & E4 have been entered. NB. Sometimes the start times are 20:00 until 08:00 (night shift) hence answer 10:00.
View 9 Replies
View Related
Sep 19, 2013
I have an issue with identifying start-stop times for special school bell schedule. Cell B2 is contains start time (7:50 AM) and D1 is the establish variable for class length (in this case 45 minutes). Passing time is constant (5 minutes), but needs to be added to the day schedule with the start of each class. I attempted to convert these value to minutes with no luck, same goes to formatting cells.
Hour
Start
End
Class Length
Passing Time
[Code]...
View 1 Replies
View Related