Subtract Start Time From Finish Time Return Hours Worked As Number
May 5, 2006
I have a user form with textBox1 = start time (entered as "[h]:mm") and text Box2 = finish time (entered as "[h]:mm"). I would like textBox3 to display the difference between the start time and finish time as a general number!
For example
Start time: 21:00
Finish time: 06:30
Hours worked: 9.50
I have a workbook that is generated from the system(AS400)but it wont subtract the time finish -time start. I get a #Value error in the cells I tried two different formulas.
I am working on an excel spreadsheet for work and I have to show a chart that shows the time of day a space is in use. Right now I am having to mark all of these by hand which takes me forever because I have a couple thousand lines of information.
I need to mark the hours in use based off the start and finish time.
For Example: 1) If the start time was 7:00 and the end time was 10:45 then the markers would only mark 7am and 10am 2) If the start time was 7:15 and the end time was 10:00 then the markers would only mark 7am and 9am 3) If the start time was 7:30 and the end time was 10:30 then the markers would only mark 7am and 10am 4) If the start time was 7:45 and the end time was 10:15 then the markers would only mark 8am and 9am
I was given the formula and it works to count the whole hour but now I need the formula tweaked and I don't know how...I need the formula to account for quarterly hours...and I don't know how to fix it.
Attached is an example of the spreadsheet of what I currently have and of what I need. Book1.xlsx
I can calculate total hours when a user enters a start date/time and a finish date/time. The kick is I only want to include hours from 2:00 PM to 12:00 AM (10 hour period). So assuming all the start and end times will be in this range, how can i calculate work hours over multiple days? For example: Start date/time = 2/26/13 2:30 PM and end date/time = 2/28/13 10:30 PM. I want my calculated hours to show 28 hours.
I have a timesheet where user updates start and end time for various tasks.
I have placed a time capture button in the excel sheet (which is simply a macro saying =now() function)
The user clicks it before starting and after finishing the task. The start and end times are captured in adjacent cells.
If the user starts the work, and goes on a lunch break say for 20 min, comes back finishes the task and captures end time, the time difference will not consider break time which is non productive.
How can I incorporate something like 'pause' option so that before he goes for lunch he can temporarily pause the time.
Is it possible that a cell contains both numeric and alphanumeric data and to do calculations on that? For example: if a cell conatain the value "10a" or "8.5b" etc. Would it be possible to have a column that gives me the hours worked (the numeric value in the cell) and a line that gives me the amount of people that are working on shift "a" (the alphanumeric value in the cell).
Is this at all possible? Or does that require VBA/Macros and stuff (in which case this is posted in the wrong part of the forum )
Can I calculate the number of working hours between these two using a formula? So if I have a 10 hour working day (08:00-18:00), Mon-Fri and the two Dates/Times can I calculate the number of working hours?
I am trying to get the start time and finish time for breaks.
I have 4 columns Name, status, start, finish. In the name column there are multiple names, under status there 6 different status's. and under the time columns there are in and out times dependant on status. I am trying to us index match match. I have tried vlookup and hlookup as a nested function. I keep getting errors.
NameStatus MessageStart TimeFinish Time Cameron WilliamsTech All & Billing12:31:4812:31:52 =index(starttime,match(name,namefield(match,"on lunch",starttime)))
I need to calculate the time elapsed between start and finish dates. I've figured the TODAY function, as explained here but I'm referring solely to dates in cells. How to?
i have a timesheet that we are trying to use. the problem is the column that says shift diff. if an employee works after 6:30pm for 1and 1/2hr, he is entitled to shift hours. shift hours is between 6m and 8am.
As long as he works after 6.30pm but works for at least one and a half hour, he will get the shift.
if work, 9am to 7:30pm, and have break between 2-3pm, should have 1.5hrs shift and 9.5hrs total if work, 7:45pm-9:45pm, and have break between 8:30-9pm, total hrs work is 1.5 and shift hrs s/b 1.5hrs if work 3pm to 12am and have break between 7-8pm, total hrs work is 8 and shift hrs s/b 5hrs
I'm trying to create a time sheet to calculate how many hours worked in a week, Once it reaches 40 hours, The excess over 40 hours goes into a "overtime" cell. The "40" hours remain in the regular hours cell.
Any way to calculate the total hours staff work based on the mininum time of the first transaction to the maximum time of the transactions. I used a DMIN and DMAX function to get those times per employee. The issue is then the time goes over from one day to the next, such as from 11 PM to 4 AM the next day. As you can see in the data below,the fourth record shows the minimum time as 12 AM and the max as 11 PM with total time worked as 23 hours. In this example, the total hours worked should be five hours.
My overtime pays is anything exceed over 8 hours per day or over 40 hours per week. Right now I can only calculate overtime by either over 8 hr/day or over 40 hr/ week. I need a way to combine both.
If a Rescue Officer is called out at 23:00 and is back at 04:00, this should equate to 5 hours worked.
It seems that if my times are all on one side or the other of a 24 hour cycle, my calculation work fine but it it breaks across the 24 hour (as above, it doesn't work.
A2=04:00 A1=23:00
Using (A2-A1)*24 give me -19.00 hours
My SS macro has a line:
s = (wks.Cells(c, 3) - wks.Cells(c, 2)) * 24 'calculates the duration of time worked
Is there any way of getting excel to calculate an elapsed time in hours when the start and end times roll over from one day to the next?
I charge one rate for day work and one for night shifts. My spreadsheet is set to figure the total number of hours worked and I know how to multiply by dollars to get answer #1, but is it possible to use a formula to multiply times a different rate for a night shift?
I am trying to provide a tool for department leaders to monitor productivity for order processing in their departments. The variables I have are: Number of orders(variable), number of pickers (variable), start time(variable). Then, I know each order takes 1 picker 4 minutes to pick on average, and there are 45 minutes worth of breaks during the picking process. So after entering the variables I used =(((C3*4)/60)/D3) to come up with the time needed to process the orders. What I can't get to is how to add this number to the start time, factor in break minutes and get to the projected completion time. I have Excel 2003 at work. Clearly I need to take a class!
Assuming that a workday is from 8:30am to 5:00pm. (also need to not calcualte Saturday and Sunday but this example doesn't show it).
Wednesday, 7/18/07 at 4:00pm (minus) Friday, 7/20/07 at 9:00am (should equal) 10 hours or 1 day, 1 hour and 30 minutes.
Basically what I want to do it determine how much work time has elapsed from the time a message was left on voicemail to the time that someone picks that message up. We only want to assume that a message can be retrieved duruing business hours but a message can be left at anytime!
I’m working on a timesheet and I need to separate the hours worked that are before 6 am from all the others. For example if someone works 1:00 am to 8:00 am I need a cell to populated with 5 representing the hours worked before 6 am. The formula below works fine except when the start time is 12:00 am. I am also having trouble if the start time is before midnight like in a 11pm to 5 am shift.
Is it possible to calculate hours if both the start and end time are in the same cell. Unfortunatly the developers of our scheduling program developed it so when you export the schedule to excel it shows Greg in A1 and 3:00pm-9:00pm in A2. I would like to have excel calculate the 6 hours so I can use it to auto generate another spread sheet I am making.
We have a person who work in 24/7 support. One person work passive 24 hour, but it 24 hours are divided in to next shifts: normal 06-18, over hours 18-22, night hours 22-06.So if we have some one who is supporting client say from 17h till 23h, we have next results:
Name Start time End Time 06:00 - 18:00 18:00 - 22:00 22:00 - 06:00
John 17:00 23:00 1:00 4:00 1:00
Is it possible to in time range enter formula who subtracted end time from start time, but taking into account 24 hours?
I am trying to add/subtract dates and times to return one sum; but I only want to count the work week (5 days M-F) and work day (8 hrs.) 8am- 4pm. This is to compute the actual turn around time for a certain process.
i.e.: Date ReceivedTime ReceivedDate ApprovedTime Approved10/1/20081:00 PM10/15/20089:00 AM
The total hours this process should equate to is: 9days and 6hours.
It's been several years sine I had to look at calculating amount of time worked. Can you please look at this old spreadsheet of mine and verify that the formula is correct?
It appears to be ok to me, but I don't want any errors when it comes to paying my employees
I have a worksheet which contains START TIME in column A, then TIME USAGE in column B and END TIME in column C. User enters start time, followed by the number of time usage in minutes, how could i possibly display the end time automatically in this scenario? how do you add the entered time usage to the start time to display the end time? Say if I enter 1:00 AM at start time and 00:15 minutes on time usage, how can 1:15 AM be displayed on the end time automatically?
I need to be able to calculate the actual number of days worked for an employee over a specific date range. I have a data sheet containing employee, transactions, and date of transaction (date only, does not include time). The actual number of days worked may fluctuate due to time off or holidays, so I need to be able to calculate this individually by employee. For example, with columns Employee, Transaction, & Transaction Date:
I import via copy paste into excel from a timekeeping programme the following time I have worked each day, as an example:
Mon 7h 55m Tues 6h 30m Wed 7h 24m etc
Is there a method of changing this in excel to work out the number of minutes I have worked each day? The timekeeping programme does not let me alter any parameters, so h & m is what I have.