Stop Count Of Days When Date Is Entered On Specific Cell - Excel

Mar 17, 2014

excel.jpg

how to make my network days stop counting when I insert a value in the completed column (in this case H3). I have a Date Received column (A3), a due day column (G3) and the last column with the date (N3). My remaining days column keeps counting after I filled the completed cell (H3) and won't stop counting after. I need a formula to stop after the completed cell is fill up.

View 5 Replies


ADVERTISEMENT

Stop Calendar Count Down When Date Within That Month Entered In New Cell

May 27, 2014

I have attached a copy of a spreadsheet that I am putting together, What I need to achieve is, when a date is entered into the completion date cell the daily count down in the days left cell stops but still shows the value in that cell. The Annual or Monthly cal tabs are the ones i need the formula for.

View 5 Replies View Related

Excel 2007 :: Count Number Of Days Between Two Date Where Off Days Are Friday / Saturday And Holiday

Mar 14, 2014

I am making process TAT(Turn Around Time) which required following information. In Excel 2007.

1-Count number of days between two dates where working days are (Sun to Thursday). So required to exclude (Friday,Sat + Holidays)

A1-Start Date Mar/01/2014
B1-End Date Mar/31/2014
C1-No Of Days 22
D1-Days between two dates 21
E1 To E10-Holidays

2-Count number of days between two dates where working days are (Sat to Thursday). So required to exclude (Friday + Holidays)

A1-Start Date Mar/01/2014
B1-End Date Mar/31/2014
C1-No Of Days 27
D1-Days between two dates 26
E1 To E10-Holidays

Note : Any weekend (off days) dates listed in holidays should not effect the query.

View 9 Replies View Related

Calculate The Number Of Days From A Date Entered Into Cell A1 To Today's Date

May 19, 2009

I need a formula that will calculate the number of days from a date entered into cell A1 to today's date. Whether it's before or after todays date. Example:

5/10/2009 to today is -9

5/22/2009 to today is 3

View 2 Replies View Related

Calculate End Date Using Start Date And Number Of Days Excluding Specific Days

Nov 22, 2013

I want to calculate the end date of my German courses. This is how it works:

A course consists of 60 LU*. The course can occur i. e. three times a week: Monday, Wednesday and Friday. In each day the course lasts 2 LU, which means 6 LU each week. There is no course on Tuesday, Thursday, Saturday, Sunday and on holidays. Therefore this type of course that begins on 18-Nov-2013 will end on 03-Feb-2014.

Another course which occurs Tuesday, Thursday and Saturday, and respectively has 2 LU on Tuesday, 2 LU on Thursday and 3 LU on Saturday and starts on 03-Dec-2013 will end on 06-Feb-2014.

Therefore I want to create a worksheet where I set the start date, choose the days and respectively the LU amount on those days. The end date shall be calculated according to these criteria.

The workday function on excel cannot do this and I do not have any programming skills to work with VBA.

Legend:
*LU = lesson units; 1 LU is 45 minutes

Holidays:
28-Nov-13
29-Nov-13
08-Dec-13
09-Dec-13
25-Dec-13
31-Dec-13
01-Jan-14

[Code] ...........

View 7 Replies View Related

When A Date Entered On A Specific Cell, Automatically Enter A Text In Other Cell

Jul 10, 2006

I have 6 Headings in excel named...

"A" in cell A1, B in B1, "C" in C1, "D" in D1, "E" in E1 and "F" in F1.

There are two projects.

Project 1 has phase A, D & F and Project 2 has phase A, B, C, D & E.

My Specification follows...

1). Take Prject 1 - Which starts from A...in cell A2 I will keyin "A". When the phase comes to an end I will key in the end date of the phase. As soon as I key in the end date in cell A2 Letter D should automatically appear in the cell D2 and when Phase D comes to an end I will key in the end date in Cell D2 which should automatically keyin F in the cell F2. and is the same case for Project 2.

View 3 Replies View Related

Count How Many Days Coming Due Within 90 Days Of Each Date Based On Today Function

May 27, 2012

There are dates in column C and I need to count how many days are coming due within 90 days of each date based on the today() function but do not exceed the 90 days.

Countif Today()+90

View 5 Replies View Related

Adding Last 3 Days Hours Worked When A Date Is Entered

May 24, 2009

A B
1 4/1/09 12:15
2 4/2/09 10:00
3 4/4/09 8:10
4 4/6/09 9:00
5 4/8/09 5:00
6 4/11/09 7:00

I need to add up hours worked of last 3 days including current day. The date column does not contain everyday's date. How do I formulate a cell for date entry and another cell will show the sum of last 3 days including date not shown and date entered? E.g. If I enter date 4/6/09, result should be 17:10 hrs; 4/11/09, result should be 7:00.

View 9 Replies View Related

Excel 2013 :: Date Placed In Cell When Text Entered In A2

May 8, 2013

Is there a formula which places the date In A5 whenever text is entered in A2 - Excel 2013

View 9 Replies View Related

Excel 2003 :: Cell Value To Change If Date Is Entered In Different Cell?

Feb 21, 2014

I am using Excel 2003 at work.

New cases are entered on to the spreadsheet. The case remains open until a closure date is entered, at which point the case is closed. What I need is the following:

Cell A3 = should say "Open" if there is no value in cell Y3
Cell A3 = should say "Closed" if a date or any value is entered in cell Y3. Ideally it should only say "Closed" if a date is entered in format xx/xx/xx, but am flexible so that it says "Closed" if any data is input.

At the moment Cell A1 has a drop down list consisting of open and closed. I will remove this if it causes complication.

View 5 Replies View Related

Count Of Location Wise "NE" (Not Entered) Status Total For All The Days From 1 To 14

Nov 18, 2008

I want the count of location wise "NE" (Not Entered) Status total for all the days from 1 to 14

for more details see the attached file

View 6 Replies View Related

Count Days In Specific Year Between Two Dates

Jan 22, 2008

I want to be able to count the number of days in a specific year between two dates.

Suggested formula input: DaysInYear(Date1,Date2,Year)

Examples:

DaysInYear(3/3/2005,3/3/2006,2006) should return 62 (31 in Jan, 28 in Feb and 3 in Mar.)

DaysInYear(3/3/2005,3/3/2007,2006) should return 365

View 4 Replies View Related

Macro To Copy Specific Cells From Row From Source & Stop When Next Row Cell = Specific Value

Nov 7, 2008

I have a protected template and unprotected source worksheets - - - what I would like to happen is for the macro to start and if the source worksheet cell B3 equals "Report Total" then stop - otherwise copy template worksheet then copy 6 specific cells from the source to paste values to specific cells on the newly created worksheet (B_ to C7, D_ to I7, E_ to C9, F_ to K9, A_ to C11, M_ to K11 and then K13=F13-30)

After that then start all over again unless the next row’s cell (B4, B5, B6, . . .) is "Report Total" then stop - - - the row count could be from one to a couple hundred.

Here is what I have so far but I know that with each copy the name will change and as it goes down the source file each row will change and I also need help with that.

Sheets("ee template").Copy After:=Sheets(3)
ActiveSheet.Unprotect
Selection.ClearContents
Range("I7").Select
Selection.ClearContents
Range("C7").Select
Sheets("source").Select
ActiveCell.Offset(0, -11).Range("A1").Select

View 9 Replies View Related

Add Days To A Specific Date

Jul 11, 2007

A1=10 July 2007
A2=12 (number of days)
A3=21 July 2007

I need a formula in A3 that will basically add the number of days in A2 to the given date in A1.

Note: Don't know how would this work with 30 and/or 31 days months??

View 9 Replies View Related

VBA Less Than Specific Date But No Greater Than 28 Days

Jun 19, 2014

I'm using the code below to extract information from a 'Source' (Remaining Allocation Data) to a 'Destination' (All CTO Expired Assignments) sheet.

[Code] ......

The code works except for this part of the script

[Code] ....

What I'm trying to do is as follows:

Extract records where the FinDate is less than the CurrentDate, (i.e. 19/06/2014) and,

Is equal to and no greater than 28 days prior to the Current Date (i.e 22/05/14)

I've tried all sorts of formulas to try and get this to work including the 'DateAdd' function, but I've so far been unsuccessful.

View 2 Replies View Related

Add X Days To Date Excluding Specific Day

May 18, 2008

the formula below prints monday to friday when i drag it down. Probably a very easy question but how would i change it so when i drag it down it includes saturdays so the only date missed out is Sunday.

It picks the date from cell a4. the code is from here: http://www.cpearson.com/excel/DateTimeWS.htm

=IF(WEEKDAY(A4)=7,A4+2,IF(WEEKDAY(A4)=6,A4+3,A4+1))

View 4 Replies View Related

Days Count From Specified Date

Jan 14, 2007

The union has instated a new policy here and new hires now have a 120 working day probationary period. That comes out to about 6 months. ( 168 days minus the 48 days off) . what I’m looking for is a formula that will calculate each date that has passed as one starting at a –48 … also adding in to the equation that every day sick counts against that 120 and everyday of OT counts as positive brining them closer to the 120 they need.

I can figure out the math part of adding and subtracting the days. But what I can’t figure out is how do I get it to read each date as one starting from the date in cell b3

Example cell b3 has 9/25/06 cell b4 has 3/12/07 all the days that have passed count as one.

The total starts as a –48( due to the days off) with the verabial, d8 is a negative and d9 is a positive. To be added in to the total.

View 5 Replies View Related

How To Create Formula To Add 30 Days Out From Specific Date

Sep 15, 2009

I am creating a tracking spreadsheet and I will need to f/u on a process 30/60/90 days out from a particular date. Example: CPAP Therapy began 1/22/09 and I need to follow-up by 2/22/09. How do I create formula to add 30/60 or 90 days out from the setup date?

View 6 Replies View Related

Calculate Specific Days Within Specified Date Range?

Jan 20, 2013

I have a form with grouped check boxes for each day of the week, and start date and end date from the Microsoft Date and Time picker control. I want to know the total days within the date range based on check boxes. For example, Tuesday and Thursday are checked off. The start date is December 1, 2012 and end date is January 31, 2013. What is the total number of Tuesdays and Thursays in that two month date range.

View 2 Replies View Related

Excel 2003 :: Date Formula For If Given Date Is Before Or After Today Or If Nothing Entered

Jan 17, 2013

Cell B1 contains a date, then B2 contains a formula that says:

=IF(A1>TODAY(),A1,A2)

A1 contains a green tick and A2 contains a red cross.

What I am trying to add is that if B1 contains no date then B2 needs to be blank.

I tried using =IF((A1="",0),(A1>TODAY(),A1,A2) to get it to show a 0 if there was no data but this doesn't work.

I am using Excel 2003.

View 4 Replies View Related

How To Find Business Day Specific Number Of Days From Date

Oct 8, 2013

I have a spreadsheet that contains dates in format mm/dd/yyyy. Lets call this Column C(Paydate). In Column A I have a date that needs to be a 2 business days before the paydate. If this date in column A winds up being a Saturday or Sunday, the function needs to return the previous Friday. If the date is any weekday then it should return that weekday

For example:
C1 = 10/18/2013(a Friday) then A1=10/16/2013
C2 = 10/14/2013(a Monday) then A2= 10/11/2013(the previous Friday since 2 days before 10/14/2013 is a Saturday)
C3 = 10/15/2013(a Tuesday) then A3= 10/11/2013(the previous Friday since 2 days before 10/15/2013 is a Sunday)

View 4 Replies View Related

Determine A Specific Date Based On A Number Of Business Days?

Feb 11, 2010

I'm documenting the steps of a process with each step accounting for a specific amount of business days. How do I determine the specific business day based on the number of days it takes to complete a process? For example: Start date then 45 business days from that date the next step begins...then 3 business days from that date the following step begins and so on.

View 5 Replies View Related

Countif To Count If Falls With In 90 Days Of Todays Date

Oct 29, 2009

What i have is a list of dates in a row. I want to set up a countif formula to count the number of date that fall with in 90 days of todays date. I'm planning on placing todays date in a cell in the upper left hand corner (cell A2) above the list of dates. This way i can just type in todays date and the spreedsheet will count the number of dates, in the list, that fall with in 90 days of the date i type into cell A2

View 2 Replies View Related

Find Count Of Days Within Another (separate) Date Range

Mar 20, 2014

I am assessing the impact of product price increases on volume (qty) and sales (£/$).

The prices are changed sporadically and at no set intervals. For example pries were changed on the 15th Jan and 13th Feb this year.

We have set reporting dates (calender months) so i am hoping to be able to divide the report which shows sales & qty's during the 15th Jan - 13th Feb segment and apportion them to the correct months.

I have the start & end dates of the calender months in cells A4:B18 and each time a new report is run (ie 15th Jan or 13th Feb, these dates go across the top i.e. cell C3 = 15th jan & D3 = 13th Feb.

I would like to return a % in cell C4 which relates to the amount of total days in the segment that relate to Jan (ie. 29 days in the segment, 16 relate to Jan so 55.2%).

Cell C5 would then return a % which relates to the amount of total days in the segment that relate to Feb (29 days in the segment, 13 relate to Feb so 44.8%).

Cells D4&D5 would return the next reporting segment and how many days in Jan/Feb respectively (the answer will be 0 but a constant formula acrosss all would be perfect. tried to give as much info as poss.

View 2 Replies View Related

Date Formula- To Count The Number Of Days Between 2 Dates

Aug 4, 2008

I have been using a formula to count the number of days between 2 dates and if the date was older than 12 months it would work fine.

The data that i was using has been changed and they have decided to change the format of the dates and dropped the year reference no all i have to work with is dates like 27-07 this represents 27th July i can format this date to work fine unless the date falls before 1 jan this year all i get is lots of numbers and it stuffs up the whole calculation.

The formula i am using to compare the dates is

=DATEDIF(N31,$D$1,"d")

View 9 Replies View Related

Excel 2010 :: Count Days Between Last Two Occurrences Of Value In Row?

Nov 9, 2012

I have a spreadsheet with 6 months of data in one row. the dates are from A3 (Jan 1) to FY3 (Jun 30). The data is in range A4:FY4. The data is a "$" (without quotes). The $'s are entered randomly during the 6 month period. I need a formula to determine the days between the last occurrence and the next to last occurrence of the $. Example spreadsheet shows the $'s on Mar 28 and May 5 as the last two. The spreadsheet is attached. I am using Microsoft Office Excel 2010.

View 6 Replies View Related

Formula To Count Number Of Days In Date Range - Split Per Month

Jan 23, 2012

I have a large spreadsheet which holds lots of data with date ranges that i need to performs different actions to. Any way to identify the number of days, per calender month, that falls in a date range.

sample data...

Start Date
End Date
Old Value
New Value

08/03/2010
18/06/2010
16758.2
16758.1

[Code] .......

I need to break down the total number of days per month

Jan
Feb
Mar
Apr
May
Jun
Jul
Aug
Sep
Oct
Nov
Dec

24
30
31
18

[Code] ......

As you can see this also laps into a new year, which poses my next problem, ill probably just add more columns on to the end of the table for that though...

I will later apply different calculations to these cells but in short need to get a calculation for the number of days per month first.

(in short spreading the new value out accross the year then multiplying it by the days... i also need to apply a further daily volume cal to it).

View 8 Replies View Related

Excel 2007 :: Auto-update Date In Specific Cell?

Oct 18, 2011

i want to insert the last date written in a cell into a specific cell automatically,

1- Date column is D containing dates from starting of the month

2- A1 is cell in which last date from column D should automatically be inserted.

automatically copy the last entered date in column D and pastes it to cell A1,

View 4 Replies View Related

Formula That Will Determine The Number Of Days That Fall In A Specific Month Based On A Date Range

Jul 31, 2009

I'm needing a formula that will determine the number of days that fall in a specific month based on a date range. For example, if I have a date range of 10/15/2009 to 01/13/2009, I need the formula to determine the number of days in each month within the range (October has 15 days in the date range; November has 30, December has 31, and January has 13.) I have a large spreadsheet that would be so much easier to manage with such a formula. Currently, my spreadsheet is setup as follows. I need the forumla automatically fill in the number of days under each month.

Stard Date End Date Oct-09 Nov-09 Jan-10 Feb-10
10/15/2009 01/13/2009

I'm using Excel 2007.

View 9 Replies View Related

Image Is Hyperlinked To A Cell With Specific Text Entered

Mar 18, 2008

Is there any way I can make it so an image is hyperlinked to a cell with specific text entered. After clicking on the image, the cell where the image is hyperlinked to changes text.

For example:

An image of a strawberry is hyperlinked to a cell which contains the word "strawberry".
After clicking on the strawberry image, the cell which contained the word "strawberry" now contains the word "strawberry1".

If you understand that, I would so love the help.

I also posted this is question here

http://www.excelforum.com/showthread.php?t=637811

View 11 Replies View Related