Mark The Hours On A Start And Finish Time

Mar 25, 2014

I am working on an excel spreadsheet for work and I have to show a chart that shows the time of day a space is in use. Right now I am having to mark all of these by hand which takes me forever because I have a couple thousand lines of information.

I need to mark the hours in use based off the start and finish time.

For Example:
1) If the start time was 7:00 and the end time was 10:45 then the markers would only mark 7am and 10am
2) If the start time was 7:15 and the end time was 10:00 then the markers would only mark 7am and 9am
3) If the start time was 7:30 and the end time was 10:30 then the markers would only mark 7am and 10am
4) If the start time was 7:45 and the end time was 10:15 then the markers would only mark 8am and 9am

I was given the formula and it works to count the whole hour but now I need the formula tweaked and I don't know how...I need the formula to account for quarterly hours...and I don't know how to fix it.

Attached is an example of the spreadsheet of what I currently have and of what I need. Book1.xlsx

View 2 Replies


ADVERTISEMENT

Subtract Start Time From Finish Time Return Hours Worked As Number

May 5, 2006

I have a user form with textBox1 = start time (entered as "[h]:mm") and text Box2 = finish time (entered as "[h]:mm"). I would like textBox3 to display the difference between the start time and finish time as a general number!

For example
Start time: 21:00
Finish time: 06:30
Hours worked: 9.50

Start time: 12:30
Finish time: 23:00
Hours worked: 10.50

View 9 Replies View Related

How To Calculate Work Hours From Only A Start And Finish Date And Time

Feb 28, 2013

I can calculate total hours when a user enters a start date/time and a finish date/time. The kick is I only want to include hours from 2:00 PM to 12:00 AM (10 hour period). So assuming all the start and end times will be in this range, how can i calculate work hours over multiple days? For example: Start date/time = 2/26/13 2:30 PM and end date/time = 2/28/13 10:30 PM. I want my calculated hours to show 28 hours.

View 1 Replies View Related

Number Of Working Hours Between 2 Dates Including Start And Finish Times

Mar 22, 2007

I have 2 dates+ times.

1 the contract start date and time.

2 the contract end date and time.

Can I calculate the number of working hours between these two using a formula?
So if I have a 10 hour working day (08:00-18:00), Mon-Fri and the two Dates/Times can I calculate the number of working hours?

Example
Start 06-Mar-07 10:00
End 14-Mar-07 14:00

This is 2 part days and over a weekend.

View 9 Replies View Related

Get Start And Finish Time For Breaks / Lunch?

Apr 15, 2014

I am trying to get the start time and finish time for breaks.

I have 4 columns Name, status, start, finish. In the name column there are multiple names, under status there 6 different status's. and under the time columns there are in and out times dependant on status. I am trying to us index match match. I have tried vlookup and hlookup as a nested function. I keep getting errors.

NameStatus MessageStart TimeFinish Time
Cameron WilliamsTech All & Billing12:31:4812:31:52
=index(starttime,match(name,namefield(match,"on lunch",starttime)))

[Code]......

View 1 Replies View Related

Calculate Time Elapsed Between Start And Finish Dates

Dec 13, 2013

test.xlsx

I need to calculate the time elapsed between start and finish dates. I've figured the TODAY function, as explained here but I'm referring solely to dates in cells. How to?

View 1 Replies View Related

Subtract The Time Finish & Time Start

Sep 25, 2009

I have a workbook that is generated from the system(AS400)but it wont subtract the time finish -time start. I get a #Value error in the cells I tried two different formulas.

View 2 Replies View Related

Calculate Start Date From Finish Date Minus 14 Working Hours

May 7, 2014

I needs a formula (not VBA) to calculate the required start date.

I have to do a job of 14 working hours and this job must be finished on 05-may-2014 13:00

My working week is from monday u/i friday and every day I work from 08:00-16:00

At what time do I have to start the job to get it done in time.

The formula should give this result: 01-may-2014 15:00

View 3 Replies View Related

Calculating Hours With Midnight As A Start Time

Oct 1, 2009

I’m working on a timesheet and I need to separate the hours worked that are before 6 am from all the others. For example if someone works 1:00 am to 8:00 am I need a cell to populated with 5 representing the hours worked before 6 am. The formula below works fine except when the start time is 12:00 am. I am also having trouble if the start time is before midnight like in a 11pm to 5 am shift.

=(IF(AND(S3<=$AG$97,S3>=$AG$73),(($AG$97-S3))*24,0))

S3 is the start time

AG97 is 6:00 am

AG73 is 12:00 am

View 4 Replies View Related

Calculate Hours If Both The Start And End Time Are In The Same Cell

Feb 27, 2010

Is it possible to calculate hours if both the start and end time are in the same cell. Unfortunatly the developers of our scheduling program developed it so when you export the schedule to excel it shows Greg in A1 and 3:00pm-9:00pm in A2. I would like to have excel calculate the 6 hours so I can use it to auto generate another spread sheet I am making.

View 10 Replies View Related

Calculating Start / End Time Between Night Shifts 24 Hours?

Dec 26, 2013

We have a person who work in 24/7 support. One person work passive 24 hour, but it 24 hours are divided in to next shifts: normal 06-18, over hours 18-22, night hours 22-06.So if we have some one who is supporting client say from 17h till 23h, we have next results:

Name Start time End Time 06:00 - 18:00 18:00 - 22:00 22:00 - 06:00

John 17:00 23:00 1:00 4:00 1:00

Is it possible to in time range enter formula who subtracted end time from start time, but taking into account 24 hours?

View 9 Replies View Related

Return Start And Finish Date?

May 25, 2014

I am trying to return start and finish date of events depending on when resources are allocated.

View 4 Replies View Related

Start/Stop Timer For Hours Worked To Include Break Time

Oct 15, 2007

I have a timesheet where user updates start and end time for various tasks.

I have placed a time capture button in the excel sheet (which is simply a macro saying =now() function)

The user clicks it before starting and after finishing the task. The start and end times are captured in adjacent cells.

If the user starts the work, and goes on a lunch break say for 20 min, comes back finishes the task and captures end time, the time difference will not consider break time which is non productive.

How can I incorporate something like 'pause' option so that before he goes for lunch he can temporarily pause the time.

View 9 Replies View Related

Calculating Start And Finish Times For A Process

Feb 22, 2010

I have a number of processes that I would like to calculate the finish times of.

For example, Process A may take 18 hours to complete, Process B may take 28 hours to complete and Process C may take 125 hours to complete etc

However these processes only run during certain times, i.e. 9am to 5pm.

Ideally I would like to setup a spreadsheet that when given the start time and process time calculates the (date and) time the process will finish.

I can get it to work on a 24 hour day but I've been tearing my hair out trying to take out the none-working part of the day (the 5pm to 9am).

View 9 Replies View Related

Providing A Start And Finish Cell Into A Range

Jan 23, 2007

I need to create a range of cells in Column A. I know the first cell, A2. The final occupied cell will vary. Once I have the range object I would like to step through and analyse each cell in turn using a For/Each loop.

The code I have so far is:

Public all_structures As Range 'Range required for for/each loop Column
Public last_structure As Range 'Last cell in Column
Public molcell As Range 'Current cell in range

' Establish range of cells in Column A

Set last_structure = Range("A2").End(xlDown)
Set all_structures = Range(Range("A2"), Range(last_structure)) ***

' Loop through each structure in turn
For Each molcell In all_structures

Loop code In here

Next molcell

When I run I get an error message of "Run-time error '1004': Method 'Range' of object '_Global' failed". It does not like the line marked ***.

View 3 Replies View Related

Operational Model - Shift Start Time Plus Amount Of Hours Worked In One Cell.

Feb 19, 2009

Is it possible that a cell contains both numeric and alphanumeric data and to do calculations on that?
For example: if a cell conatain the value "10a" or "8.5b" etc. Would it be possible to have a column that gives me the hours worked (the numeric value in the cell) and a line that gives me the amount of people that are working on shift "a" (the alphanumeric value in the cell).

Is this at all possible? Or does that require VBA/Macros and stuff (in which case this is posted in the wrong part of the forum )

View 5 Replies View Related

Automatically Populate 12 Month Calendar With Result Depending On Start And Finish Dates

Mar 26, 2014

I've just started working on an FTE calculator and wish to populate a 12 month calendar with FTE depending on the start and finshed dates.

FTE Calculator non nursing.xlsx

I've attached the file. In Column D the user would select the month the staff start and in the Column E the month the staff will finish. I would like the fte that is calculated in Column Z then to populate in the 12 columns AB:AM (Jul to Jun) with corresponding month start and finish.

View 2 Replies View Related

Time Conversion: Convert A Time From Hours/Minutes To Hours/Tenths

Oct 10, 2009

When I am converting a time from Hours/Minutes to Hours/Tenths, Excel is not converting it consitantely. EXAMPLE: 1:15 = 1.25. When I format the cell to present only one place past the decimal point, sometimes the cell will round up to 1.3, and other times it will round down to 1.2. What am I missing?

View 3 Replies View Related

Employee A Date Line Of Time Of When Pieces Should Be Finish

May 29, 2014

1-The employee takes 13 minutes to build each piece

2-The employee starts at 7:15 am

3-The employee goes to lunch from 12:15 pm to 1:00 pm

4-I need to give the employee a date line of time of when pieces should be finished. Taking into account the time he/she takes lunch.

View 2 Replies View Related

Automatic Finish Date & Time With Lunch Break And Bank Holidays

Feb 13, 2010

I would like a solution for the automatic calculation of the end date and end time for project tasks. I have already spent hours on the issue, thanks for any help on this.

The parameters are:
A1 = Start time 08:00
B1 = End Time 17:00
A2 = break lunch 12:00
B2 = back from lunch 13:00

Task parameters

A5 = start date 01/03/10 (entered manually)
B5 = start time 10:00 (entered manually)
C5 = duration 02:00 (hrs entered manually)
D5 = "end date" >>> (to be calculated exluding breaks and holidays)
E5 = "end time" >>> (to be calculated exluding breaks and holidays)

the next line should be filled in automaitically according to the hours needed and the previous end date & time

A6 = "start date" >>> (after line 5: to be calculated exluding breaks and holidays)
B6 = "start time" (after line 5: to be calculated exluding breaks and holidays)
C6 = duration 14:00 (entered manually)
D6 = "end date" >>> (to be calculated exluding breaks and holidays)
E6 = "end time" >>> (to be calculated exluding breaks and holidays)

and so on for every new line down.

View 9 Replies View Related

Display End Time Automatically Upon Entering Start Time And Time Usage

Dec 19, 2008

I have a worksheet which contains START TIME in column A, then TIME USAGE in column B and END TIME in column C. User enters start time, followed by the number of time usage in minutes, how could i possibly display the end time automatically in this scenario? how do you add the entered time usage to the start time to display the end time? Say if I enter 1:00 AM at start time and 00:15 minutes on time usage, how can 1:15 AM be displayed on the end time automatically?

View 2 Replies View Related

Format Time Cell For Greater Than 24 Hours: Hours & Minutes Only

Jan 29, 2010

Format Time Cell For Greater Than 24 Hours: Hours & Minutes Only .....

View 9 Replies View Related

Calculate Hours Between Date And Time Within Business Hours?

Apr 4, 2013

find a formula that will calculate the hours between the two below values but only take in to consideration the business hours (from 9 to 17) and exclude any weekends?

08/03/2013 13:32:00
02/04/2013 09:32:50

View 4 Replies View Related

Time Scheduling: Take Out A 30 Min Break If The Hours Worked Is Over 6 Hours

Jan 13, 2009

I am making a schedule and I would like it to take out a 30 min break if the hours worked is over 6 hours.

I have so far

A B

1 11:00 7:30

=24*(B1-A1)

Gives me 8 hours, I would like it to subtract the 30 minutes only ifthe sum is over 6 and not alter the sum if it is under 6.

View 9 Replies View Related

Calculate Hours Worked Based On 2 Start/End Times

Feb 14, 2008

It's been several years sine I had to look at calculating amount of time worked.
Can you please look at this old spreadsheet of mine and verify that the formula is correct?

It appears to be ok to me, but I don't want any errors when it comes to paying my employees

Formula: ...

View 4 Replies View Related

Add This Number To The Start Time, Factor In Break Minutes And Get To The Projected Completion Time

Mar 3, 2009

I am trying to provide a tool for department leaders to monitor productivity for order processing in their departments. The variables I have are: Number of orders(variable), number of pickers (variable), start time(variable). Then, I know each order takes 1 picker 4 minutes to pick on average, and there are 45 minutes worth of breaks during the picking process. So after entering the variables I used =(((C3*4)/60)/D3) to come up with the time needed to process the orders. What I can't get to is how to add this number to the start time, factor in break minutes and get to the projected completion time. I have Excel 2003 at work. Clearly I need to take a class!

View 4 Replies View Related

Using Userform To Calculate Time To Sheet From Start Time?

Jun 19, 2014

I have a userform that time stamps on my userform as soon as i open the form, is there a way that when I submit, that the amount of time that I was on the call to be put in my column on my worksheet as minutes?

View 2 Replies View Related

Run Macro Time: Start A Sub Running At A Selected Time

May 23, 2007

how to include a line of code, to start a sub running at a selected time? Given that the workbook is already opened before that time?

View 6 Replies View Related

Automate Macro Start On Time & Stop At Later Time

Dec 25, 2007

Can I adapt this code so that users receive the alert if they try and go to the next field without filling in the required ones, or - better - to combine it with a code that does not run a macro, but instead gives the alert, if the required fields have been missed. (I don't require anything to do with printing, this was the closest code I could find)

Private Sub Workbook_BeforePrint(Cancel As Boolean)
If Sheet1. Range("A1").Value = "" Then
MsgBox "Cannot print until required cells have been completed!"
Cancel = True
End If
End Sub

View 4 Replies View Related

Table Which Shows Time Started, Time Finished And Then A Total For Hours That Day, Then That Week

Mar 30, 2009

i am looking to do a table which shows time started, time finished and then a total for hours that day, then that week.

Start 08:00
End 16:00
Total 8 hrs.

How can I get the total to display as 8 hrs? not 08:00? When I change the format to "number" it shows 0.33?

View 9 Replies View Related







Copyrights 2005-15 www.BigResource.com, All rights reserved