Auto Creating A Calendar Based On A Date In A Cell.
Dec 30, 2009
I am playing around with creating a calendar based on a date (month) I enter into a cell. I am doing this with a simple =date+1.
I have a sample attached. Only problem I am having is that for months with 30 days I don't want the last day to show the first of the next month. But I can't simply remove that as if I entered a month with 31 days I would need it to show the 31st.
View 4 Replies
ADVERTISEMENT
Dec 4, 2013
I am trying to have the calendar in the second tab of the attached excel file to auto populate based on info in the first tab.
In the first tab, there is the start and end dates of certain projects. The calendar will need to only show the project name of every project being worked on that specific day.
Some days will have more than one project being worked on, the Calendar will just need to list them all under that day. The Start and End dates count as days the project being worked on as well. We will also need the calendar to auto update whenever we modify the dates in the first tab or add/remove projects (rows).
View 5 Replies
View Related
Jul 31, 2013
I am trying to auto generate a calendar based on two drop down menus - Month and Year.
Once the month and year is selected I want to import all work orders onto the calendar based first on the "Labor Name" found in the list of work tab, then assign each work order for that labor name to the respective date on the calendar for the month.
August PM Schedule Demo.xlsx
View 2 Replies
View Related
Jan 9, 2010
Trying to word this right. I have one cell with a date of 01/01/2010. I have other cells that I want to be equal to this cell plus 1 or more months.
For example A1=01/01/2010
I want A2 to = 02/01/2010 based on one calendar month entered into A1. So if A1 changes 03/01/2010, A2 will = 04/01/2010.
View 3 Replies
View Related
Apr 4, 2013
I currently have a worksheet that when a user clicks on the cell, a calendar form opens. From here they can select a date, click ok, and the date gets placed in the corresponding cell they clicked on.
Now if the user needs to change that date, i want them to be able to click on the cell again, and when the calendar opens, the date in the cell would be selected on the calendar. I was able to do this in a userform, but im not sure how to edit it to work on the worksheet. I am using the below to populate the calendar.
Code:
private sub worksheet_selectionchange(byval target as range)
if not intersect(target,range("aa16:aa24")) is nothing then .show calendar
When the user clicks the date, the below code places it in the cell.
Code:
private sub ok_click()
with active cell
.value=calendar1.value
end with
unload me
end sub
Now the below code was used when I was using a userform, but im not sure how to edit this to pull the date from the active cell.
Code:
privatesub userform_activate()
me.calendar1=date
if not tb is nothing then
if isdate(tb.value)then me.calendar1.value = tb.value
end if
end sub
View 1 Replies
View Related
Apr 26, 2014
I'm trying to auto populate a calender style sheet in Excel 2010 based on data from a Work Schedule sheet. The work schedule sheet contains a list of jobs, with each row representing a different job. There is a column for the start date (e.g. 25/04/14) and a column for the end date (e.g. 26/04/14). There are other columns which select resources such as people and vehicles. Each resource may appear on any one of several columns for each row, e.g. Site Operative 1, Site Operative 2 etc.
On the calendar sheet, in which one cell represents one day (e.g. 25/04/14), all the dates are shown along the top going right and all the resources are shown on the left going down.
On the calender sheet, in every cell I want a formula that will look at the Work Schedule sheet and see if that particular resource is being used on that particular date. If it does, the cell can display information from another cell such as the job number or job name to which the resource is assigned; if it doesn't, the resource isn't being used so it can display "Free" or "Available".
View 2 Replies
View Related
Nov 20, 2008
I need to send an email reminder to teachers on the day they have duty. I know how to set up an email that sends on a certain date, but I am unsure how to code it when the date changes. I have attached the spreadsheet.
In cell A 53, I have the date November 24th. In cell C53, I have the email address of the teacher doing duty that day. In cell F53, I have the date November 25th. In cell, I53 I have the email address of the teacher performing duty that day. On November 24th, the person in C53 should receive a reminder email. On November 25th, the person in cell I53 should receive a reminder email. I will have spreadsheet for every month of the year. So there will be LOTS of changing dates. How do I code this when the date keeps changing?
View 2 Replies
View Related
Jun 21, 2007
Is there a formula to set the a date in Excel based off the next full calendar quarter? In cell G2 I have the contract date: 01/26/06. I would like to have a formula in I2 that displays the first day of the next full calendar quarter, which is 04/01/06
More example dates:
if my contract date is: 10/21/05
my start date is: 01/01/06
View 3 Replies
View Related
Jan 8, 2010
I have a program where I can update the calibration due date of an item. I have attached a cut down version of my program showing the relevant areas. There is usually password protection on the worksheet so it can only be edited via the form (the vba coding removes the password protection before editing, then re-enables the password protection after editing). The "Update Calibration" button is usually on a "Menu" sheet.
Once the form is opened a serial number is typed in the textbox. The calendar button is then clicked, which brings up another form with the calendar on. The due date is selected on the calendar. When "OK" is clicked, the date label caption is then changed to the selected calendar date. When "Submit" is clicked, the spreadsheet will search for the Serial Number, once found, the label caption (being the date selected) will be entered into the cell to the right of the serial.
If the day selected on the calendar is greater than 12 the date is entered correctly onto the sheet. example: calendar date selected = 15/01/2010. shown on sheet as 15/01/2010. However, if the day selected on the calendar is 12 or less, the date is for some reason entered incorrectly onto the sheet. example: calendar date selected = 08/12/2010. shown on sheet as 12/08/2010???? What is going on here? how come the day and month are swapped around if the day is less than 12????
View 4 Replies
View Related
Dec 24, 2009
Using Excel 2007 Calendar Control:
I want to select a date of choice from a calendar in a field within an Excel spreadsheet.
I do not know how to do userforms and so that is why I wonder if I can add this in just a spreadsheet.
This is how far I have gotten so far: After doing the following, I have a static calendar setting in my spreadsheet like a text box showing the current date.
Developer
Insert
More Controls
Calendar Control 12.0
View 9 Replies
View Related
Dec 2, 2009
Kind of like what they do in airline booking web sites, where you have the option "show calendar" and you select the date from there, to avoid any possible typing mistakes. When you select the cell, a calendar or a date drop-down list should pop-up.
View 2 Replies
View Related
Feb 8, 2009
I need the code to add the selected date to a specific cell lets say cell D8
at the moment it adds the date in any cell selected
View 4 Replies
View Related
Mar 23, 2007
I've got a calendar form that populates the active cell with the date i select on the calendar. However, would it be possible for the calendar to show the cell that already has a date in it?
View 2 Replies
View Related
Aug 15, 2014
I'm trying to make my life a little easier at work. Here is what I am trying to do. I'm trying to create a "calculator" that will tell me the date that a client will leave my program. I understand that I can simply do xx/xx/xxxx-15 and it will get me a new date, easy. Here is the kicker...My office only utilizes 30 day calendars. Regardless if the month has 28 or 31 days, in the eyes of my agency it will have 30.
i'm been trying to mess around with it for 3-4 days now and I can't quite figure it out. I have attached a sample spreadsheet what i'm i'm trying to do.
I would eventually like to create this to be a little interactive (like a pop up or something that is more user friendly) but i'm just itching to get it to work!
View 3 Replies
View Related
Dec 14, 2013
Basically, it is a scheduling of approving or rejecting of request dates. whereby, i will receive the request dates from Google doc form and then i will extract the data from web into the excel. The data i receive will include the ID, Date request and Remarks.
With the Information in hand, the data will then be "plot" into a schedule (which is a year calender that i have created on excel) base on the ID requested from the web and the ID in the excel.
After plotting, i also want to check if the number requested date exceed the quota set PER DAY, if it exceed, then i have to reject, if its not then approve.
So here comes the problem.. After all the dates have reflected on the calender, I want to get the information from the calender result(which is whether the date is approve or reject) back on to respective ID and Dates requested.
I have attached a example excel for clearer view of my explanation.
View 6 Replies
View Related
May 27, 2014
I have attached a copy of a spreadsheet that I am putting together, What I need to achieve is, when a date is entered into the completion date cell the daily count down in the days left cell stops but still shows the value in that cell. The Annual or Monthly cal tabs are the ones i need the formula for.
View 5 Replies
View Related
Jun 11, 2003
I have created a user form using the addins that come with excel to create a calendar that will allow the user to select a date and automatically put that in a specific cell. My system is office 2000.
The code is as follows:
Private Sub OK_Click()
Dim i As Integer
Dim myCell As Range
i = 0
For Each myCell In Selection
myCell.Value = Calendar1.Value + i
i = i + 1
Next myCell
Unload Me
End Sub
Now, I gave it to my boss who has xp, and I get the following VB error when she chooses a date and clicks on the ok button:
Method 'Value' of object 'ICalendar' Failed
View 9 Replies
View Related
Mar 13, 2013
I have a strange problem I cannot solve in that I'm trying to create an auto filter that returns records based on a date variable.
If I set the code to equal the date variable, it returns information. If I set the code to return records AFTER the date, it returns nothing.
Code to return records on the date:
Dim startdate As Date
startdate = Format((Now), "dd/mm/yyyy")
ActiveSheet.Range("A:B").AutoFilter Field:=2, Criteria1:="=" & startdate
This returns data, however if I slightly amend it to get records on or after the date:
Code:
Dim startdate As Date
startdate = Format((Now), "dd/mm/yyyy")
ActiveSheet.Range("A:B").AutoFilter Field:=2, Criteria1:=">=" & startdate
It returns nothing. Is there a syntax problem in my code.
View 1 Replies
View Related
Sep 18, 2012
Modify Macro3 and use the InputBox function twice so that Macro3 would ask the user for a particular month and a particular year; and then Macro3 uses these user’s inputs to create the calendar template for that month of the year. For example, if the user enters February for the month and 2012 for the year, Macro3 would create a new
VB:
Sheets("Template").Select
Sheets("Template").Copy After:=Sheets(1)
Sheets("Template (2)").Select
Sheets("Template (2)").Name = "January"
[Code]...
View 1 Replies
View Related
Aug 19, 2014
I have a workbook with separate worksheets that I would like organized based on how old the data is. I want a macro that automatically cuts information from one worksheet and pastes it in the appropriate worksheet based on if it is 30, 60 or greater than 90 days old. So information will be cut from the "Archived Emails" worksheet and pasted into the "30 day archive" when it is 30 days older than today. It will then be moved from the "30 day archive" worksheet to the "60 day archive" worksheet when it is 31-60 days old, and finally moved to the "90 day archive" for anything over 90 days old.
Untitled.png
View 6 Replies
View Related
Mar 24, 2009
I am looking for an excel calendar that will auto-populate content into it based on a spreadsheet that I fill in.
Maybe I would just need the formula that would be inserted into each calendar day? I'm not sure how you would set this up, but I'm open to suggestions!
I have attached the .xls file for your reference.
For example: The comment "Client 1 - KOM" would populate in a blank calendar in excel on the date 3/23/2009.
View 9 Replies
View Related
Sep 17, 2013
I am trying to do exactly what the calendar from this thread does with the Waste Log: [URL]....
But the years only go to 2012, can someone update this for 2013? And include Saturday and Sunday on the calendar too?
View 2 Replies
View Related
May 13, 2014
On sheet 1, I have dates in column A, then numbers under LabA through C. On sheet 2, I would like the contents of columns B, C, D to autofill when entered. However, I would like to display only the last entry. For example, Lab A (column B) is currently showing "7" in cell B6, if I enter a number in B7, I would like for sheet 2 to autoupdate cell B3 and display that new entry instead of the "7".
View 1 Replies
View Related
Jul 3, 2014
So, I work in a large indoor grow facility, and as such, we need to keep an active, updated calendar of all activities that will need to happen in the grow. If something happens to a set of plants, we need to change to date of transplant into the next pot size and every transplant after that, as well as moves into the flowering room from the vegetative room.
I have tried to manually make a calendar (I'm not worried about auto-generating a calendar or auto-filling dates, only things that happen on those days.) and tie in this information, but I'm having issues automatically searching a column and finding the date, and then pulling more information from that row automatically. (i.e. If anything in Column E has the date 7/3/14, then fill the data from Column C and Column B on the same row.)
I'm attaching a copy of the spreadsheet that I am trying to pull the Data from, and a copy of the Calendar I mocked up.
FYI, the spreadsheet I am pulling from Automatically fills once you put in the Clone Date, and then if you add in an adjusted date, it will adjust all later dates from that same section.
I tried to find something other than Excel as well to do this for me, but AFAIK nothing exists to make the calendar update Live, only to reproduce a new calendar with the current spreadsheet. This is not an option, I need it to stay up to date.
View 7 Replies
View Related
Feb 28, 2013
I've put together an annual leave tracker for the department and am trying to make it as automated as possible. It currently consists of two sheets, 'Leave Applications' and 'Leave Tracker 13'.
If you look at the 'Leave Applications' sheet, I wish to be able to take this data to fill the calendar on 'Leave Tracker 13' with either AL or HL to demonstrate whether the day is annual leave or half day leave. This only wants to happen if the leave has been accepted, represented by an 'A' on the 'Leave Applications' sheet. The calendar obviously doesn't have any dates in the cells but I've got around this when it comes to shading in weekends by concatenating the date above and to the left of the cells and assume I must be able to do the same for populating it.
It's also complicated by the 'Leave Applications' consisting of multiple members of staff, though this may be ordered by date.
View 11 Replies
View Related
Jun 26, 2014
I am trying to build a Calendar that pulls all of it's entries from data submitted via user form. To be more clear, I built a basic user form in VBA where I can submit this data: name, brief description, Time/duration, and date. Instead of the data I enter into the form populating in specific cells in my Excel workbook, I would like for the information to be populated into a calendar based on the date.
View 1 Replies
View Related
Jul 28, 2009
I am trying to create an Excel spread sheet that keeps track of employees safety tickets and the dates they expire. Is there way to have a cell highlight to a color warning me 30 days prior to the due date listed?
I tried a conditional formatting as suggested in
[url] but that does not work.
I am using Microsoft Office Excel 2003 (MS Office Standard)(SP3)
View 9 Replies
View Related
Aug 23, 2013
Looking to create a calendar in excel and auto-populate the content with specific fields I enter. I know how to create an excel gantt chart but I'm really looking for a calendar view instead of a series of columns with dates. I reviewed the original post on Auto-Populating Excel Calendar but was confused by the instructions. (1) create a calendar in excel and (2) show me how to populate the calendar with fields like (dept and project name) into the dates on the calendar? I have two dates that are important (a due date for the project and when that project will be published). Is there a way to have both dates show info otherwise the most important date will be the publish date?
View 1 Replies
View Related
May 30, 2013
I'm using Excel 2010. I need to populate a daily calendar with the number of nights spent, extracted from the Date of Arrival and Date of Departure of individuals.
View 2 Replies
View Related
Oct 10, 2009
if Row i Column j is activated then a corresponding variable Aij, Bij, Cij or Dij would be created (if not already existing), or cumulated by 1. The problem as I see it - completely generalised - is to create a variable where the variable name itself is formulaic, as well as its value. I know SAS would have no problem with this due to the order in which it parses data steps, but I'm pretty amateur with other programming languages so I don't know if this is blindingly obvious or downright impossible!
View 3 Replies
View Related