Excel 2000 - Show Billable Days
Dec 16, 2008
I have been asked to create a spreadsheet that will contain three fields;
Date of placement (the day the person arrived)
Date of release (the above + 60 days)
Billable days for the current month
The first is simple, the clerk will enter the current date when the person arrives.
For the second field I am using:: =SUM(H5+(60),) (H5 is todays date, and will display the results in I5). When H5 is blank, I get the " #VALUE!" error in I5? Is there a more effective function to use?
For billable days, I am using; =SUM(J2 - (H5),) (J2 is simply the last date of the month; 12/31/09, and H5 is the placement date). I want to show the number of billable days in the current month. This will be repeated on 12 sheets (one for each month).
View 10 Replies
ADVERTISEMENT
Jun 6, 2008
I am trying to capture billable and non-billable expenses in a time sheet by date. I thought it was pretty simple, but after a few days of battling with the syntax (I am pretty new to macros)
I have attached the file I am referring to and highlighted in yellow the significant cells.
1. Trying to get data from the all expense sheets to the "Time Sheet" Tab by date and category.
2. Need to show the billable expenses expanded out to each category (meals, hotel, etc.) by date.
3. All nonbillable is summed up in one column by date.
June expense report has:
Date of ReceiptExpense Type "Billable? Total USD
01-Jun-08 Airfare Yes - Recoverable$2,000.00
01-Jun-08 Airfare Yes - Recoverable$2,000.00
01-Jun-08 Ground Transport No - Training$20.00
05-Jun-08 Meals & Entertain Yes - Recoverable$15.00
05-Jun-08 Meals & Entertain Yes - Recoverable $50.00
1) There are TWO June 1, 2008 items that are "Airfare" & "Billable", therefore in the "Time Sheet Tab, I need it to show that under "Billable Airfare" for June 1, 2008 that it is $4,000.
2) Same as June 5, 2008 for Meals & Entertain.
3) All Non-billable (No - Training; No - XXXX; anything with NO) are summed up in one column by date in the "Time Sheet Tab"
4) There are multiple Expense reports and I need the macro to run through all of them dynamically as they input the data in to show on the "Time Sheet" tab.
This would make my job a lot easier if I could get this running. I dont' think it is too complex, but obviously too complex for me. I started on some of the vba below. I do not have all the parts yet, weird thing is, it did spit out a number, but now it is not. I'm at a loss.
...................................
View 9 Replies
View Related
May 24, 2013
I have created a excel file which stores attendance for my employees.
The format is like
Select month in one cell
select year in other cell
And from cell e8 to ai8 i have nos (1-31) represent no of days in a month:
a8 - 1
b8 - 2
c8 - 3
d8 - 4 like wise till ai8
Now I want a calender where user need to select the YEAR, and then MONTH and based on the above selection both days as well as date (not the month and year) should be displayed.
I am currently using this formula "=IF(ISERROR(--(COLUMNS($E8:$E$8) & "-"&$C$2)),"",COLUMNS($E8:$E$8))" for date and your vb code to hide the cells depending on days of months.
I need something like this
sun mon tue wed thur fri sat sun mon
1 2 3 4 5 6 7 8 9
View 3 Replies
View Related
Mar 20, 2014
Excel 2010 - I need to create a graph that shows a week's use of a sportsground showing what sports were played, on which days and between which times. I thought I could show the times on the vertical axis, days on the horizontal axis and then the sports played in those times, however I'm unsure as to how to get the graph to recognise the times.
I've attached an example of some data and how I'd like to see it, I'm just not sure how I can do this using the chart set up!
Attached File : Graphs.xlsx
View 10 Replies
View Related
Mar 14, 2014
I am making process TAT(Turn Around Time) which required following information. In Excel 2007.
1-Count number of days between two dates where working days are (Sun to Thursday). So required to exclude (Friday,Sat + Holidays)
A1-Start Date Mar/01/2014
B1-End Date Mar/31/2014
C1-No Of Days 22
D1-Days between two dates 21
E1 To E10-Holidays
2-Count number of days between two dates where working days are (Sat to Thursday). So required to exclude (Friday + Holidays)
A1-Start Date Mar/01/2014
B1-End Date Mar/31/2014
C1-No Of Days 27
D1-Days between two dates 26
E1 To E10-Holidays
Note : Any weekend (off days) dates listed in holidays should not effect the query.
View 9 Replies
View Related
Jun 1, 2009
I've developed a workbook with macros in Excel 2007 (Compatibility
Mode), Windows Vista Operating System. The purpose of the Macos
is to allow auto complete on a validated data entry field.
The macros run fine on this platform. I then copied the workbook
to my desktop, Excel 2000, Windows 2000 Professional Operating
System. One of the macros is killing Excel on this platform.
View 14 Replies
View Related
Dec 27, 2011
color tabs for Excel 2000 add-on
Any freeware (or shareware if necessary) program that will allow you to change tab colors on spreadsheets in Excel 2000. Later versions do have that ability built in, but 2000 does not.
View 1 Replies
View Related
Aug 18, 2009
I am actually using a basic formula to compute for the Staff OT based on the type of OT. see more details below.
JULY '09 (Worksheet1)
ABCBEFGHIJ5DateDayOT StartNo. of OT hoursOT TypeAttending EngineerRefDetailsCost6July 02, 2009Thu8:00 AM1111.00HolEngineer 1169504client support3,300.007July 03, 2009Fri6:00 PM11.00RegSystem Analyst169556support IT Manager, Albert's turn-overs assistanceneed formula8July 06, 2009Mon4:00 PM55.50RegEngineer 1169504midyear SR meeting supportneed formula9July 06, 2009Mon6:00 PM11.00RegSystem Analyst169556generate SIP data for the conf, setup SMRAS300.0010July 08, 2009Wed6:00 PM11.72RegSystem Analyst169556ZPC datat testing, attendforumsneed formula11July 09, 2009Thu5:00 PM22.50RegEngineer 1169504midyear SR meeting supportneed formula12July 10, .....................................................
View 9 Replies
View Related
Apr 26, 2014
I am creating a chart with more than 2000 dates (each day). How can I format the axis so it only displays the 1st day of each quarter (01/01/2010, 01/04/2010, 01/07/2010...).
At the moment I cannot format the axis and minor/major units remain numbers.
I am using Excel 2010 and European date format.
View 2 Replies
View Related
Aug 28, 2013
I record all jobs that come into my department. Column A contains the Job reference. Column B Contains the date that the job arrived and Column C contains the date that the job was complete.
The job can be split into several sections and can arrive on different days and the sections can be completed in different days.
I am looking to create a table that will show how long the complete job took to complete, so I am looking for the earliest date and the latest date for specific job reference numbers.
An example of my data is:
Column A Column B Column C
Ref No Date In Date Out
2013-0055 01/03/2013 25/03/2013
2013-0061 01/03/2013 03/03/2013
2013-0061 02/03/2013 20/03/2013
2013-0055 07/03/2013 28/03/2013
2013-0061 08/03/2013 19/03/2013
From the above data I am looking to create a table that will show
Ref No First Date Last Date Number of Days
2013-0055 01/03/2013 28/03/2013 28
2013-0061 01/03/2013 20/03/2013 20
I am using Excel 2000.
View 4 Replies
View Related
Jun 9, 2014
the macro works fine until it executes the paste values. At that point, the macro jumps to the "CountThem" function which is located in another workbook. The data that I am copy/pasting is in no way connected to any cells that are using that function. Although, other values in the workbook are passed down from data that uses that function.
I am still in the dark ages using Excel 2000.
This is the code for my macro.
Code:
Sub Current_to_Raw()
'
' Current_to_Raw Macro
' Macro recorded 2/12/2014 by
'
'
Range("N14").Select
[code]....
View 2 Replies
View Related
Feb 28, 2009
I need to calculate billable hours.I have a start date/time and end date/time.Then I need to subtract out all time between 05:00:00.000 and 20:00:00.000. These are not billable hours.But I can include all weekend time.And I can include all holiday time.I need to accomplish this with formulas, no macros.
View 2 Replies
View Related
Jul 8, 2012
I have a single spreadsheet that I save as multiple web pages [the sort and total options differ].
Is there an easy way to include a javascript snippet in the saved page without having Excel mangle the code by &ing the "<" and so on?
Excel 2000 on XP
View 1 Replies
View Related
Jul 18, 2008
I am using the following
xlrng.cells(5,1).resize(5,5) = myarray
If my array contains a text column with any text cell element > 900 bytes
office 2003 and greater blow up
in office 2000 it automatically truncates it without blowing up
if i write my own load loop, and load each cell individually
it works great no-poroblemo, its just extremely slow!
Is there any magic way to get this working correctly without truncation
and without blowing up?
View 9 Replies
View Related
Aug 15, 2013
Currently I'm using excel 2000. Can't hide hidden column when save as webpage?
View 2 Replies
View Related
Aug 12, 2013
I have a formula that returns me a result in hours. I have a result of 1712 hours but when i try and formatt the cell to show days is says 11. (Which obviosuly isnt right)
Is there anyway to show the correct number of days?
View 2 Replies
View Related
Nov 6, 2008
I have a form for people to submit their monhthly total number of hours worked.
At the top of the form the user will write their details etc followed by selecting which month of the year it is (in the form of a drop down menu).
In cells D24 to D54 I have numbers 1 to 31 to represent the min and max number of days in a month.
Is there a way I can structure my form so if I select September from my drop down, only 30 days will show?
View 9 Replies
View Related
Apr 9, 2009
how i can fix the formula below to show the number of remaining days between the given date and the current date.
View 3 Replies
View Related
Apr 1, 2009
I have the foollowing equation in a cell:
=NETWORKDAYS(A2,A12)+G12
My answer is 1081:23:42.
Is there a way to have it show the number of days, hours, minutes and seconds? So it will say 45:1:23:42? (45 days, 1 hour, etc...) Or something along these lines?
View 9 Replies
View Related
Feb 13, 2013
I wanted to determine the number of days between two dates. Specifically, if the initial date is in one month, and the second is in a different month and an output would result a number of days in each month until the final date. BUT I have a large amount of data to do this for in a list view, way to put a formula in excel and just drag down the entire list to get the required information. see below for an example.
The result I'm looking for is the separate the months and only show the relevant months between the two dates in one cell or the adjacent. Something similar to the table outlined below.
Input Data
Result
Start Date
[Code]....
View 3 Replies
View Related
Oct 30, 2013
Excel (2000), what formula would I use to accomplish the following?
If A1 equal or less than 1000 value, multiply by B1, otherwise multiply by C1.
View 9 Replies
View Related
Dec 19, 2008
I have a series of data that acts upon a traffic light system, i.e. Green, Amber and Red. These variables are posted along row 1 for example and there are 10 columns. Per column I have a tick and cross to answer a question. How can I find out how many ticks were on green days, amber days and red days? I have attached an example.
View 4 Replies
View Related
Nov 9, 2012
I have a spreadsheet with 6 months of data in one row. the dates are from A3 (Jan 1) to FY3 (Jun 30). The data is in range A4:FY4. The data is a "$" (without quotes). The $'s are entered randomly during the 6 month period. I need a formula to determine the days between the last occurrence and the next to last occurrence of the $. Example spreadsheet shows the $'s on Mar 28 and May 5 as the last two. The spreadsheet is attached. I am using Microsoft Office Excel 2010.
View 6 Replies
View Related
Dec 5, 2013
I have flowing cells in excel:
1
2
3
4
5
6
7
8
9
10
11
12
First row are months (number representing specific month). I would like use conditional formating and color cell below month if that cell is empty and if it is more that 15th of that month.
To be more specific. If we look at last column (since we are already in december). Since today is 04 december the cell below "12" should remain uncolored. But when the date will be 16th of december I want that cell to color orange. Since it is blank. But if there would be a number in it, cell should remain blank even after 16th of december.
View 9 Replies
View Related
Apr 8, 2013
I am using Excel 2010. The template only has 5 working days in it, but I need to set 6 working days (Saturday is also working day). Wondering, how to get this working without spoiling the functions. Also the date format is in US , need to change to UK without disrupting the Formula/Functions.
View 12 Replies
View Related
Jul 28, 2014
calculate the running total of time spent in the attached spreadsheet.
View 8 Replies
View Related
Dec 2, 2009
How to determine how many days are remaining in the quarter after I provide it a specific date. Ultimately I am trying to build something where if I enter a date it will break down how much it will contribute for the remaining current quarter and for one full year (on a quarterly basis).
For example lets say I buy gumball machine today and I know that it will contribute X dollars for 2009 and X+1 dollars in 2010. I would like to break it down quarterly and have it say - you will get X for the rest of the quarter in 2009 and X for each quarter in 2010.
View 3 Replies
View Related
Jan 6, 2010
I am trying to use the NETWORKDAYS function in excel to calculate the working days for my company. the problem is I m located in UAE and here Saturdays and Fridays are official days off for my company. Now the problem is that the excel have this built in function that Sunday and Saturdays are weekend days. I want to customize the function for my local days off for my company.
View 14 Replies
View Related
Nov 23, 2012
I am trying to calculate mandays starting from 1st December 2012 to 29th March 2013, and i want to count the days excluding the weekends, formula, i am trying NETWORKDAYS, i use MS2007.
View 2 Replies
View Related
Jan 5, 2013
Working on Excel 2010
Need a formula to calculate the number of leave days.
C3 - Start Date, e.g. 01/07/2011
D3 - Calculation date, e.g. 31/12/2012
E3 - Number of months - ??????? Forumal need from 01/07/2011 to 31/12/2012
F3 - Days per month, e.g. 1.25
G3 - E3*F3
View 6 Replies