ABCDEFGH11-Jun-08123412:30 PM12:32 PMHi GuyI want Date and Time should appear automatically when I entera number in C1 column I have certain conditions I need to capture the start time and end timecan you help me in this For example When I enter a number in C1 column the date must automatically appear in A1 column like wise I need start time must come automatically in D1 column when I move or use tab key to next column E1 the end time should come in E1 colcan you help me in this as shown in the above exampleI need this as soon as possiable
View 9 Replies
ADVERTISEMENT
Dec 19, 2008
I have a worksheet which contains START TIME in column A, then TIME USAGE in column B and END TIME in column C. User enters start time, followed by the number of time usage in minutes, how could i possibly display the end time automatically in this scenario? how do you add the entered time usage to the start time to display the end time? Say if I enter 1:00 AM at start time and 00:15 minutes on time usage, how can 1:15 AM be displayed on the end time automatically?
View 2 Replies
View Related
Mar 3, 2009
I am trying to provide a tool for department leaders to monitor productivity for order processing in their departments. The variables I have are: Number of orders(variable), number of pickers (variable), start time(variable). Then, I know each order takes 1 picker 4 minutes to pick on average, and there are 45 minutes worth of breaks during the picking process. So after entering the variables I used =(((C3*4)/60)/D3) to come up with the time needed to process the orders. What I can't get to is how to add this number to the start time, factor in break minutes and get to the projected completion time. I have Excel 2003 at work. Clearly I need to take a class!
View 4 Replies
View Related
May 5, 2006
I have a user form with textBox1 = start time (entered as "[h]:mm") and text Box2 = finish time (entered as "[h]:mm"). I would like textBox3 to display the difference between the start time and finish time as a general number!
For example
Start time: 21:00
Finish time: 06:30
Hours worked: 9.50
Start time: 12:30
Finish time: 23:00
Hours worked: 10.50
View 9 Replies
View Related
Jun 19, 2014
I have a userform that time stamps on my userform as soon as i open the form, is there a way that when I submit, that the amount of time that I was on the call to be put in my column on my worksheet as minutes?
View 2 Replies
View Related
May 23, 2007
how to include a line of code, to start a sub running at a selected time? Given that the workbook is already opened before that time?
View 6 Replies
View Related
Dec 25, 2007
Can I adapt this code so that users receive the alert if they try and go to the next field without filling in the required ones, or - better - to combine it with a code that does not run a macro, but instead gives the alert, if the required fields have been missed. (I don't require anything to do with printing, this was the closest code I could find)
Private Sub Workbook_BeforePrint(Cancel As Boolean)
If Sheet1. Range("A1").Value = "" Then
MsgBox "Cannot print until required cells have been completed!"
Cancel = True
End If
End Sub
View 4 Replies
View Related
Feb 7, 2014
the vendor has a 21 hr working window; start from 7am and goes until 4am; Mon to Fri.
Here is a scenario:
- i request for a product information from a vendor on 3-Feb-14 8:00am (Monday)
- he replies with all of the product info on 6-Feb-14 12:00pm (Thursday)
can you find the time in above scenario consideration the working window?
Here is another scenario:
- i request for a product information from a vendor on 6-Feb-14 8:00am (Thursday)
- he replies with all of the product info on 11-Feb-14 12:00pm (Tuesday)
- Sat & Sun are days off but keep in mind that my Friday shift ends on sat at 4am so the networdays formula wont work.
View 2 Replies
View Related
Sep 25, 2009
I have a workbook that is generated from the system(AS400)but it wont subtract the time finish -time start. I get a #Value error in the cells I tried two different formulas.
View 2 Replies
View Related
May 3, 2008
This may be a bit vague but here goes.
I have to calculate the difference between the start time and end time of a job. The only catch is, how can I avoid calculating "out of hours" time. So, if a job goes from 9am to 9am the next day, I want it to avoid calculating between the hours of 23:30 and 03:30.
Another example is if a job goes from 02:00 to 04:00, I want it to avoid the tim between 02:00 and 03:00.
If there is a difference in days, so the job goes overnight, how do I take that into consideration also.
View 9 Replies
View Related
Nov 14, 2006
I want to copy and paste a PARTICULAR RANGE from one workbook to another workbook. I want to select the data range from "09:55:00" to "10:00:00" which is in the cells in Column "A" an copy paste it to another workbook. The rows are not constant. The data "09:55:00" to "10:00:00" can e present on any row but is present on the same column i.e "A".
View 2 Replies
View Related
May 8, 2014
How to find the elapsed time between two times, but I need the start time in this instance.
Attached is my spreadsheet for a callcenter in which has exported data showing what time the data is exported and how long someone has been their state if they are out of adherence. I have selected fields explaining what I am wanting where on the spreadsheet.
I am wanting to subtract the elapsed time in MM:SS from the End Time which is in HH:MM AM/PM (Imported as text). I do not mind moving these to separate cells to the left to format them correctly, I want to be able to right click in A1, paste, and the rest trickle.
I am having difficulties subtracting the time to get the start time.
Time Conversion (IEX Import).xlsx‎
View 5 Replies
View Related
Mar 3, 2009
I have four different times on my report, enroute, on scene, clear of scene, in service. I need to make sure that the user's input for each time is < or = the previous time. Also I would like for my time to show in 24 hr format. Do I need to change my clock or can I do it without changing the clock format. users will use the CTRL +SHIFT+: to insert the current time
View 2 Replies
View Related
Feb 6, 2008
I'm not getting that early in the morning
In A1 I've the start time
In B1 I've the end time
in C2 I have a time value ie 6:30 AM
I need a formula IF C1 is between the start time and end time to return the value 1 and if not to return 0
View 2 Replies
View Related
Nov 23, 2012
I have a set of call data including start time and end time, with all calls on the same date. Now, how would I show in a sepearate column the concurrent calls being made. i.e how many calls are being used at the same time. This relates to how many channels I can suggest to someone with the maximum concurrent calls being made.
I have attached someConcurrent CaConcurrent Calls sample.xlsxsample.xlsx sample data.
View 3 Replies
View Related
May 1, 2008
I get the following VB pop-up every time I start Excel 2007 (I can't easily find a way to paste an image here, so plain text is used):
Microsoft Visual Basic
Run-time error '-2147467259 (80004005)':
Method 'Add' of object 'CommandBarControls' failed
Continue End
I suspect it's a keyboard shortcut for launching some other application that is in conflict with an Excel shortcut, but I can't debug, so I can't determine this.
Excel opens up fine when I click End.
View 9 Replies
View Related
Aug 24, 2006
When doing weekly scheduled in excell, is there a way to record a start time and an end time in the same cell and then have excell total hours scheduled from data entered into that one cell.
View 4 Replies
View Related
Apr 15, 2014
I am trying to get the start time and finish time for breaks.
I have 4 columns Name, status, start, finish. In the name column there are multiple names, under status there 6 different status's. and under the time columns there are in and out times dependant on status. I am trying to us index match match. I have tried vlookup and hlookup as a nested function. I keep getting errors.
NameStatus MessageStart TimeFinish Time
Cameron WilliamsTech All & Billing12:31:4812:31:52
=index(starttime,match(name,namefield(match,"on lunch",starttime)))
[Code]......
View 1 Replies
View Related
Mar 25, 2014
I am working on an excel spreadsheet for work and I have to show a chart that shows the time of day a space is in use. Right now I am having to mark all of these by hand which takes me forever because I have a couple thousand lines of information.
I need to mark the hours in use based off the start and finish time.
For Example:
1) If the start time was 7:00 and the end time was 10:45 then the markers would only mark 7am and 10am
2) If the start time was 7:15 and the end time was 10:00 then the markers would only mark 7am and 9am
3) If the start time was 7:30 and the end time was 10:30 then the markers would only mark 7am and 10am
4) If the start time was 7:45 and the end time was 10:15 then the markers would only mark 8am and 9am
I was given the formula and it works to count the whole hour but now I need the formula tweaked and I don't know how...I need the formula to account for quarterly hours...and I don't know how to fix it.
Attached is an example of the spreadsheet of what I currently have and of what I need. Book1.xlsx
View 2 Replies
View Related
Oct 1, 2009
I’m working on a timesheet and I need to separate the hours worked that are before 6 am from all the others. For example if someone works 1:00 am to 8:00 am I need a cell to populated with 5 representing the hours worked before 6 am. The formula below works fine except when the start time is 12:00 am. I am also having trouble if the start time is before midnight like in a 11pm to 5 am shift.
=(IF(AND(S3<=$AG$97,S3>=$AG$73),(($AG$97-S3))*24,0))
S3 is the start time
AG97 is 6:00 am
AG73 is 12:00 am
View 4 Replies
View Related
Jun 9, 2013
I want to assign a macro of start time and end time on one button. I tried but its not working..
View 2 Replies
View Related
Jul 27, 2014
I'm trying to create a spreadsheet for irrigation system program times. Each program has a start time, say 2 a.m. Multiple zones then run for varying times in a cycle. I need to add the run time to the start time to produce the next start time, and continue that through many zones. I can get the first few by simply formatting the cells as ##:## and using =F2+G2 (the start time is in F and the run time is in G) using 20 minute run time as a test. But when it gets to the third zone, my results show 2:60 a.m. and all results are incorrect from there on. Is there any way to do what I need in Excel?
View 2 Replies
View Related
Apr 30, 2009
I am trying to create a time sheet where there will be a start time - end time - number of hours (difference between the 2) - pay rate - total pay, but am getting strange results!
View 9 Replies
View Related
Feb 27, 2010
Is it possible to calculate hours if both the start and end time are in the same cell. Unfortunatly the developers of our scheduling program developed it so when you export the schedule to excel it shows Greg in A1 and 3:00pm-9:00pm in A2. I would like to have excel calculate the 6 hours so I can use it to auto generate another spread sheet I am making.
View 10 Replies
View Related
Mar 13, 2014
I have a small project at work where I am being asked to put a simple spread sheet that will calculate a start/stop time - and also include the date. For example:
Start time 5pm, date: 3/13. The spread sheet to auto calculate what the stop time and date will be if a specific amount of hours is to be calculated. For example in this case, 12 hours. From calculating in my head that would be 5am the following day. However, how can I get this in excel to work and therefore all i would have to do is enter the start time and date, + 12 hrs, and excel would calculate the time/date after the additional 12 hrs.
View 3 Replies
View Related
Dec 13, 2013
test.xlsx
I need to calculate the time elapsed between start and finish dates. I've figured the TODAY function, as explained here but I'm referring solely to dates in cells. How to?
View 1 Replies
View Related
Mar 6, 2014
I am trying to calculate the average start time for a machine over a period. However the machine start time varies from 10:00 pm to past midnight. I have tried reviewing past posts but cannot seem to find a similar query.
View 13 Replies
View Related
Aug 15, 2012
I have a delivery time programm (clients to be delivered the next day) which I would like to run every night at a specific time. Is there any MS tool to trigger the Excel file? Or do we have to use the "old" batch file ( if yes, pls send example)?
View 2 Replies
View Related
Dec 26, 2013
We have a person who work in 24/7 support. One person work passive 24 hour, but it 24 hours are divided in to next shifts: normal 06-18, over hours 18-22, night hours 22-06.So if we have some one who is supporting client say from 17h till 23h, we have next results:
Name Start time End Time 06:00 - 18:00 18:00 - 22:00 22:00 - 06:00
John 17:00 23:00 1:00 4:00 1:00
Is it possible to in time range enter formula who subtracted end time from start time, but taking into account 24 hours?
View 9 Replies
View Related
Feb 12, 2014
I am trying to come up with a formula that calculates total time someone has worked in a day. The scenario is an individual will work at a home and start working with an individual. Their start/end times look like this in a pivot:
Min Start Max Start Min End Max End
Location A+Counselor A 8:56 AM4:01 PM 1:11 PM 7:00 PM
Location A+Counselor B 12:00 AM 8:00 PM 6:00 AM 11:59 PM
Location B:Counselor C 7:00 AM 12:00 PM 2:00 PM 4:00 PM
Location C+Counselor D 8:00 AM 8:00 AM 4:00 PM 4:00 PM
Some people work split shifts while others work a straight shift. The formula I created was this:
=IF(OR(B9=C9,E9=D9,D9=C9),E9-B9,IF(D9>C9,((E9-D9)+(C9-B9)),IF(C9>D9,((D9-B9)+E9-C9),"New Formula Needed")))*24
(I use a pivot table to show max min for start and end times)
This works great except for the individuals that have multiple punches during the same time frame. The one scenario I am having trouble solving for is when someone punches in more than once during their shift displaying. This occurs when a counselor starts a shift working with one person but then adds another person mid shift. An example of this could be:
Location A+Counselor E Min Start Max Start Min End Max End
Consumer 1 1:00 PM 1:00 PM 8:30 PM 8:30 PM Total Time: 7.5
Consumer 2 12:00 PM 12:00 PM 2:35 PM 2:35 Pm Total Time: 2.6
Pivot says that they worked a total of 10.1 because it is grabbing the max and mins and calculating. The actual total time worked is 8.5 hours in reality.
The raw data comes in like so:
Location Counselor Consumer Start Time End Time
A A A 1:00 PM 8:30 PM
A A B 12:00 PM 2:35 PM
A A C 12:00 PM 5:00 PM
Is this solvable with a formula?